Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Bucks. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0014-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR(MECHANICAL- DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $60.84 | $48.38 |
| BOIL0013-008 | BOILERMAKER | $55.00 | $35.48 |
| BRPA0001-016 | BRICKLAYER(INCLUDING POINTING, CAULKING, AND CLEANING) | $48.70 | $31.42 |
| CARP0167-001 | CARPENTER(INCLUDES, ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALL HANGING, METAL STUD INSTALLATION, FIRESTOPPING, FORM WORK, GUTTER INSTALLATION, METAL FLASHING INSTALLATION, METAL ROOF INSTALLATION, SCAFFOLD BUILDING AND SIDING INSTALLATION- METAL, ALUMINUM, AND VINYL) | $46.65 | $29.84 |
| CARP0251-004 | CARPENTER(FLOOR LAYING - HARDWOOD, CARPET AND VINYL ONLY) | $51.67 | $31.69 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| PLAS0592-037 | CEMENT MASON/CONCRETE FINISHER | $48.70 | $32.26 |
| ELEC0098-007 | ELECTRICIAN(INCLUDING ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, LOW VOLTAGE WIRING AND SOLAR PANEL WIRING AND INSTALLATION; EXCLUDES HVAC/TEMPERATURE CONTROLS INSTALLATION) | $58.63 | $46.58 |
| ELEV0005-002 | ELEVATOR MECHANIC FOOTNOTES FOR ELEVATOR MECHANICSA. PAID VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE OR 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $71.85 | $38.44 |
| PAIN0252-007 | GLAZIER | $46.09 | $34.83 |
| IRON0401-006 | IRONWORKER(REINFORCING AND STRUCTURAL) | $56.50 | $45.30 |
| SUPA2011-036 | IRONWORKER, ORNAMENTAL | $34.27 | $22.55 |
| LABO0135-002 | LABORER(MASON TENDER- BRICK, CEMENT/CONCRETE) | $36.37 | $25.32 |
| LABO0135-002 | LABORERCOMMON OR GENERAL | $35.85 | $25.32 |
| LABO0413-010 | LABORERCONCRETE WORKER | $37.25 | $25.42 |
| ELEC0126-009 | LINE CONSTRUCTIONLINEMAN | $62.54 | $32.92 |
| BRPA0001-016 | MASON - STONE | $48.40 | $31.95 |
| CARP0219-005 | MILLWRIGHT | $54.54 | $38.78 |
| SUPA2011-036 | OPERATORDRILL | $28.55 | $15.78 |
| PAIN0021-029 | PAINTER(DRYWALL FINISHER) | $38.77 | $30.72 |
| CARP0474-004 | PILEDRIVERMAN | $48.25 | $44.92 |
| PLUM0420-012 | PIPEFITTER(INCLUDING HVAC PIPE AND HVAC UNIT INSTALLATION) | $72.52 | $44.58 |
| PLUM0420-013 | PIPEFITTER(MECHANICAL EQUIPMENT SERVICEMAN (HVAC PIPE AND UNIT INSTALLATION ONLY)) | $72.52 | $44.58 |
| PLAS0592-014 | PLASTERER | $45.08 | $33.59 |
| PLUM0690-011 | PLUMBER | $70.53 | $38.81 |
| ENGI0066-047 | POWER EQUIPMENT OPERATOR(MECHANIC) | $28.37 | $15.66 |
| ENGI0542-034 | POWER EQUIPMENT OPERATOR(PUMP) | $48.16 | $32.62 |
| ENGI0542-034 | POWER EQUIPMENT OPERATOR(CRANE, GRADALL, BULLDOZER, BOBCAT/SKID STEER/ SKID LOADER, GRADER/BLADE, LOADER, PAVER (ASPHALT, AGGREGATE, AND CONCRETE), BACKHOE/ EXCAVATOR/ TRACKHOE, BOOM, CONCRETE PUMP, CRUSHER, DRILL RIG CAISSONS, MILLING MACHINE) | $54.27 | $34.42 |
| ENGI0542-034 | POWER EQUIPMENT OPERATOR(HOIST (SINGLE DRUM), FORKLIFT (ALL TYPES)) | $50.18 | $33.22 |
| ENGI0542-034 | POWER EQUIPMENT OPERATOR(HOIST (WITH TWO TOWERS)) | $54.27 | $34.42 |
| ENGI0542-034 | POWER EQUIPMENT OPERATOR(OILER, ARTICULATING TRUCK OPERATOR) | $47.17 | $32.33 |
| ENGI0542-034 | POWER EQUIPMENT OPERATORROLLER | $50.18 | $33.22 |
| ROOF0030-013 | ROOFER(INCLUDES WATERPROOFING, EXCLUDES METAL ROOF INSTALLATION) | $40.33 | $32.62 |
| SHEE0019-020 | SHEET METAL WORKERINCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $62.62 | $50.66 |
| SFPA0692-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $66.22 | $34.25 |
| BRPA0001-017 | TILE FINISHER | $26.05 | $21.00 |
| BRPA0001-017 | TILE SETTER | $51.36 | $30.02 |
| SUPA2011-036 | TRUCK DRIVERDUMP TRUCK | $21.31 | $0.00 |