Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Blair. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0023-008 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 |
| BOIL0154-003 | BOILERMAKER | $48.28 | $33.17 |
| BRPA0009-044 | BRICKLAYER(INCLUDING POINTING, CAULKING, CLEANING) | $34.14 | $22.00 |
| CARP0423-009 | CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION,BATT INSULATION,DRYWALL HANGING,METAL STUD INSTALLATION,FLOOR LAYING-CARPET AND VINYL,FORM WORK AND GUTTER INSTALLATION;SCAFFOLD BUILDING AND FLOOR LAYING-HARDWOOD FLOORS.) | $33.01 | $18.09 |
| PLAS0526-014 | CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 |
| ELEC0005-016 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) |
| $50.86 |
| $31.78 |
| PAIN0751-002 | GLAZIER | $25.40 | $25.47 |
| IRON0003-013 | IRONWORKERORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 |
| LABO0125-005 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $30.24 | $12.05 |
| LABO0824-002 | LABORERMASON TENDER-BRICK | $29.56 | $17.05 |
| SUPA2011-035 | LABORERCOMMON OR GENERAL | $18.15 | $9.76 |
| BRPA0009-044 | MASON - STONE | $34.14 | $22.00 |
| CARP0443-004 | MILLWRIGHT | $43.00 | $23.44 |
| SUPA2011-035 | OPERATORFORKLIFT, ALL TYPES | $23.69 | $13.13 |
| PAIN0057-035 | PAINTERBRUSH, ROLLER, AND SPRAY ONLY | $30.56 | $23.72 |
| PAIN0057-035 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $32.39 | $23.26 |
| PLUM0520-013 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $41.36 | $29.45 |
| PLAS0526-025 | PLASTERER | $29.20 | $12.86 |
| PLUM0354-009 | PLUMBER(INDUSTRIAL) | $47.75 | $26.55 |
| PLUM0354-012 | PLUMBER(EXCLUDES WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 |
| ENGI0066-041 | POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER, DRILL, GRADALL, GRADER/BLADE, PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 |
| ENGI0066-041 | POWER EQUIPMENT OPERATORHOIST, PUMP | $29.70 | $21.32 |
| ENGI0066-041 | POWER EQUIPMENT OPERATOROILER | $29.70 | $21.32 |
| ENGI0066-041 | POWER EQUIPMENT OPERATORROLLER | $32.25 | $21.32 |
| ENGI0066-041 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE, BULLDOZER, CRANE* LOADER, MECHANIC) *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 |
| SUPA2011-035 | ROOFERWATERPROOFING ONLY | $29.50 | $21.10 |
| SUPA2011-035 | ROOFER, EXCLUDES WATERPROOFING | $33.50 | $20.66 |
| SHEE0019-017 | SHEET METAL WORKERHVAC DUCT INSTALLATION ONLY FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $45.02 | $44.09 |
| SUPA2011-035 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $32.03 | $22.87 |
| SFPA0669-004 | SPRINKLER FITTER(FIRE SPRINKLERS) | $49.75 | $28.96 |
| BRPA0009-011 | TILE FINISHER | $28.76 | $17.16 |
| BRPA0009-011 | TILE SETTER | $35.64 | $21.63 |
| SUPA2011-035 | TRUCK DRIVERDUMP TRUCK | $23.36 | $7.60 |