Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Snyder. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0023-008 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $40.00 | $29.81 |
| BOIL0154-007 | BOILERMAKER | $48.28 | $33.17 |
| BRPA0005-066 | BRICKLAYER(INCLUDING POINTING, CAULKING, AND CLEANING) | $32.66 | $21.58 |
| CARP0287-013 | CARPENTER(INCLUDES DRYWALL HANGING, METAL STUD INSTALLATION, FORM WORK AND SCAFFOLD BUILDING; EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $36.84 | $20.19 |
| SUPA2011-022 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $25.71 | $12.02 |
| SUPA2011-022 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CEMENT MASON/CONCRETE FINISHER |
| $19.81 |
| $9.03 |
| ELEC0607-008 | ELECTRICIAN(EXCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, HVAC/TEMPERATURE CONTROL INSTALLATION AND LOW VOLTAGE WIRING) | $41.00 | $31.06 |
| ELEC0743-016 | ELECTRICIAN(ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEMS, AND LOW VOLTAGE WIRING ONLY) | $39.27 | $22.28 |
| SUPA2011-022 | ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) | $25.44 | $12.35 |
| ELEV0084-005 | ELEVATOR MECHANIC FOOTNOTESA. VACATION CREDIT: EMPLOYER CONTRIBUTES 8% BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE AS VACATION PAY CREDIT, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $61.41 | $38.44 |
| IRON0404-011 | IRONWORKER(STRUCTURAL AND REINFORCING) | $37.26 | $32.63 |
| LABO1174-009 | LABORER(VIBRATING PLATE) | $21.57 | $15.04 |
| LABO1174-009 | LABORER(FORKLIFT (MASONRY WORK ONLY)) | $25.29 | $15.04 |
| SUPA2011-022 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.14 | $7.11 |
| BRPA0005-066 | MASON - STONE | $32.66 | $21.58 |
| CARP0443-003 | MILLWRIGHT | $43.00 | $23.44 |
| SUPA2011-022 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $26.96 | $13.93 |
| SUPA2011-022 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $29.88 | $14.13 |
| PAIN0041-004 | PAINTERBRUSH, ROLLER, AND SPRAY | $27.95 | $16.12 |
| PLUM0520-016 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $41.36 | $29.45 |
| PLUM0524-009 | PIPEFITTER(EXCLUDES HVAC PIPE INSTALLATION) | $51.69 | $27.07 |
| PLUM0520-016 | PLUMBER(EXCLUDES HVAC UNIT INSTALLATION) | $41.36 | $29.45 |
| SUPA2011-022 | PLUMBER(HVAC UNIT INSTALLATION ONLY) | $24.31 | $3.95 |
| ENGI0066-022 | POWER EQUIPMENT OPERATORPAVER (ASPHALT, AGGREGATE AND CONCRETE) | $36.87 | $21.32 |
| ENGI0542-029 | POWER EQUIPMENT OPERATOR(FORKLIFT (UNDER 20 FT., EXCLUDES MASONRY WORK)) | $41.88 | $30.03 |
| ENGI0542-029 | POWER EQUIPMENT OPERATOR(BULLDOZER, LOADER, FORKLIFT (20 FT. AND OVER, EXCLUDES MASONRY WORK)) | $44.61 | $30.83 |
| ENGI0542-029 | POWER EQUIPMENT OPERATORCRANE | $47.14 | $31.58 |
| SUPA2011-022 | ROOFER | $41.37 | $13.28 |
| SHEE0019-015 | SHEET METAL WORKERINCLUDES HVAC DUCT INSTALLATION FOOTNOTE: PAID HOLIDAY: ELECTION DAY | $43.09 | $42.52 |
| BRPA0005-069 | TERRAZZO FINISHER | $33.23 | $19.03 |
| BRPA0005-069 | TERRAZZO WORKER/GRINDER | $33.94 | $19.03 |
| BRPA0005-069 | TERRAZZO WORKER/SETTER | $33.83 | $20.78 |
| BRPA0009-011 | TILE FINISHER | $28.76 | $17.16 |
| BRPA0009-011 | TILE SETTER | $35.64 | $21.63 |
| SUPA2011-022 | TRUCK DRIVERDUMP TRUCK | $24.98 | $11.88 |