Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Elk. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUPA2011-008 | ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL(DUCT, PIPE & MECHANICAL SYSTEM INSULATION) | $33.62 | $18.79 |
| BOIL0154-003 | BOILERMAKER | $48.28 | $33.17 |
| BRPA0009-046 | BRICKLAYERINCLUDING POINTING, CAULKING, CLEANING AND BRICK REFRACTORY WORK ADDITIONAL $0.75 TO THE BASE WAGE FOR BRICK REFRACTORY WORK | $31.62 | $22.81 |
| CARP0423-012 | CARPENTER(SCAFFOLD BUILDING ONLY) | $34.76 | $20.64 |
| CARP0900-011 | CARPENTER(INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, METAL STUD INSTALLATION, FLOOR LAYING-CARPET AND VINYL, AND GUTTER INSTALLATION; EXCLUDES SCAFFOLD BUILDING AND FORM WORK) | $33.01 | $18.09 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP2274-005 | CARPENTER(FORM WORK ONLY) | $39.85 | $21.34 |
| PLAS0526-014 | CEMENT MASON/CONCRETE FINISHER | $31.97 | $21.35 |
| ELEC0005-016 | ELECTRICIAN(INCLUDES ALARM INSTALLATION, INSTALLATION OF SOUND AND COMMUNICATION SYSTEM, LOW VOLTAGE WIRING AND HVAC TEMPERATURE CONTROL INSTALLATION) | $50.86 | $31.78 |
| PAIN0751-002 | GLAZIER | $25.40 | $25.47 |
| IRON0003-013 | IRONWORKERORNAMENTAL, REINFORCING, RIGGER, AND STRUCTURAL | $32.29 | $32.41 |
| LABO0910-004 | LABORER(CONCRETE WORKER) | $25.98 | $19.53 |
| SUPA2011-008 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.20 | $9.34 |
| CARP0443-004 | MILLWRIGHT | $43.00 | $23.44 |
| SUPA2011-008 | OPERATORFORKLIFT, ALL TYPES | $23.69 | $13.13 |
| SUPA2011-008 | OPERATORROLLER | $21.89 | $12.07 |
| PAIN0041-001 | PAINTER(SPRAY ONLY) | $27.95 | $16.12 |
| PAIN0057-001 | PAINTERDRYWALL FINISHING/TAPING ONLY | $32.39 | $23.26 |
| PAIN0057-001 | PAINTERBRUSH AND ROLLER ONLY | $30.56 | $23.72 |
| PAIN0057-031 | PAINTER(INDUSTRIAL: SPRAY ONLY) | $36.01 | $23.72 |
| PLUM0354-010 | PIPEFITTER(INDUSTRIAL) | $47.75 | $26.55 |
| PLUM0354-020 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION AND HVAC UNIT INSTALLATION, EXCLUDES WORK ON INDUSTRIAL SITES) | $40.02 | $26.55 |
| SUPA2011-008 | PLASTERER | $20.97 | $10.78 |
| PLUM0354-011 | PLUMBER | $40.02 | $26.55 |
| ENGI0066-032 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE, BOBCAT/SKID STEER/SKID LOADER, LOADER, CRANE*, BULLDOZER *ADD TO CRANE RATE: BOOMS 101-150 JIBS- ADD $.75 BOOMS 151-200 JIBS- ADD $1.50 BOOMS 201-251 JIBS- ADD $2.25 | $36.87 | $21.32 |
| ENGI0066-032 | POWER EQUIPMENT OPERATOROILER | $29.70 | $21.32 |
| ENGI0066-032 | POWER EQUIPMENT OPERATOR PAVER(ASPHALT, AGGREGATE, AND CONCRETE) | $36.87 | $21.32 |
| SUPA2011-008 | ROOFER | $27.00 | $12.19 |
| SHEE0012-008 | SHEET METAL WORKER(EXCLUDES HVAC DUCT INSTALLATION) | $39.50 | $30.79 |
| SUPA2011-008 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $30.58 | $24.04 |
| SUPA2011-008 | SPRINKLER FITTER(FIRE SPRINKLERS) | $30.95 | $18.46 |
| BRPA0009-011 | TILE FINISHER | $28.76 | $17.16 |
| BRPA0009-011 | TILE SETTER | $35.64 | $21.63 |
| SUPA2011-008 | TRUCK DRIVERDUMP TRUCK | $24.98 | $12.17 |