Pulling the wage determination…
Revision 5 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Pennsylvania: Allegheny. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 5). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0002-001 | ASBESTOS WORKERS/INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS) | $46.50 | $29.43 |
| BOIL0154-001 | BOILERMAKER | $48.28 | $33.17 |
| BRPA0009-029 | BRICKLAYER | $36.99 | $24.67 |
| CARP0142-001 | CARPENTER/LATHER | $38.92 | $20.06 |
| PLAS0526-007 | CEMENT MASON/CONCRETE FINISHER | $31.77 | $21.89 |
| PAIN0057-005 | DRYWALL FINISHER/TAPER | $32.39 | $23.26 |
| ELEC0005-007 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN |
| $49.11 |
| $36.79 |
| ELEV0006-001 | ELEVATOR MECHANICFOOTNOTE: A. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. EIGHT PAID HOLIDAYS (PROVIDED EMPLOYEE HAS WORKED 5 CONSECUTIVE DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY | $61.07 | $38.44 |
| CARP1759-001 | FLOOR LAYERCARPET | $35.94 | $19.02 |
| PAIN0751-001 | GLAZIER | $35.65 | $29.73 |
| IRON0003-002 | IRONWORKER | $38.89 | $34.54 |
| LABO0613-002 | LABORERSGROUP 3 ASBESTOS REMOVAL OR ABATEMENT LABORER | $22.65 | $17.60 |
| LABO0613-002 | LABORERSGROUP 1 COMMON LABORER - BUILDING LABORER; BRICK REMOVAL FOR ALTERATIONS; CARRYABLE PUMPS; WEST BRICK BUGGY OR SIMILAR; WALK BEHIND FORKLIFT OR SIMILAR (NON SELF-PROPELLED); STRIPPER AND MOVER OF FORMS; TOOLROOM MAN; ALL MATERIAL CONVEYORS (REGARDLESS OF POWER USED, INCLUDING STARTING AND STOPPING); POURING OF MORTAR OR AGGREGATE INTO BLOCKS OF VOIDS | $22.37 | $17.60 |
| LABO0613-002 | LABORERSGROUP 2 SKILLED LABORER - WEST BRICK BUGGY OR SIMILAR (SELF PROPELLED); POWER WHEELBARROWS AND BUGGIES; WALK BEHIND FORKLIFT OR SIMILAR (SELF-PROPELLED); DRILL RUNNER; ALL OPERATORS OF COMPACTING EQUIPMENT; PIPE LAYER; BURNER; JACKHAMMER MAN - CONCRETE BUSTER; VIBRATOR OPERATOR; CLAY SPADE AND/OR SIMILAR; GUNNITE NOZZLEMAN; BLASTER; CONCRETE SAW OPERATOR; HOD CARRIER; SCAFFOLD BUILDER; AIR TRACK OPERATOR; BELL AND BOTTOM MAN ON FURNACE AND STACKS; GROUT MACHINE FEEDER AND PUMP OPERATOR; GUNNITE | $22.52 | $17.60 |
| LABO0613-002 | LABORERSGROUP 4 TOXIC OR HAZARDOUS WASTE HANDLING LABORER | $23.12 | $17.60 |
| LABO0952-004 | LANDSCAPINGGROUP 1 LANDSCAPE LABORER TO INCLUDE GENERAL LANDSCAPING WORK AND THE DRIVING OF TRUCKS FOR THE DISTRIBUTION OF MATERIALS ON THE JOB SITE BUT NOT TO INCLUDE TRUCKS USED TO TRANSPORT SUPPLIES TO THE JOB | $26.37 | $19.03 |
| LABO0952-004 | LANDSCAPINGGROUP 2 SKILLED LANDSCAPE LABORER TO PLANT ALL TYPES OF TREES AND SHRUBS WITHOUT DIRECT SUPERVISION | $26.79 | $19.03 |
| LABO0952-004 | LANDSCAPINGGROUP 3 LANDSCAPE TRACTOR OPERATOR TO OPERATE SMALL INDUSTRIAL RUBBER TIRE TRACTOR EQUIPPED WITH FRONT END LOADER AND BACKHOE ATTACHMENT OR A SKID LOADER WITH LANDSCAPE ATTACHMENTS USED FOR THE SOLE PURPOSE OF LANDSCAPE WORK INCLUDING SOIL SPREADING, UNLOADING AND LOADING OF MATERIALS AND SUCH OTHER LANDSCAPING WORK BUT NOT FOR HEAVY AND HIGHWAY CONSTRUCTION WORK | $27.09 | $19.03 |
| ELEC0126-006 | LINE CONSTRUCTIONLINEMAN | $54.38 | $30.13 |
| ELEC0126-006 | LINE CONSTRUCTION(TRUCK DRIVER) | $35.35 | $23.61 |
| ELEC0126-006 | LINE CONSTRUCTION(WINCH TRUCK OPERATOR) | $38.07 | $24.54 |
| ELEC0126-006 | LINE CONSTRUCTION(GROUNDMEN) | $32.63 | $22.68 |
| ELEC0126-006 | LINE CONSTRUCTION(CABLE SPLICER) | $54.38 | $30.13 |
| BRPA0009-060 | MASON - STONE | $38.56 | $23.36 |
| PAIN0057-003 | PAINTERBRUSH & ROLLER | $30.56 | $23.72 |
| CARP0274-003 | PILEDRIVERMAN | $43.13 | $23.42 |
| PLUM0449-001 | PIPEFITTER | $50.20 | $30.62 |
| PLUM0027-002 | PLUMBER | $48.65 | $25.47 |
| ENGI0066-001 | POWER EQUIPMENT OPERATORSCLASS III BRAKEMAN, DECK HAND, HELICOPTER SIGNALMAN, OILER*, ELEVATOR (ALTERATIONS & REMODELING COMMERCIAL BUILDINGS), * OILERS ON TRUCK CRANES: LESS THAN 50 TON SHALL RECEIVE $.10 OVER THE CLASS III BASE RATE; 50 TON UP TO 100 TON RATED CAPACITY SHALL BE PAID AN ADDITIONAL $.25 PER HOUR OVER THE CLASS III BASE RATE; 100 TON AND OVER SHALL BE PAID AN ADDITIONAL $1.00 PER HOUR OVER THE CLASS III BASE RATE. GENERAL NOTE: HAZARDOUS MATERIAL SITES LEVEL C & D RECEIVE $1.00 PER HOUR PREMIUM FOR ALL C | $32.83 | $24.05 |
| ENGI0066-001 | POWER EQUIPMENT OPERATORSCLASS II BALLAST REGULATOR, BOAT (MATERIAL OR PERSONNEL)(POWERED), BOILER, BORING MACHINE, COMPRESSOR (COMBINED WITH AIR TUGGER, AIR PUMP, GUNITE MACHINE, OR SAND BLASTER), CONCRETE BELT PLACER, CONCRETE SAW, CONVEYOR, CARRY CRANE, CRUSHING/SCREENING PLANTS, CURB BUILDER (SELF-PROPELLED), FORKLIFTS (RIDDEN OR SELF-PROPELLED), FORM LINE MACHINE, GENERATOR (OVER 5KW), GROUT PUMP, HEATERS, HOIST (MONORAIL, ROOF, ONE DRUM-REGARDLESS OF POWER USED), HUCK MACHINE (OR SIMILAR), HYDRAULIC JACK (SINGLE O | $35.62 | $24.05 |
| ENGI0066-001 | POWER EQUIPMENT OPERATORSCLASS I ASPHALT PAVER, ASPHALT ROLLER, ASPHALT PLANT OPERATOR, ATHEY LOADER, AUGER (TRUCK OR TRACTOR MOUNTED), AUTO GRADER (C.M.I. AND SIMILAR), BACKHOE (180' AND 360' SWING), BACK-FILLING MACHINE, BATCH PLANT, BULLDOZER, CABLE LAYER, CABLEWAY, CAISSON DRILL, CENTRAL MIX PLANT, COMPACTOR WITH BLADE, CONCRETE PUMP (ALL TYPES), OVER-HEAD CRANE, CRANE (CRAWLER OR TRUCK MOUNTED)*, TOWER CRANE (STATIONARY OR CLIMBING TYPE), ROUGH TERRAIN CRANE**, WAGON CRANE, CRUSHING AND/OR SCREENING PLANT, DERRICK | $41.69 | $24.05 |
| ROOF0037-001 | ROOFER | $41.21 | $21.46 |
| SHEE0012-002 | SHEET METAL WORKER | $39.50 | $30.79 |
| SFPA0542-001 | SPRINKLER FITTER | $45.08 | $26.16 |
| BRPA0009-061 | TILE SETTER | $35.64 | $21.63 |
| TEAM0040-007 | TRUCK DRIVERSGROUP 1 SINGLE AXLE (2 AXLES INCLUDING STEERING AXLE); INCLUDES PARTSMAN AND WAREHOUEMAN. TANDEM - TRI-AXLE - SEMI-TRACTOR TRAILER (COMBINATION) (3 AXLES OR MORE INCLUDING STEERING AXLE) FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE MATERIALS/WORK LEVEL C & D RECEIVE $1.00 PER HOUR ABOVE CLASSIFICATION | $37.93 | $23.71 |
| TEAM0040-007 | TRUCK DRIVERSGROUP 2 SPECIALTY VEHICLES; HEAVY EQUIPMENT WHOSE CAPACITY EXCEEDS THAT FOR WHICH STATE LICENSES ARE ISSUED SPECIFICALLY REFERS TO UNITS IN EXCESS OF EIGHT (8) FEET WIDTH (SUCH AS EUCLIDS, ATLEY WAGON, PAYLODER, TOURNAWAGONS, AND SIMILAR EQUIPMENT WHEN NOT SELF LOADED); TAR AND ASPHALT DISTRIBUTORS TRUCKS, HEAVY DUTY TRAILER, SUCH AS LOW BOY, HIGH BOY FOOTNOTES: A. HAZARDOUS/TOXIC WASTE MATERIAL/WORK LEVEL A & B RECEIVE ADDITIONAL $2.50 PER HOUR ABOVE CLASSIFICATION RATE B. HAZARDOUS/TOXIC WASTE | $38.39 | $24.02 |