Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Oregon: Douglas. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BROR0001-005 | BRICKLAYER | $49.60 | $25.15 |
| SUOR2018-005 | CARPENTER | $32.68 | $13.09 |
| PLAS0555-007 | CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 |
| ASBE0036-003 | HEAT & FROST INSULATOR | $62.02 | $22.36 |
| IRON0029-001 | IRONWORKER | $48.31 | $34.52 |
| LABO0737-025 | LABORERMASON TENDER - CEMENT/CONCRETE | $43.79 | $17.05 |
| LABO0737-036 | LABORERHOD CARRIER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $43.79 |
| $17.05 |
| LABO0737-038 | LABORERPIPELAYER | $40.41 | $17.30 |
| SUOR2018-005 | LABORERCOMMON OR GENERAL | $25.48 | $12.09 |
| ENGI0701-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 |
| ENGI0701-007 | OPERATORCRANE (50-89 TON) | $53.60 | $16.90 |
| PLUM0290-002 | PLUMBER | $60.77 | $34.72 |
| SHEE0016-009 | SHEET METAL WORKERHVAC DUCT AND UNIT INSTALLATION ONLY | $45.09 | $30.40 |
| SHEE0016-007 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $54.99 | $33.92 |