Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Oregon: Curry. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BROR0001-005 | BRICKLAYER | $49.60 | $25.15 |
| CARP0503-002 | CARPENTER | $52.62 | $16.81 |
| PLAS0555-007 | CEMENT MASON/CONCRETE FINISHER | $46.13 | $20.31 |
| ELEC0932-001 | ELECTRICIAN | $50.03 | $24.00 |
| ASBE0036-003 | HEAT & FROST INSULATOR | $62.02 | $22.36 |
| SUOR2018-004 | IRONWORKER | $36.71 | $28.16 |
| LABO0737-025 | LABORERMASON TENDER - CEMENT/CONCRETE | $43.79 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $17.05 |
| LABO0737-035 | LABORERCOMMON OR GENERAL | $39.11 | $17.30 |
| LABO0737-036 | LABORERHOD CARRIER | $43.79 | $17.05 |
| LABO0737-038 | LABORERPIPELAYER | $40.41 | $17.30 |
| ENGI0701-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $54.75 | $16.90 |
| ENGI0701-007 | OPERATORCRANE (50-89 TON) | $53.60 | $16.90 |
| PLUM0290-002 | PLUMBER | $60.77 | $34.72 |
| SHEE0016-003 | SHEET METAL WORKER | $54.99 | $33.92 |