Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in Oregon: Lane. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BROR0001-033 | BRICKLAYER | $49.60 | $25.15 |
| CARP0503-011 | CARPENTERS(EXCLUDING FORM WORK) | $53.94 | $16.81 |
| SUOR2009-055 | CEMENT MASON/CONCRETE FINISHER | $22.47 | $9.29 |
| SUOR2009-055 | DRYWALL FINISHER/TAPER | $24.05 | $0.00 |
| ELEC0280-014 | ELECTRICIAN(LANE (EAST OF A LINE RUNNING NORTH AND SOUTH FROM THE NORTHEAST CORNER OF COOS COUNTY TO THE SOUTHEAST CORNER OF LINCOLN COUNTY)) | $56.46 | $23.05 |
| ELEC0932-010 | ELECTRICIAN(LANE COUNTY (AREA LYING WEST OF A LINE NORTH AND SOUTH FROM THE N.E. CORNER OF COOS COUNTY TO THE S.E. CORNER OF LINCOLN COUNTY)) |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $50.03 |
| $24.00 |
| SUOR2009-055 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $24.74 | $5.43 |
| IRON0029-011 | IRONWORKER(ORNAMENTAL, REINFORCING, AND STRUCTURAL) | $48.31 | $34.52 |
| SUOR2009-055 | LABORERMASON TENDER - CEMENT/CONCRETE | $22.39 | $6.90 |
| SUOR2009-055 | LABORERASPHALT SPREADER | $22.18 | $9.39 |
| SUOR2009-055 | LABORERCOMMON OR GENERAL | $19.52 | $6.22 |
| SUOR2009-055 | LABORERFORM-STRIPPING | $19.27 | $6.32 |
| SUOR2009-055 | LABORERLANDSCAPE | $10.60 | $1.80 |
| SUOR2009-055 | LABORERMASON TENDER - BRICK | $18.39 | $6.74 |
| LABO0737-028 | LABORERSGROUP 2 ASPHALT RAKER; PIPELAYER; GRADE CHECKER; VIBRATING PLATE | $40.41 | $17.30 |
| LABO0737-028 | LABORERSGROUP 3 FLAGGER, TRAFFIC CONTROL-CONE SETTER | $34.39 | $17.30 |
| LABO0737-028 | LABORERSGROUP 1 BLASTER, DEMOLITION; LABORER: WATER, SEWER UNDERGROUND; CHAIN SAW | $39.11 | $17.30 |
| SUOR2009-055 | OPERATOREXCAVATOR | $25.06 | $5.94 |
| SUOR2009-055 | OPERATORTRACTOR | $20.00 | $0.73 |
| SUOR2009-055 | PAINTERSPRAY | $19.77 | $0.00 |
| PAIN0010-007 | PAINTERS(INCLUDING BRUSH AND ROLLER) | $39.94 | $16.68 |
| SUOR2009-055 | PILEDRIVERMAN | $26.19 | $11.58 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 1A HYDRAULIC CRANEHYDRAULIC OPERATOR, 200 TONS AND OVER (WITH LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANE: OPERATOR, 200 TONS THROUGH 299 TONS, WITH OVER 200 FEET BOOM; ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BO | $58.82 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 1B LATTICE BOOM CRANEOPERATOR, 300 TONS THROUGH 399 TONS WITH OVER 200 FEET BOOM; OPERATOR 400 TONS AND OVER ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. HOOD NATIONAL FOREST AND WEST OF MILE POST 30 ON INTER | $60.98 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 1 CRANEHELICOPTER OPERATOR, WHEN USED IN ERECTING WORK; WHIRLEY OPERATOR, 90 TON AND OVER; LATTICE BOOM CRANE: OPERATOR 200 TONS THROUGH 299 TONS, AND/OR OVER 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS WITH LUFFING OR TOWER ATTACHMENTS; ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIO | $56.66 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 2 CRANECABLEWAY OPERATOR, 25 TONS AND OVER; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR 90 TONS THROUGH 199 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); TOWER/WHIRLEY OPERATOR: TOWER CRANE OPERATOR; WHIRLEY OPERATOR, UNDER 90 TONS; LATTICE BOOM CRANE: 90 THROUGH 199 TONS AND/OR 150 TO 200 FEET BOOM; HYDRAULIC CRANE: HYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITH LUFFING OR TOWER ATTACHMENT); RUBBER TIRED SCRAPER WITH TANDOM SCRAPERS, MULTI-ENGINETRENCHING MACHINE-WHEEL OPERATOR; LOADER 120,000 LB | $54.75 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 3 HYDRAULIC CRANEHYDRAULIC CRANE OPERATOR, 50 TONS THROUGH 89 TONS (WITHOUT LUFFING OR TOWER ATTACHMENT); LATTICE BOOM CRANES: LATTICE BOOM CRANE-50 THROUGH 89 TONS (AND LESS THAN 150 FEET BOOM); RUBBER TIRED SCRAPER: WITH TANDOM SCRAPERS; SELF LOADING, PADDLE WHEEL, AUGER TYPE, FINISH AND/OR 2 OR MORE UNITS; LOADER 60,000 LBS AND LESS THAN 120,000 LBS; BULLDOZER OVER 70,000 LBS UP TO AND INCLUDING 120,000 LBS; ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN | $53.60 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 4 CRANEHYDRAULIC CRANE OPERATOR, UNDER 50 TONS; LATTICE BOOM CRANE OPERATOR: LATTICE BOOM CRANE OPERATOR, UNDER 50 TONS; TRACKHOE/BACKHOE-ROBOTIC: TRACK AND WHEEL TYPE, UP TO AND INCLUDING 20,0000 LBS. WITH ANY OR ALL ATTACHMENTS; BLADE: BLADE OPERATOR; TRACTOR OPERATOR WITH BOOM ATTACHMENT; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR OVER 20,000 LBS PULLBACK; CRANE: CHICAGO BOOM AND SIMILAR TYPES; BOOM TYPE LIFTING DEVICE, 5 TON CAPACITY OR LESS; ASPHALT PAVER; | $50.27 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 5 TRACKHOE/BACKHOE HYDRAULICTRACK TYPE UP TO AND INCLUDING 20,000 LBS, WHEEL TYPE (FORD, JOHN DEER, CASE TYPE); BOOM TRUCK OPERATOR; DRILLING: CHURM DRILL AND EARTH BORING MACHINE OPERATOR; DIRECTIONAL DRILL OPERATOR LESS THAN 20,000 LBS PULLBACK; CONCRETE PUMPER; CONCRETE PAVER: COMPACTOR; LOADERS, RUBBER TIRED TYPE , LESS THAN 25,00 LBS; FORKLIFT OVER 5 TON, BULLDOZER 20,000 LBS OR 100 HORSES OR LESS; MIXER OPERATOR; ROLLER; COMPACTOR WITHOUT BLADE ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FO | $49.03 | $16.90 |
| ENGI0701-030 | POWER EQUIPMENT OPERATOR GROUP 6 LOADERS(LESS THAN 1 CU YD.); OILER; BOBCAT/SKID LOADER; GRADE CHECKER; CRANE OILER; ASPHALT SPREADER; BROOM OPERATOR; FORKLIFT; ROLLER (NON-ASPHALT) ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES): ZONE 2 - $3.00 ZONE 3 - $6.00 FOR THE FOLLOWING METROPOLITAN COUNTIES: MULTNOMAH; CLACKAMAS; MARION; WASHINGTON; YAMHILL; AND COLUMBIA; CLARK; AND COWLITZ COUNTY, WASHINGTON WITH MODIFICATIONS AS INDICATED: ALL JOBS OR PROJECTS LOCATED IN MULTNOMAH, CLACKAMAS AND MARION COUNTIES, WEST OF THE WESTERN BOUNDARY OF MT. | $45.81 | $16.90 |
| SUOR2009-055 | TRUCK DRIVER | $32.10 | $5.90 |
| SUOR2009-055 | TRUCK DRIVERDUMP TRUCK | $16.11 | $8.81 |
| SUOR2009-055 | TRUCK DRIVERLOWBOY TRUCK | $17.07 | $5.50 |
| SUOR2009-055 | TRUCK DRIVERWATER TRUCK | $18.65 | $6.70 |
| TEAM0037-009 | TRUCK DRIVERSGROUP 1 FLATBED TRUCK; OFF THE ROAD TRUCK | $35.41 | $18.30 |