Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 5 counties in Oklahoma: Craig, Delaware, McIntosh, Nowata, Okfuskee. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0592-001 | BOILERMAKER | $33.70 | $24.41 |
| SUOK2012-052 | BRICKLAYER | $20.00 | $0.00 |
| SUOK2012-052 | CARPENTER | $13.42 | $0.00 |
| SUOK2012-052 | CAULKER | $20.00 | $1.61 |
| SUOK2012-052 | CEMENT MASON/CONCRETE FINISHER | $16.91 | $0.61 |
| ELEC0584-006 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS AND SOUND AND COMMUNICATION SYSTEMS) | $38.38 | $12.89 |
| SUOK2012-052 | ELECTRICIAN |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $22.10 |
| $5.76 |
| SUOK2012-052 | ELECTRICIANALARM INSTALLATION | $20.47 | $4.52 |
| SUOK2012-052 | ELECTRICIAN(LOW VOLTAGE WIRING) | $21.14 | $4.96 |
| ELEV0083-003 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $51.24 | $38.44 |
| IRON0584-010 | IRONWORKER, STRUCTURAL | $30.35 | $16.83 |
| SUOK2012-052 | LABORERMASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 |
| SUOK2012-052 | LABORERMASON TENDER - BRICK | $10.25 | $0.00 |
| SUOK2012-052 | LABORERCOMMON OR GENERAL | $11.51 | $0.00 |
| SUOK2012-052 | LABORERPIPELAYER | $12.93 | $0.00 |
| SUOK2012-052 | PAINTERBRUSH, ROLLER AND SPRAY | $13.56 | $0.00 |
| PLUM0430-022 | PIPEFITTER(INCLUDING HVAC PIPE AND UNIT INSTALLATION) | $36.65 | $16.03 |
| SUOK2012-052 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $24.66 | $10.36 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 10 OILER | $27.25 | $19.05 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE;BACKHHOE; TRACKHOE; EXCAVATOR AND BULLDOZER | $34.07 | $19.05 |
| ENGI0627-022 | POWER EQUIPMENT OPERATORGROUP 8 FORKKLIFT | $28.77 | $19.05 |
| SUOK2012-052 | ROOFER | $15.00 | $0.29 |
| SHEE0270-009 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $35.49 | $14.60 |
| SUOK2012-052 | SPRINKLER FITTER(FIRE SPRINKLERS) | $39.95 | $0.38 |