Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Oklahoma: Payne. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0592-001 | BOILERMAKER | $33.70 | $24.41 |
| BROK0005-004 | BRICKLAYER | $26.92 | $13.09 |
| CARP0329-005 | CARPENTER(EXCLUDES DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION) | $27.79 | $10.05 |
| SUOK2012-043 | CARPENTER(FORM WORK ONLY) | $15.34 | $5.50 |
| SUOK2012-043 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $14.16 | $0.00 |
| SUOK2012-043 | CEMENT MASON/CONCRETE FINISHER | $16.10 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC1141-007 |
| ELECTRICIAN |
| $41.40 |
| $13.14 |
| ELEC1141-029 | ELECTRICIAN(LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $24.26 | $9.76 |
| IRON0048-011 | IRONWORKER, STRUCTURAL | $32.10 | $17.38 |
| SUOK2012-043 | LABORERPLASTER TENDER | $10.17 | $0.00 |
| SUOK2012-043 | LABORERCOMMON OR GENERAL | $9.00 | $0.00 |
| SUOK2012-043 | LABORERPIPELAYER | $13.03 | $0.00 |
| SUOK2012-043 | LABORERMASON TENDER - CEMENT/CONCRETE | $13.04 | $0.00 |
| SUOK2012-043 | LABORERMASON TENDER - BRICK | $11.88 | $0.00 |
| SUOK2012-043 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $19.34 | $0.74 |
| SUOK2012-043 | OPERATORROLLER | $13.80 | $0.94 |
| SUOK2012-043 | PAINTERBRUSH, ROLLER AND SPRAY | $13.38 | $0.00 |
| SUOK2012-043 | PAINTERDRYWALL FINISHING/TAPING | $11.90 | $0.00 |
| PLUM0344-007 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $41.00 | $16.03 |
| SUOK2012-043 | PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $19.00 | $0.00 |
| PLAS0518-028 | PLASTERER | $33.62 | $14.18 |
| PLUM0344-006 | PLUMBER(EXCLUDES HVAC PIPE INSTALLATION) | $41.00 | $16.03 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 4 CRANES WITH BOOM INCL. JIB LESS THAN 100 FT AND LESS THAN 3 CU. YD.; OVERHEAD MONORAIL CRANE AND BULLDOZER | $34.07 | $19.05 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 2 ALL CRANE TYPE EQUIPMENT 100 TON CAPACITY AND LARGER CRANES, AND LESS THAN 200 TON CAPACITY | $36.14 | $19.05 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 1 ALL CRANE TYPE EQUIPMENT 200 TON AND LARGER AND INCLUDING 400 TON CAPACITY CRANES. ALL TOWER CRANES | $38.09 | $19.05 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 10 OILER | $27.25 | $19.05 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 3 ALL CRANE TYPE EQUIPMENT 50 TON CAPACITY AND LARGER CRANES, AND LESS THAN 100 TON CAPACITY. CRANE EQUIPMENT (AS RATED BY MFG.) 3 CU. YD. AND OVER GUY DERRICK WHIRLEY POWER DRIVEN HOLE DIGGER (WITH 30' AND LONGER MAST) | $35.40 | $19.05 |
| ENGI0627-012 | POWER EQUIPMENT OPERATORGROUP 8 FORKLIFT | $28.77 | $19.05 |
| SUOK2012-043 | ROOFER | $15.00 | $0.29 |
| SHEE0124-009 | SHEET METAL WORKER(HVAC DUCT AND UNIT INSTALLATION ONLY) | $33.38 | $16.36 |
| SUOK2012-043 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $16.32 | $0.00 |