Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Ohio: Carroll, Stark. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0002-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $46.50 | $29.43 |
| BROH0006-003 | BRICKLAYER | $35.59 | $22.71 |
| CARP0285-007 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $33.09 | $23.06 |
| SUOH2012-108 | CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $24.30 | $10.71 |
| SUOH2012-108 | CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 |
| ELEC0540-001 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $25.15 | $17.44 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0540-008 |
| ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) |
| $39.86 |
| $29.19 |
| PAIN1162-003 | GLAZIER | $32.87 | $15.17 |
| IRON0550-010 | IRONWORKERORNAMENTAL, REINFORCING AND STRUCTURAL | $36.00 | $23.57 |
| LABO1015-006 | LABORERMASON TENDER - BRICK | $34.62 | $12.95 |
| LABO1015-006 | LABORERCOMMON OR GENERAL | $32.62 | $12.95 |
| SUOH2012-108 | LABORERPIPELAYER | $23.98 | $8.58 |
| SUOH2012-108 | OPERATORLOADER | $29.66 | $12.61 |
| SUOH2012-108 | OPERATORBULLDOZER | $22.55 | $8.03 |
| SUOH2012-108 | OPERATORROLLER | $28.83 | $12.72 |
| SUOH2012-108 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $30.26 | $12.58 |
| SUOH2012-108 | OPERATORCRANE | $29.51 | $11.77 |
| SUOH2012-108 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 |
| PAIN0841-003 | PAINTERBRUSH AND ROLLER | $31.93 | $18.15 |
| SUOH2012-108 | PAINTERSPRAY | $22.78 | $12.40 |
| PLUM0168-005 | PIPEFITTER(EXCLUDES HVAC UNIT INSTALLATION) | $40.92 | $37.20 |
| PLUM0094-007 | PLUMBER(INCLUDES HVAC UNIT INSTALLATION) | $47.48 | $27.14 |
| ENGI0018-035 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $44.14 | $16.41 |
| ENGI0066-045 | POWER EQUIPMENT OPERATOR(MECHANIC) | $32.92 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORGRADER/BLADE | $32.42 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORFORKLIFT | $28.87 | $19.66 |
| ROOF0088-003 | ROOFER | $32.10 | $21.45 |
| SHEE0033-027 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 |
| SUOH2012-108 | SHEET METAL WORKER, EXCLUDES HVAC DUCT INSTALLATION | $34.16 | $0.00 |
| BROH0008-007 | TILE FINISHER | $25.37 | $17.42 |
| BROH0006-008 | TILE SETTER | $33.46 | $21.37 |
| SUOH2012-108 | TRUCK DRIVERDUMP (ALL TYPES) | $22.78 | $12.61 |