Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Ohio: Trumbull. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0008-010 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 |
| BROH0008-006 | BRICKLAYER | $33.48 | $23.51 |
| BROH0008-008 | BRICK POINTER/CAULKER/CLEANER | $33.48 | $23.51 |
| CARP0171-003 | CARPENTER(INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION, AND EXCLUDES FORM WORK) | $31.77 | $23.54 |
| PLAS0526-016 | CEMENT MASON/CONCRETE FINISHER | $29.65 | $18.61 |
| ELEC0064-004 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $41.49 | $21.81 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUOH2012-103 |
| ELECTRICIAN(LOW VOLTAGE WIRING ONLY) |
| $20.58 |
| $0.00 |
| ELEV0045-004 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.52 | $38.44 |
| PAIN0847-002 | GLAZIER | $27.51 | $19.70 |
| IRON0207-014 | IRONWORKERORNAMENTAL, REINFORCING AND STRUCTURAL | $36.26 | $28.16 |
| LABO0125-004 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $31.64 | $12.95 |
| LABO0935-001 | LABORER(FORM WORK) | $29.34 | $11.80 |
| LABO0935-002 | LABORERCOMMON OR GENERAL | $31.64 | $13.17 |
| LABO0935-002 | LABORERMASON TENDER - BRICK | $31.64 | $13.17 |
| SUOH2012-103 | LABORERPIPELAYER | $23.98 | $8.58 |
| SUOH2012-103 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 |
| SUOH2012-103 | PAINTER(BRUSH AND ROLLER) | $20.52 | $10.06 |
| PLUM0396-004 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $40.55 | $29.25 |
| PLUM0396-004 | PLUMBER(EXCLUDES HVAC PIPE INSTALLATION) | $40.55 | $29.25 |
| ENGI0066-049 | POWER EQUIPMENT OPERATOR(MECHANIC) | $36.92 | $24.01 |
| ENGI0066-049 | POWER EQUIPMENT OPERATORFORKLIFT | $32.06 | $24.01 |
| ENGI0066-049 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; BULLDOZER; CRANE; GRADER/BLADE; LOADER) | $36.92 | $24.01 |
| ENGI0066-049 | POWER EQUIPMENT OPERATOR(OILER) | $28.77 | $24.01 |
| ROOF0044-003 | ROOFER | $40.15 | $21.28 |
| SHEE0033-022 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $38.36 | $29.59 |
| SHEE0033-023 | SHEET METAL WORKER(EXCLUDING HVAC DUCT INSTALLATION) | $38.36 | $29.59 |
| SUOH2012-103 | TILE FINISHER | $24.24 | $9.75 |
| BROH0036-001 | TILE SETTER | $36.07 | $19.49 |
| SUOH2012-103 | TRUCK DRIVERDUMP (ALL TYPES) | $24.32 | $11.73 |