Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Ohio: Summit. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0003-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.88 | $26.93 |
| BROH0007-003 | BRICKLAYER | $36.89 | $22.13 |
| BROH0007-001 | BRICK POINTER/CAULKER/CLEANER | $36.89 | $22.13 |
| CARP0285-005 | CARPENTER(INCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORM WORK) | $36.29 | $23.79 |
| PLAS0109-002 | CEMENT MASON/CONCRETE FINISHER | $33.48 | $24.81 |
| ELEC0038-004 | ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $46.63 |
| $24.92 |
| ELEC0306-009 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS) | $42.55 | $23.18 |
| ELEC0306-010 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $29.23 | $16.36 |
| ELEV0045-004 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $60.52 | $38.44 |
| PAIN1162-003 | GLAZIER | $32.87 | $15.17 |
| IRON0017-011 | IRONWORKER(ORNAMENTAL, REINFORCING, & STRUCTURAL) | $36.83 | $29.01 |
| LABO0310-005 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $31.89 | $22.66 |
| LABO0894-006 | LABORERMASON TENDER - BRICK | $35.07 | $12.65 |
| LABO0894-006 | LABORERCOMMON OR GENERAL | $34.92 | $12.65 |
| LABO0894-006 | LABORERPIPELAYER | $35.12 | $12.65 |
| SUOH2012-102 | OPERATORBULLDOZER | $29.23 | $12.76 |
| SUOH2012-102 | OPERATORROLLER | $31.48 | $12.80 |
| SUOH2012-102 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $31.48 | $12.80 |
| SUOH2012-102 | OPERATORLOADER | $29.66 | $12.61 |
| SUOH2012-102 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $32.30 | $10.80 |
| SUOH2012-102 | PAINTER(BRUSH AND ROLLER) | $20.55 | $1.88 |
| SUOH2012-102 | PAINTERSPRAY | $22.78 | $12.40 |
| PLUM0120-010 | PIPEFITTER(EXCLUDES HVAC PIPE INSTALLATION) | $49.17 | $28.55 |
| SUOH2012-102 | PIPEFITTER(HVAC PIPE INSTALLATION ONLY) | $35.12 | $0.00 |
| PLAS0031-019 | PLASTERER | $29.51 | $15.67 |
| SUOH2012-102 | PLUMBER | $27.79 | $14.49 |
| ENGI0018-042 | POWER EQUIPMENT OPERATOR(OILER) | $36.93 | $16.41 |
| ENGI0018-042 | POWER EQUIPMENT OPERATORCRANE | $46.71 | $16.41 |
| ENGI0018-045 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $45.63 | $16.41 |
| ENGI0066-045 | POWER EQUIPMENT OPERATOR(MECHANIC) | $32.92 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORFORKLIFT | $28.87 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORGRADER/BLADE | $32.42 | $19.66 |
| ROOF0044-003 | ROOFER | $40.15 | $21.28 |
| SHEE0033-027 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $37.66 | $32.23 |
| SHEE0033-041 | SHEET METAL WORKER(EXCLUDING HVAC DUCT INSTALLATION) | $38.36 | $29.59 |
| BROH0008-007 | TILE FINISHER | $25.37 | $17.42 |
| BROH0036-002 | TILE SETTER | $33.23 | $15.47 |
| SUOH2012-102 | TRUCK DRIVERDUMP (ALL TYPES) | $24.32 | $11.73 |