Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Ohio: Medina. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0003-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.88 | $26.93 |
| BROH0005-006 | BRICKLAYER | $38.13 | $20.19 |
| BROH0005-007 | BRICK POINTER/CAULKER/CLEANER | $38.13 | $20.19 |
| CARP0285-003 | CARPENTER(DRYWALL HANGING AND METAL STUD INSTALLATION ONLY) | $36.29 | $23.79 |
| CARP0435-002 | CARPENTER(EXCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, SOFT FLOOR LAYING, AND FORM WORK) | $37.52 | $23.50 |
| SUOH2012-093 | CEMENT MASON/CONCRETE FINISHER | $21.15 | $8.45 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0038-004 |
| ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE |
| $46.63 |
| $24.92 |
| ELEC0038-005 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $33.05 | $14.91 |
| ELEC0038-007 | ELECTRICIAN(ALARM INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 |
| SUOH2012-093 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS/HVAC TEMPERATURE CONTROLS | $33.69 | $13.44 |
| ELEV0017-002 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $63.79 | $38.44 |
| PAIN0181-001 | GLAZIER | $34.82 | $20.80 |
| IRON0017-012 | IRONWORKERORNAMENTAL AND REINFORCING | $36.83 | $29.01 |
| IRON0550-014 | IRONWORKER, STRUCTURAL | $36.00 | $23.57 |
| LABO0310-005 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $31.89 | $22.66 |
| LABO0894-003 | LABORERPIPELAYER | $31.27 | $10.90 |
| LABO0894-005 | LABORERCOMMON OR GENERAL; MASON TENDER - BRICK | $34.92 | $12.65 |
| SUOH2012-093 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $24.53 | $14.55 |
| SUOH2012-093 | OPERATORBULLDOZER | $21.15 | $8.72 |
| SUOH2012-093 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.15 | $8.80 |
| SUOH2012-093 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $32.88 | $12.26 |
| SUOH2012-093 | OPERATORLOADER | $29.66 | $12.61 |
| SUOH2012-093 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $31.48 | $12.80 |
| SUOH2012-093 | OPERATORROLLER | $31.48 | $12.80 |
| PAIN0707-002 | PAINTERBRUSH AND ROLLER | $32.35 | $19.45 |
| PAIN0707-003 | PAINTER(DRYWALL FINISHING/TAPING ONLY) | $35.45 | $20.20 |
| SUOH2012-093 | PAINTERSPRAY | $22.78 | $12.40 |
| CARP1090-001 | PILEDRIVERMAN | $36.34 | $27.50 |
| PLUM0120-009 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION) | $49.17 | $28.55 |
| PLAS0031-018 | PLASTERER(INCLUDING FLOOR LAYER: FLOOR COATING/EPOXY) | $29.51 | $15.67 |
| PLUM0055-002 | PLUMBER(EXCLUDES HVAC PIPE INSTALLATION) | $44.86 | $30.03 |
| ENGI0018-042 | POWER EQUIPMENT OPERATORCRANE | $46.71 | $16.41 |
| ENGI0018-042 | POWER EQUIPMENT OPERATOR(OILER) | $36.93 | $16.41 |
| ENGI0066-045 | POWER EQUIPMENT OPERATOR(MECHANIC) | $32.92 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORFORKLIFT | $28.87 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORGRADER/BLADE | $32.42 | $19.66 |
| ROOF0044-003 | ROOFER | $40.15 | $21.28 |
| SHEE0033-040 | SHEET METAL WORKER(HVAC DUCT AND UNIT INSTALLATION ONLY) | $37.66 | $32.23 |
| SHEE0033-042 | SHEET METAL WORKER(EXCLUDING HVAC DUCT AND UNIT INSTALLATION) | $38.36 | $29.59 |
| CARP0373-001 | SOFT FLOOR LAYER | $37.52 | $23.50 |
| PLUM0120-009 | SPRINKLER FITTER(FIRE SPRINKLERS) | $49.17 | $28.55 |
| BROH0005-009 | TILE FINISHER | $31.50 | $16.23 |
| BROH0036-001 | TILE SETTER | $36.07 | $19.49 |
| SUOH2012-093 | TRUCK DRIVERDUMP (ALL TYPES) | $24.32 | $11.73 |