Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Ohio: Franklin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUOH2012-080 | ABATEMENT WORKERASBESTOS (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | $22.74 | $9.25 |
| ASBE0008-010 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 |
| BROH0055-006 | BRICKLAYER | $33.24 | $19.62 |
| CARP0200-003 | CARPENTER(SOFT FLOOR LAYER AND FLOOR LAYING - HARDWOOD FLOORS ONLY) | $35.94 | $23.59 |
| CARP0200-004 | CARPENTER(EXCLUDES ACOUSTICAL CEILING INSTALLATION) | $35.94 | $23.59 |
| SUOH2012-080 | CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) | $24.17 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $8.61 |
| SUOH2012-080 | CEMENT MASON/CONCRETE FINISHER | $26.07 | $12.34 |
| SUOH2012-080 | DRYWALL FINISHER/TAPER | $20.81 | $5.27 |
| SUOH2012-080 | DRYWALL HANGER AND METAL STUD INSTALLER | $21.75 | $3.11 |
| ELEC0038-004 | ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 |
| ELEC0683-004 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $43.00 | $26.37 |
| ELEC0683-007 | ELECTRICIAN(EXCLUDES INSTALLATION OF HVAC/TEMPERATURE CONTROLS AND LOW VOLTAGE WIRING) | $43.00 | $26.37 |
| ELEV0037-003 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.33 | $38.44 |
| SUOH2012-080 | GLAZIER | $22.60 | $11.02 |
| IRON0172-006 | IRONWORKER(REINFORCING AND STRUCTURAL) | $40.87 | $23.15 |
| IRON0550-009 | IRONWORKERORNAMENTAL | $36.00 | $23.57 |
| LABO0423-003 | LABORER(MASON TENDER - BRICK & CEMENT/CONCRETE) | $32.10 | $14.20 |
| SUOH2012-080 | LABORERCOMMON OR GENERAL | $21.90 | $8.60 |
| SUOH2012-080 | LABORERLANDSCAPE & IRRIGATION | $22.18 | $8.15 |
| SUOH2012-080 | LABORERPIPELAYER | $23.98 | $8.58 |
| SUOH2012-080 | OPERATORROLLER | $28.83 | $12.72 |
| SUOH2012-080 | OPERATORFORKLIFT | $22.79 | $12.76 |
| SUOH2012-080 | OPERATORLOADER | $29.66 | $12.61 |
| SUOH2012-080 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 |
| PAIN1275-001 | PAINTER(SPRAY) | $29.70 | $14.91 |
| SUOH2012-080 | PAINTER(BRUSH AND ROLLER) | $23.87 | $9.42 |
| PLUM0189-005 | PIPEFITTER | $53.00 | $27.59 |
| SUOH2012-080 | PLUMBER | $25.74 | $6.45 |
| ENGI0018-043 | POWER EQUIPMENT OPERATORBULLDOZER | $44.02 | $16.41 |
| ENGI0018-043 | POWER EQUIPMENT OPERATOR(OILER) | $36.34 | $16.41 |
| ENGI0018-043 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/TRACKHOE; BOBCAT/SKID STEER/SKID LOADER; CONCRETE PUMP; CRANE) | $44.14 | $16.41 |
| ENGI0066-048 | POWER EQUIPMENT OPERATOR(MECHANIC) | $32.92 | $19.66 |
| ENGI0066-048 | POWER EQUIPMENT OPERATORGRADER/BLADE | $32.42 | $19.66 |
| SUOH2012-080 | ROOFER | $25.33 | $11.37 |
| SHEE0024-028 | SHEET METAL WORKER(EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $33.53 | $26.36 |
| SUOH2012-080 | SHEET METAL WORKER(HVAC DUCT AND HVAC UNIT INSTALLATION ONLY) | $26.26 | $17.79 |
| SFOH0669-009 | SPRINKLER FITTER(FIRE SPRINKLERS) | $48.28 | $28.08 |
| BROH0055-007 | TILE FINISHER | $28.31 | $10.45 |
| BROH0055-007 | TILE SETTER | $29.92 | $16.77 |
| SUOH2012-080 | TRUCK DRIVERDUMP (ALL TYPES) | $24.32 | $11.73 |