Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Ohio: Brown. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0008-010 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $35.23 | $23.04 |
| BROH0018-008 | BRICKLAYER | $35.00 | $17.13 |
| CARP0002-008 | CARPENTER(ACCOUSTICAL CEILING INSTALLATION ONLY) | $32.26 | $19.10 |
| CARP0002-016 | CARPENTER(FORM WORK ONLY) | $32.26 | $19.10 |
| CARP0002-019 | CARPENTER(INCLUDES DRYWALL HANGING AND METAL STUD INSTALLATION; EXCLUDES ACOUSTICAL CEILING INSTALLATION AND FORM WORK) | $32.26 | $19.10 |
| PLAS0132-018 | CEMENT MASON/CONCRETE FINISHER | $33.50 | $16.05 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0212-001 | ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING) | $38.05 | $22.97 |
| ELEC0212-011 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $38.05 | $22.97 |
| ELEV0011-002 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 |
| PAIN0387-002 | GLAZIER | $31.95 | $18.20 |
| IRON0044-019 | IRONWORKERORNAMENTAL AND STRUCTURAL | $37.77 | $23.90 |
| IRON0044-003 | IRONWORKER, REINFORCING | $38.27 | $23.90 |
| LABO0265-017 | LABORERCOMMON OR GENERAL | $27.30 | $18.75 |
| LABO0265-019 | LABORERMASON TENDER - BRICK | $26.60 | $18.75 |
| SUOH2012-072 | LABORERPIPELAYER | $23.18 | $8.95 |
| SUOH2012-072 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $26.19 | $8.99 |
| SUOH2012-072 | LABORERLANDSCAPE & IRRIGATION | $23.60 | $0.87 |
| SUOH2012-072 | LABORERMASON TENDER - CEMENT/CONCRETE | $23.87 | $9.80 |
| SUOH2012-072 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $30.28 | $13.29 |
| SUOH2012-072 | OPERATORROLLER | $29.85 | $12.00 |
| SUOH2012-072 | OPERATORLOADER | $29.66 | $12.61 |
| PAIN0123-001 | PAINTERBRUSH AND ROLLER | $28.29 | $13.75 |
| SUOH2012-072 | PAINTERSPRAY | $22.78 | $12.40 |
| PLUM0392-004 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION, EXCLUDES HVAC UNIT INSTALLATION) | $43.30 | $27.40 |
| PLAS0132-019 | PLASTERER | $31.35 | $17.65 |
| PLUM0392-004 | PLUMBER(INCLUDES HVAC UNIT INSTALLATION, EXCLUDES HVAC PIPE INSTALLATION) | $43.30 | $27.40 |
| ENGI0018-036 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/TRACKHOE; BULLDOZER; CRANE) | $44.14 | $16.41 |
| ENGI0018-037 | POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $44.14 | $16.41 |
| ENGI0066-045 | POWER EQUIPMENT OPERATOR(MECHANIC) | $32.92 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORGRADER/BLADE | $32.42 | $19.66 |
| ENGI0066-045 | POWER EQUIPMENT OPERATORFORKLIFT | $28.87 | $19.66 |
| ROOF0042-007 | ROOFER | $34.38 | $19.94 |
| SHEE0024-029 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION ONLY) | $34.32 | $23.77 |
| SFOH0669-009 | SPRINKLER FITTER(FIRE SPRINKLERS) | $48.28 | $28.08 |
| BROH0018-008 | TILE FINISHER | $27.87 | $16.31 |
| BROH0018-008 | TILE SETTER | $32.41 | $16.36 |
| SUOH2012-072 | TRUCK DRIVERDUMP (ALL TYPES) | $24.32 | $11.73 |