Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Ohio: Holmes, Marion. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BROH0040-001 | BRICK POINTER/CAULKER/CLEANER | $35.67 | $24.75 |
| SUOH2012-069 | CARPENTER(EXCLUDING DRYWALL HANGING AND METAL STUD INSTALLATION, AND SOFT FLOOR LAYING) | $23.19 | $10.50 |
| ELEC0038-004 | ELECTRICIAN(HVAC/TEMPERATURE CONTROLS INSTALLATION ONLY) FOOTNOTES; A. 6 PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; JULY 4TH; LABOR DAY; THANKSGIVING DAY; & CHRISTMAS DAY B. 1 WEEK'S PAID VACATION FOR 1 YEAR'S SERVICE; 2 WEEKS' PAID VACATION FOR 2 OR MORE YEARS' SERVICE | $46.63 | $24.92 |
| SUOH2012-069 | ELECTRICIAN(LOW VOLTAGE WIRING ONLY) | $20.91 | $8.20 |
| SUOH2012-069 | ELECTRICIAN, EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS | $29.72 | $15.79 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEV0037-003 |
| ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE |
| $57.33 |
| $38.44 |
| IRON0550-011 | IRONWORKERORNAMENTAL AND STRUCTURAL | $36.00 | $23.57 |
| LABO0500-004 | LABORER(MASON TENDER - CEMENT/CONCRETE) | $32.35 | $16.42 |
| SUOH2012-069 | LABORERPIPELAYER | $18.37 | $4.79 |
| SUOH2012-069 | LABORERCOMMON OR GENERAL | $21.76 | $8.29 |
| SUOH2012-069 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $30.20 | $12.96 |
| SUOH2012-069 | OPERATORROLLER | $22.16 | $8.07 |
| SUOH2012-069 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.85 | $10.42 |
| SUOH2012-069 | OPERATORLOADER | $19.87 | $5.91 |
| SUOH2012-069 | OPERATORBULLDOZER | $24.19 | $8.24 |
| SUOH2012-069 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $20.56 | $7.13 |
| SUOH2012-069 | PAINTER(BRUSH AND ROLLER) | $20.91 | $10.49 |
| PAIN0841-004 | PAINTER, DRYWALL TAPER(DRYWALL FINISHING/TAPING ONLY) | $33.43 | $18.15 |
| PLUM0050-009 | PIPEFITTER(EXCLUDES HVAC PIPE INSTALLATION) | $51.00 | $32.56 |
| PLAS0132-014 | PLASTERER | $31.68 | $15.46 |
| SUOH2012-069 | PLUMBER | $32.69 | $18.70 |
| ENGI0018-023 | POWER EQUIPMENT OPERATORFORKLIFT | $42.98 | $16.41 |
| ENGI0018-023 | POWER EQUIPMENT OPERATORCRANE | $44.14 | $16.41 |
| ROOF0044-003 | ROOFER | $40.15 | $21.28 |
| SHEE0033-042 | SHEET METAL WORKER(EXCLUDING HVAC DUCT AND UNIT INSTALLATION) | $38.36 | $29.59 |
| CARP0373-001 | SOFT FLOOR LAYER | $37.52 | $23.50 |
| SUOH2012-069 | SPRINKLER FITTER(FIRE SPRINKLERS) | $28.89 | $10.53 |
| BROH0040-001 | TILE FINISHER | $30.25 | $23.93 |
| BROH0040-001 | TILE SETTER | $35.67 | $24.75 |
| SUOH2012-069 | TRUCK DRIVERDUMP (ALL TYPES) | $18.88 | $4.14 |