Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 4 counties in Ohio: Clinton, Highland, Hocking, Jackson. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0080-001 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.05 | $30.87 |
| BROH0039-004 | BRICKLAYER(CLINTON, HIGHLAND, AND HOCKING COUNTIES) | $30.18 | $20.23 |
| BROH0039-005 | BRICKLAYER(JACKSON COUNTY) | $34.00 | $17.36 |
| SUOH2012-066 | CARPENTER | $25.80 | $12.54 |
| SUOH2012-066 | DRYWALL FINISHER/TAPER | $20.66 | $4.91 |
| SUOH2012-066 | DRYWALL HANGER AND METAL STUD INSTALLER | $22.27 | $14.40 |
| ELEC0575-004 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(EXCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS) |
| $37.00 |
| $22.26 |
| ELEC0972-008 | ELECTRICIAN(LOW VOLTAGE WIRING AND ALARM INSTALLATION ONLY) | $40.00 | $33.32 |
| ELEV0011-002 | ELEVATOR MECHANIC PAID HOLIDAYSA. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERN'S DAY, THANKSGIVING DAY, THE FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY. B. EMPLOYER CONTRIBUTES 8% OF REGULAR HOURLY RATE TO VACATION PAY CREDIT FOR EMPLOYEE WHO HAS WORKED IN BUSINESS MORE THAN 5 YEARS; 6% FOR LESS THAN 5 YEARS' SERVICE | $57.41 | $38.44 |
| PAIN1195-001 | GLAZIER | $32.89 | $14.33 |
| IRON0550-012 | IRONWORKERORNAMENTAL | $36.00 | $23.57 |
| IRON0769-001 | IRONWORKER, STRUCTURAL | $39.70 | $29.59 |
| LABO0083-003 | LABORER(COMMON OR GENERAL; MASON TENDER - BRICK & CEMENT/CONCRETE) | $40.97 | $14.10 |
| SUOH2012-066 | LABORERPIPELAYER | $18.37 | $4.79 |
| SUOH2012-066 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $29.18 | $10.69 |
| SUOH2012-066 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.91 | $10.42 |
| SUOH2012-066 | OPERATORLOADER | $22.69 | $8.01 |
| PAIN0093-003 | PAINTERBRUSH AND ROLLER | $30.28 | $24.46 |
| PLUM0162-003 | PIPEFITTEREXCLUDES HVAC PIPE INSTALLATION | $43.05 | $27.18 |
| PLUM0189-003 | PIPEFITTEREXCLUDES HVAC PIPE INSTALLATION (HOCKING COUNTY) | $53.00 | $27.59 |
| PLUM0577-004 | PIPEFITTEREXCLUDES HVAC PIPE INSTALLATION (HIGHLAND AND JACKSON COUNTIES) | $38.89 | $28.56 |
| PLUM0577-003 | PLUMBER(INCLUDES HVAC PIPE INSTALLATION) | $38.89 | $28.56 |
| ENGI0018-022 | POWER EQUIPMENT OPERATOR(BOBCAT/SKID STEER/SKID LOADER; BULLDOZER) | $44.02 | $16.41 |
| ENGI0018-022 | POWER EQUIPMENT OPERATORFORKLIFT | $42.98 | $16.41 |
| ENGI0018-022 | POWER EQUIPMENT OPERATORCRANE | $44.14 | $16.41 |
| SHEE0024-010 | SHEET METAL WORKER(HVAC DUCT AND UNIT INSTALLATION ONLY) | $33.53 | $26.36 |
| SHEE0033-008 | SHEET METAL WORKER(EXCLUDES HVAC DUCT AND UNIT INSTALLATION) | $31.73 | $27.44 |
| SFOH0669-009 | SPRINKLER FITTER(FIRE SPRINKLERS) | $48.28 | $28.08 |
| BROH0055-007 | TILE FINISHER | $28.31 | $10.45 |
| BROH0055-007 | TILE SETTER | $29.92 | $16.77 |
| SUOH2012-066 | TRUCK DRIVERDUMP (ALL TYPES) | $19.33 | $6.55 |