Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 2 counties in Ohio: Fulton, Ottawa. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUOH2012-018 | BRICKLAYER | $28.40 | $11.78 |
| SUOH2012-018 | CARPENTER | $19.03 | $10.14 |
| PLAS0109-006 | CEMENT MASON/CONCRETE FINISHER | $33.48 | $24.81 |
| ELEC0008-013 | ELECTRICIAN | $30.31 | $16.08 |
| LABO0265-004 | LABORERMASON TENDER-BRICK | $25.90 | $18.40 |
| SUOH2012-018 | LABORERCOMMON OR GENERAL | $27.58 | $10.20 |
| SUOH2012-018 | OPERATOR |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $29.49 |
| $11.16 |
| SUOH2012-018 | OPERATORBACKHOE/EXCAVATOR | $25.25 | $9.38 |
| PAIN0707-001 | PAINTERBRUSH AND ROLLER | $33.95 | $20.20 |
| SUOH2012-018 | PLUMBER | $20.00 | $5.52 |
| ENGI0018-027 | POWER EQUIPMENT OPERATORBULLDOZER | $37.02 | $15.20 |
| ENGI0066-026 | POWER EQUIPMENT OPERATORCRANE | $36.92 | $24.01 |
| SUOH2012-018 | ROOFER | $16.85 | $3.83 |
| SHEE0033-039 | SHEET METAL WORKER(HVAC DUCT & UNIT INSTALLATION) | $25.96 | $15.92 |