Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Ohio: Cuyahoga. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BROH0005-010 | BRICKLAYER | $34.04 | $7.88 |
| SUOH2012-007 | CARPENTER | $18.50 | $8.33 |
| SUOH2012-007 | CEMENT MASON/CONCRETE FINISHER | $27.04 | $0.00 |
| ELEC0306-002 | ELECTRICIAN(EXCEEDING FOUR UNITS UNDER ONE ROOF) | $46.63 | $24.92 |
| ELEC0306-002 | ELECTRICIAN(FOUR OR LESS UNITS UNDER ONE ROOF) | $25.64 | $23.52 |
| LABO0265-004 | LABORERMASON TENDER-BRICK | $25.90 | $18.40 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUOH2012-007 |
| LABORERCOMMON OR GENERAL |
| $15.71 |
| $1.71 |
| SUOH2012-007 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $29.49 | $11.16 |
| SUOH2012-007 | OPERATORBACKHOE/EXCAVATOR | $16.00 | $1.33 |
| PAIN0707-001 | PAINTERBRUSH AND ROLLER | $33.95 | $20.20 |
| SUOH2012-007 | PLUMBER | $20.00 | $5.52 |
| ENGI0018-028 | POWER EQUIPMENT OPERATORBULLDOZER | $39.31 | $15.15 |
| ENGI0066-026 | POWER EQUIPMENT OPERATORCRANE | $36.92 | $24.01 |
| SUOH2012-007 | ROOFER | $16.85 | $3.83 |
| SHEE0033-034 | SHEET METAL WORKER(HVAC UNIT INSTALLATION) | $22.59 | $12.37 |
| SHEE0033-035 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $22.78 | $13.06 |