Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 7 counties in New York: Clinton, Franklin, Fulton, Hamilton, Lewis, Montgomery, St Lawrence. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNY2013-006 | CARPENTER | $21.55 | $12.41 |
| SUNY2013-006 | CEMENT MASON/CONCRETE FINISHER | $23.78 | $14.62 |
| ELEC0910-007 | ELECTRICIAN | $43.50 | $28.38 |
| SUNY2013-006 | LABORERCOMMON OR GENERAL, INCLUDING CEMENT MASON TENDING | $18.23 | $8.63 |
| SUNY2013-006 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $27.74 | $0.00 |
| SUNY2013-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $27.59 | $0.00 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUNY2013-006 |
| OPERATORBULLDOZER |
| $21.72 |
| $0.00 |
| SUNY2013-006 | PAINTER(BRUSH AND ROLLER) | $18.47 | $0.00 |
| SUNY2013-006 | PLUMBER | $18.45 | $2.26 |
| SUNY2013-006 | ROOFER | $16.47 | $0.36 |
| SUNY2013-006 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $17.41 | $2.46 |