Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New York: Yates. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0007-002 | BOILERMAKER | $39.35 | $33.18 |
| BRNY0003-026 | BRICKLAYER(ROCHESTER CHAPTER) | $35.81 | $27.65 |
| CARP0277-022 | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, AND FORM WORK | $32.64 | $21.97 |
| SUNY2009-033 | CEMENT MASON/CONCRETE FINISHER | $20.32 | $8.84 |
| ELEC0840-010 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING FOR PHONES, ALARMS AND HVAC TEMPERATURE CONTROLS & INSTALLATION OF ALARMS, PHONES AND COMPUTERS) | $45.00 | $31.12 |
| ELEV0027-005 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $61.52 |
| $38.44 |
| PAIN0677-001 | GLAZIER | $31.05 | $31.55 |
| SUNY2009-033 | INSULATOR - PIPE & PIPEWRAPPER | $27.72 | $9.00 |
| IRON0033-007 | IRONWORKER-FENCE ERECTOR | $35.75 | $30.80 |
| IRON0033-007 | IRONWORKER, ORNAMENTAL, REINFORCING AND STRUCTURAL | $35.75 | $30.80 |
| LABO0435-014 | LABORER(COMMON OR GENERAL; GRADE CHECKER; BRICK MASON TENDER; CEMENT/CONCRETE MASON TENDER; MORTAR MIXER) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $29.07 | $21.49 |
| SUNY2009-033 | LABORERASBESTOS ABATEMENT (REMOVAL FROM CEILINGS, FLOORS, AND WALLS) | $18.70 | $8.28 |
| SUNY2009-033 | LABORERASPHALT SHOVELER | $20.89 | $8.95 |
| SUNY2009-033 | LABORERPIPELAYER | $21.06 | $14.30 |
| LABO0435-014 | LABORER LANDSCALE FOOTNOTESA. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE HAS WORKED THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $26.22 | $21.49 |
| SUNY2009-033 | OPERATORROLLER | $24.15 | $17.01 |
| SUNY2009-033 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $23.59 | $9.95 |
| SUNY2009-033 | OPERATORAUGER | $21.19 | $15.85 |
| PAIN0004-051 | PAINTERSPRAY | $27.60 | $26.00 |
| PAIN0004-051 | PAINTERBRUSH & ROLLER | $27.00 | $26.00 |
| PLUM0013-007 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $42.68 | $27.88 |
| SUNY2009-033 | PLUMBER | $27.15 | $12.47 |
| ENGI0158-015 | POWER EQUIPMENT OPERATORFORKLIFT FACTORY RATED UNDER 15 FEET FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $42.34 | $35.20 |
| ENGI0158-015 | POWER EQUIPMENT OPERATORFORKLIFT FACTORY RATED 15 FEET & OVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $42.34 | $35.20 |
| ENGI0158-015 | POWER EQUIPMENT OPERATOREXCEPT TRACTOR-MOUNTED, RUBBER TIRED (BACKHOE) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $43.14 | $35.20 |
| ENGI0158-015 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER; CRANE OILER; LOADER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $42.34 | $35.20 |
| ENGI0158-015 | POWER EQUIPMENT OPERATORBULLDOZER; CONCRETE PUMP, TRUCK MOUNTED; CRANE; DRILL; EXCAVATOR FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $42.34 | $35.20 |
| ENGI0158-015 | POWER EQUIPMENT OPERATORBACKHOE TRACTOR MOUNTED, RUBBER TIRED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, AND CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS ON THE WORK DAY IMMEDIATELY PRECEEDING THE HOLIDAY OR ON THE SCHEDULED WORK DAY IMMEDIATELY FOLLOWING THE HOLIDAY | $42.34 | $35.20 |
| ROOF0022-003 | ROOFER, INCLUDES ROOF TEAR OFF, AND INSTALLATION OF MODIFIED BITUMEN, RUBBER, SHAKE & SHINGLE, AND SINGLE PLY ROOFS | $34.10 | $28.20 |
| SHEE0046-005 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $43.01 | $28.66 |
| SFNY0669-006 | SPRINKLER FITTER(FIRE SPRINKLERS) | $45.06 | $30.71 |
| BRNY0003-026 | TILE FINISHER(ROCHESTER CHAPTER) | $31.06 | $22.92 |
| SUNY2009-033 | TILE SETTER | $24.02 | $0.00 |
| SUNY2009-033 | TRUCK DRIVERDUMP TRUCK | $16.00 | $2.62 |