Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building, Heavy, Highway
Covers 1 county in New York: Putnam. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0005-001 | BOILERMAKER FOOTNOTEA. PAID HOLIDAYS: NEW YEAR'S DAY, THANKSGIVING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY AND GOOD FRIDAY, FRIDAY AFTER THANKSGIVING, CHRISTMAS EVE DAY AND NEW YEAR'S EVE | $68.88 | $49.83 |
| BRNY0024-001 | BRICKLAYER(MARBLE POLISHERS) | $52.32 | $36.25 |
| BRNY0005-004 | BRICKLAYER, CEMENT MASON, PLASTERER & STONEMASONBRICKLAYERS, CEMENT MASONS, PLASTERERS, STONE MASONS (BUILDING CONSTRUCTION) | $46.39 | $37.45 |
| CARP2287-002 | CARPENTER(SOFT FLOOR LAYERS) | $44.69 | $38.17 |
| CARP0279-002 | CARPENTERS(BUILDING) | $50.12 | $31.73 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0279-002 |
| CARPENTERS(HEAVY & HIGHWAY) |
| $50.12 |
| $31.73 |
| CARP1556-007 | DIVER | $75.46 | $55.84 |
| CARP1556-007 | DIVER TENDER | $55.00 | $55.84 |
| CARP1556-006 | DOCK BUILDER & PILEDRIVERMEN | $60.59 | $55.84 |
| ELEC0363-003 | ELECTRICIAN(PUTNAM COUNTY) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $51.50 | $42.22 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Substation:) | $63.14 | $33.82 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Substation:) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: MECHANIC. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (TRUCK DRIVER). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: LINEMAN AND TECHNICIAN. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $54.19 | $35.69 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AF | $43.35 | $30.73 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: FLAGMAN. PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $32.51 | $29.93 |
| ELEC1249-002 | ELECTRICIAN, LINE CONSTRUCTION-LIGHTING AND TRAFFIC SIGNAL INCLUDING ANY ANDALL FIBER OPTIC CABLE NECESSARY FOR THE TRAFFIC SIGNAL SYSTEMS, AND TRAFFIC MONITORING SYSTEMS, ROAD WEATHER INFORMATION SYSTEMS: GROUNDMAN (DIGGING MACHINE OPERATOR). PAID HOLIDAYS: A. MEMORIAL DAY, NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE H | $48.77 | $31.31 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION ANDMAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITE | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SUBSTATIONGROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARYINSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRE | $49.25 | $31.15 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTCABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTGROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTINSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 |
| ELEV0138-001 | ELEVATOR MECHANIC FOOTNOTEA.VACATION: 6%/UNDER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. 8%/OVER 5 YEARS BASED ON REGULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $76.12 | $38.98 |
| ASBE0091-001 | HAZARDOUS MATERIAL HANDLER(DUTIES LIMITED TO PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $46.62 | $49.30 |
| ASBE0091-001 | INSULATOR/ASBESTOS WORKER(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS) | $46.62 | $49.30 |
| IRON0417-001 | IRONWORKER A) PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING (UNPAID), CHRISTMAS DAY | $42.63 | $53.70 |
| LABO0235-001 | LABORER(BUILDING) | $44.05 | $32.40 |
| LABO0060-001 | LABORERSHEAVY: GROUP 7 ASBESTOS AND TOXIC WASTE LABORER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $51.64 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 6 FLAGPERSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $42.96 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 5 COMMON LABORERS, SIGNAL PERSON AND PIT PERSON , TRUCK SPOTTERS, POWDER PERSON, LANDSCAPE AND NURSERY PERSON, DUMP PERSON. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $49.56 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 4 GENERAL CONCRETE LABORERS-ANYTHING PERTAINING TO CONCRETE, AGGREGATE OR CONCRETE MATERIAL HANDLING, PUDDLERS, ASPHALT WORKER, ROCK SCALERS, VIBRATOR OPERATOR, BIT GRINDER, CONCRETE GRINDER, AIR TAMPERS AND ALL TAMPERS NOT COVERED BY ANY OTHER CLASSIFICATION, FORM PIN PULLER, PUMPS AND THEIR OPERATION, SERVICE OF AIR POWER, EPOXY AND WATERPROOFING WORKER, FINE GRADE PERSON BETWEEN FORMS, BARCO RAMMER, GUARD AND GUIDE RAIL AND LINK FENCE, STEEL KINGS. FOOTNOTE: A. PAID HOLIDAYS: NEW | $49.93 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 3 ASPHALT CURB MACHINE OPERATOR, JEEPER OPERATOR, PAVEMENT BREAKER OPERATOR, POWER SAW OPERATOR, JACK HAMMER DRILLER. ALL TYPES OF PHEUMATIC TOOLS GASOLINE DRILLER, CONCRETE SAW, GUNNITING, RAILROAD SPIKE PULLER AND SANDBLASTING, PIPE LAYER, DECK WINCHES ON SCOWS, POWER BUGGY OPERATOR, POWER WHEELBARROW OPERATOR. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTI | $50.29 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 2 BURNER, JUMBO DRILLER, JOY DRILLER, WAGON DRILLER, AIR TRACK DRILLER, HYDRAULIC DRILLER, CONCRETE FORM ALIGNER, CONCRETE FORM AND CURB FORM (STEEL), ASPHALT SCREEDMAN, ASPHALT RAKER. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $50.71 | $28.98 |
| LABO0060-001 | LABORERSHEAVY: GROUP 1 BLASTERS. FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $52.11 | $28.98 |
| LABO0235-004 | LABORERSHIGHWAY: GROUP 3 ASPHALT RAKER, ASPHALT SCREEMAN, DRILLERS (ALL), LASER BEAM OPERATOR, FORM SETTER/ALIGNERS, BLASTERS, LEAD MAN, TUNNEL & CAISSON FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $43.90 | $27.80 |
| LABO0235-004 | LABORERSHIGHWAY: GROUP 1 FLAGPERSON, PLACING AND MAINTENANCE OF ALL FLARES, CONES, LIGHTS, SIGNS, BARRICADES, TRAFFIC PATTERNS, AND ALL REFLECTIVE TYPE MATERIALS FOR TRAFFIC CONTROL, CUSTODIAL WORK, TRAFFIC DIRECTORS, TEMPORARY HEAT OR LIGHT TENDERS FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY AND CHRISTMAS DAY | $36.45 | $27.80 |
| LABO0235-004 | LABORERSHIGHWAY: GROUP 2 GENERAL LABORERS, DUMPMAN, PITMAN, CONCRETE MAN, SIGNAL MAN, PIPELAYER, RIP RAP, DRY STONE LAYER, JACK HAMMER, POWDERMAN, HIGHSCALERS POWER BUGGY OPERATOR, STEEL ROD CARRIER, VIBRATORY OPERATOR, OTHER MACHINE OPERATOR, WRECKING, VIBRATOR OPERATOR-COMPACTOR, GUNITE AND SAND BLASTING, WATER PUMP 2"" OR UNDER, NIPPER, CHUCKER, ASPHALT WORKER FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENTS DAY, GOOD FRIDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERAN'S DAY | $42.80 | $27.80 |
| BRNY0020-001 | MARBLE FINISHER | $49.99 | $37.54 |
| BRNY0004-001 | MARBLE MASON | $63.92 | $40.20 |
| CARP0740-001 | MILLWRIGHT | $60.83 | $58.03 |
| PAIN0009-003 | PAINTER(PAINTERS, PAPERHANGER, DRYWALL FINISHERS & LEAD ABATEMENT WORKER) | $44.75 | $44.11 |
| PAIN0009-003 | PAINTER(SPRAY, SCAFFOLD, SANDBLASTING) | $47.75 | $44.11 |
| PAIN0009-003 | PAINTER(GLAZIERS) | $49.20 | $57.20 |
| PLUM0021-001 | PLUMBER AND STEAMFITTER(ZONE 1) | $65.07 | $45.35 |
| BRNY0001-003 | POINTER, CLEANER AND CAULKER | $41.96 | $33.38 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 2-A (BUILDING CONSTRUCTION) COMPACTOR SELF-PROPELLED; GRADER; BULLDOZE D7 AND SIMILAR TRACTORS WITH A DRAW BAR HORSEPOWER OF 100 OR OVER; BULLDOZER D6 AND UNDER; WELDER; SCRAPER 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, ME | $56.97 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 1-A (BUILDING CONSTRUCTION) CARRIER- TRAILER HORSE; CONCRET-PORTABLE HOIST; CRANE & HOIST ENGINEER-STEEL (CONCRETE, MATERIAL, SUPER STRUCTURE SUB- STRUCTURE); DERRICK (STONE-STEEL); ELEVATOR & CAGE; HOIST- SINGLE/DOUBLE OR TRIPLE DRUM; HOIST-PORTABLE MOBILE UNIT; HOIST ENGINEER-CONCERT (CRANE-DERRICK-MINE HOIST); HOIST ENGINEER- MATERIAL; OVERHEAD CRANE; POWER HOUSE PLANT; TELEPHIES (CABLEWAY); WHIRLY; MAINTENANCE ENGINEER; LULL HILIFT OR SIMILAR; HYDRAULIC CRANE 25 TON AND OVER; CHERRY PI | $59.04 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 1-B (BUILDING CONSTRUCTION) COMPRESSOR (STEEL ERECTION); PULSE METER AND PUSH BUTTON BUZZ BOX; ELEVATOR; MECHANIC (OUTSIDE) ALL TYPES; WELDER; SCRAPERS 20 YDS STRUCK AND UNDER; MACHINE PULLING SHEEP'S FOOT ROLLER; VIBRATORY ROLLERS; ROLLER 4 TONS AND OVER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMO | $54.41 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 3-A (BUILDING CONSTRUCTION) ASPHALT PLANT; BOILER (HIGH PRESSURE); CONCRETE MIXING PLANTS; CONCRETE PUMP; FIREMEN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES); MIXER CONCRETE - 21E AND OVER; PORTABLE ASPHALT PLANT; PORTABLE BATCH PLANT; PORTABLE CRUSHER; QUARRY MASTER; STONE CRUSHER; WELL DRILLING MACHINE AND WELL POINT SYSTEM; CHERRY PICKER UNDER 10 TONS; HYDRAULIC CRANE UNDER 10 TONS; CONCERT BUFFY; | $54.88 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 3-B (BUILDING CONSTRUCTION) COMPRESSOR OVER 125 CU. FEET; CONVEYOR BELT MACHINE REGARDLESS OF SIZE; LIGHTING UNIT (PORTABLE & GENERATOR); WELDING MACHINE (STEEL ERECTION AND EXCAVATION); AND COMPRESSOR PLANT; STUD MACHINE; LADDER HOIST. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDEN | $52.25 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 4-A (BUILDING CONSTRUCTION) AIR TRACTOR DRILL; BATCH PLANT; BENDING MACHINE; CONCRETE BREAKER; CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE-CONCRETE; HEPAVAC CLEAN AIR MACHINE (ALL SIMILAR TYPES: REMOVAL OF ASBESTOS ETC.); MATERIAL HOPPER-SAND-STONE-CEMENT; MIXER-CONCRETE-UNDER 21E; MULCHING GRASS SPREADER; PUMP-GYPSUM, ETC., PUMP-PLASTER-GROUT -FIREPROOFING; SHOP MECHANIC (NOT EMPLOYED ON JOB SITE); ROLLER UNDER 4 TON; SPREADING AND FINE GRADING MACH | $54.33 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 4-B (BUILDING CONSTRUCTION) COMPRESSOR TO 125 FEET; DUST; DUST COLLECTOR; HEATER ALL TYPES; PUMP; PUMP STATION (WATER AND SEWER); STEAM JENNY; SWEEPER; CHIPPER; MULCHER. NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S B | $45.94 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 5-A (BUILDING CONSTRUCTION) MASTER MECHANIC NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $61.95 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 5-B (BUILDING CONSTRUCTION) UTILITY MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $47.00 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 5 (BUILDING CONSTRUCTION) MOTORIZED ROLLER (WALK BEHIND) NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $49.53 | $31.32 |
| ENGI0137-003 | POWER EQUIPMENT OPERATORSGROUP 6 (BUILDING CONSTRUCTION) WAREHOUSE MAN NOTES: HAZMAT: 20% ABOVE REGULAR RATE PUMPING OPERATION PREMIUM .50 CRANE OPERATORS (100-149 FT) 2.00 CRANE OPERATORS (149 FT +) 3.00 LOADER OPERATORS (OVER 5 CU Y) .50 SHOVEL OPERATORS (OVER 4 CU YD)1.00 FOOTNOTE: A. NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY THANKSGIVING DAY, CHRISTMAS DAY, PLUS LINCOLN'S BIRTHDAY, WASHINGTON'S BIRTHDAY, GOOD FRIDAY, COLUMBUS DAY, NOVEMBER ELECTION DAY, VETERAN'S DAY | $49.26 | $31.32 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5-A-5 JERSEY-SPREADER, PAVEMENT BREAKER (AIR RAM); POST HOLE DIGGER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKS | $59.19 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5 OILER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5-A-4 HOIST ENGINEER- STEEL -SUB STRUCTURE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS | $70.41 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5-A-3 ENGINEER-- PILE DRIVER (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $75.13 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5-A-2 ENGINEER - ALL TOWER CRANES, ALL CLIMBING CRANES AND ALL CRANES OF 100 TON CAPACITY OR GREATER (3900 MANITOWAC OR SIMILAR) IRRESPECTIVE OF MANUFACTURER AND REGARDLESS OF HOW THE SAME IS RIGGED (EXCEPT FOR PILE RIGS). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLI | $77.82 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 5-A-1 MASTER MECHANIC (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $64.02 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 4-B OILER; COMPRESSOR - COMPRESSOR PLANT; PAINT COMPRESSOR-STEEL ERECTION; CONVEYOR BELT MACHINE; LIGHTING UNIT (PORTABLE & GENERATOR); OILER; PUMPS - PUMP STATION-WATER-SEWER- GYPSUM- PLASTER, ETC.; ROLLER-MOTORIZED (WALK-BEHIND); WELDING MACHINE (STEEL ERECTION EXCAVATION); WELL POINT SYSTEM; BENDING MACHINE; DUST COLLECTOR; MIXER - CONCRETE UNDER 21-E; HEATER ALL TYPES; STEAM JENNY; SYPHON PUMP-AIR-STEAM; TAR JOINT MACHINE; VIBRATOR (1 TO 5); COMPRESSOR TRUCK MOUNTED (2-6) (HEAVY & HIGH | $44.19 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 4-A SERVICE MEN (FUEL OR GREASE TRUCK). (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DA | $51.57 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 3 A: AIR TRACTOR DRILL; ASPHALT PLANT; BATCH PLANT; BOILER (HIGH PRESSURE; CONCRETE BREAKER; CONCRETE PUMP CONCRETE SPREADER; CURB CUTTER MACHINE; FARM TRACTOR (ALL TYPES); FINISHING MACHINE (CONCRETE); FINE GRADING MACHINE; FIREMAN; FORKLIFT; FORKLIFT (ELECTRIC); JOY DRILL OR SIMILAR TRACTOR DRILLING MACHINE; LOADER - 1 1/2 YARDS AND UNDER; LOCOMOTIVE (ALL SIZES), MAINTENANCE ENGINEER; MACHINE PULLING SHEEPS FOOT ROLLER; MATERIAL HOPPER; MIXER CONCRETE - 21-E AND OVER; MULCHING GRASS SPRE | $56.81 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 2-B MECHANIC (OUTSIDE) ALL TYPES (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $59.67 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 2-A BALLAST REGULATORS; COMPACTOR SELF-PROPELLED; COW TRACKS; FUSION MACHINE; RAIL ANCHOR MACHINES; ROLLER 4 TON AND OVER; SCRAPERS - 20 YARDS STRUCK; SWITCH TAMPERS; VIBRATORY ROLLER, ETC. (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S B | $57.84 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 1-B ROAD PAVER, ASPHALT (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NOVEMBER ELECTION DAY; THANKSGIVING DAY; AND CHRISTMAS DAY | $63.70 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 1 BOOM TRUCK; CHERRY PICKER; CLAMSHELL; CRANE, (CRAWLER, TRUCK); DRAGLINE; ROUGH TERRAIN CRANE (HEAVY & HIGHWAY) NOTES: LOADER OPERATOR (OVER 5 CU YDS) .50 SHOVAL OPERATORS (OVER 4 CU YD) 1.00 HAZMAT PREMIUM OVER REGULAR RATE 20% CRANES: 100 FT- 149 FT: RECEIVE $2.00 MORE THAN GROUP 1 RATE 149 FT AND OVER RECEIVE $3.00 MORE THAN GROUP 1 RATE FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY; LINCOLN'S BIRTHDAY; GOOD FRIDAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS DAY; COLUMBUS DAY; NO | $68.63 | $35.25 |
| ENGI0137-006 | POWER EQUIPMENT OPERATORSGROUP 1-A AUGER; AUTO GRADER; DYNAHOE AND DUAL PURPOSE AND SIMILAR MACHINES; BOAT CAPTAIN; BORING MACHINE (ALL TYPES); BULL DOZER-ALL SIZES; CENTRAL MIX PLANT OPERATOR; CHIPPER-ALL TYPES; CLOSE CIRCUIT T.V.; COMPACTOR WITH BLADE; CONCRETE PORTABLE HOIST; C.M.I. OR SIMILAR; CONWAY OR SIMILAR MUCKING MACHINES; GRADALL, SHOVEL BACKHOE, ETC. GRADER; DERRICK, (STONE- STEEL; ELEVATOR & CAGE, MATERIALS OR PASSENGERS; FRONT END LOADERS OVER 1 1/2 YDS.; HOIST SINGLE, DOUBLE, TRIPLE DRUM, HOIST PORTABLE M | $60.42 | $35.25 |
| ROOF0008-002 | ROOFER | $50.25 | $32.62 |
| SHEE0038-001 | SHEET METAL WORKER | $55.29 | $47.43 |
| SFNY0669-002 | SPRINKLER FITTER | $57.20 | $32.66 |
| BRNY0007-001 | TERRAZZO FINISHER | $49.59 | $34.25 |
| BRNY0007-001 | TERRAZZO WORKER/SETTER | $64.62 | $37.63 |
| BRNY0007-002 | TILE FINISHER | $49.59 | $34.25 |
| BRNY0052-001 | TILE LAYER | $64.40 | $37.13 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 10 OFF ROAD EQUIPMENT (OVER 40 TONS) EUCLID, DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 | $50.51 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 11 OFF ROAD EQUIPMENT (UNDER 40 TONS) DJB HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS O | $50.26 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 1 LOWBOY (CARRYING EQUIPMENT) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AN | $51.26 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 2 STRAIGHT JOBS: 6-WHEELER, 10-WHEELER, A-FRAME TRUCKS (INSIDE CAB), WINCH TRUCK (INSIDE CAB), DYNAMITE TRUCK, SEEDING TRUCK, MULCHING TRUCK, AGITATOR TRUCK, WATER TRUCK, CEMENT TRUCKS (ALL TYPES), SUBURBANS, STATION WAGONS, CARS, PICKUPS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANK | $48.51 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 3 FUEL AND TIRE TRUCKS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 D | $48.96 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 4 TRACTOR TRAILERS (ALL TYPES) HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE A | $49.13 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 6 ATHEY WAGON, BELLY DUMPS, ARTICULATED DUMPS, TRAILER WAGONS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACA | $49.26 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 7 DARTS. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYME | $50.01 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 8 RXS HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS OF SERVICE AND 30 DAYS OF EMPLOYMENT | $50.38 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSGROUP 9 OFF ROAD EQUIPMENT (UNDER 40 TONS): EUCLID HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEAR | $49.88 | $38.93 |
| TEAM0456-001 | TRUCK DRIVERSHEAVY & HIGHWAY CONSTRUCION- GROUP 5 14 WHEELER. HAZARDOUS/TOXIC WASTE - AN ADDITIONAL 20% OF THE BASIC HOURLY WAGE RATE SET FORTH IN THIS WAGE DETERMINATION. A. PAID HOLIDAYS: NEW YEAR'S DAY, LINCOLN'S BIRTHDAY, PRESIDENT'S DAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, NOVEMBER ELECTION DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING AND CHRISTMAS DAY, PROVIDED EMPLOYEE WORKS TWO OR MORE DAYS IN THE CALENDAR WEEK IN WHICH THE HOLIDAY FALLS. PAID VACATION: 4 WEEKS PAID VACATION AFTER 20 YEARS | $48.63 | $38.93 |