Revision 2 · modified July 30, 2026 · published July 30, 2026 · Heavy, Highway
Covers 1 county in New York: Delaware. View the source document on SAM.gov.
DOL marked this determination modified July 30, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0040-001 | ASBESTOS WORKERS/INSULATOR(INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHNICAL SYSTEMS.) | $41.74 | $27.58 |
| BOIL0197-001 | BOILERMAKER | $43.34 | $27.66 |
| ELEC0325-003 | CABLE SPLICER(TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.) | $50.43 | $33.29 |
| CARP0277-018 | CARPENTER | $39.52 | $27.16 |
| BRNY0003-017 | CEMENT MASON(BINGHAMTON CHAPTER) | $38.63 | $25.05 |
| ELEC0325-003 |
Parsed from the SAM.gov document, synced August 1, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(TOWNSHIPS OF DAVENPORT, DELHI, DEPOSIT, FRANKLIN, HAMDEN, MASONVILLE, MEREDITH, SIDNEY, TOMPKINS AND WALTON AND THAT PORTION OF COLCHESTER AND HANCOCK TOWNSHIPS NORTH OF THE EAST BRANCH OF THE DELAWARE RIVER.) |
| $42.68 |
| $33.06 |
| ELEC0363-005 | ELECTRICIAN(DELAWARE COUNTY (PORTION OF)) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $46.50 | $40.57 |
| ELEC1249-003 | ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS LINEMAN & TECHNICIAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFOR | $52.86 | $35.60 |
| ELEC1249-003 | ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN (TRUCK DRIVER) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY B | $42.29 | $30.66 |
| ELEC1249-003 | ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS MECHANIC FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY | $42.29 | $30.66 |
| ELEC1249-003 | ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS GROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMP | $47.57 | $31.03 |
| ELEC1249-003 | ELECTRICIAN LINE CONSTRUCTIONLIGHTING AND TRAFFIC SIGNAL INCLUDING ANY AND ALL FIBER OPTIC CABLE NECESSARY FOR TRAFFIC SIGNAL SYSTEMS, TRAFFIC MONITORING SYSTEMS AND ROAD WEATHER INFORMATION SYSTEMS FLAGMAN FOOTNOTE: A. NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, PLUS PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF THE STATE OF NEW YORK, PROVIDED THE EMPLOYEE WORKS THE DAY BEFORE OR THE DAY | $31.72 | $29.87 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Substation:) | $63.14 | $33.82 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONCABLE SPLICER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $64.59 | $42.92 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Substation:) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONFLAGMAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $35.34 | $30.12 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Substation:) | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN DIGGING MACHINE OPERATOR (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cab | $55.40 | $31.78 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installat | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONGROUNDMAN TRUCK DRIVER (TRACTOR TRAILER UNIT) (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Substation:) | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONLINEMAN & TECHNICIAN (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable ins | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Overhead and underground distribution and maintenance work and all overhead and underground transmission line work including any and all fiber optic ground wire, fiber optic shield wire or any other like product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities :) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Substation:) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN, LINE CONSTRUCTIONMECHANIC (Switching structures; railroad catenary installation and maintenance, third rail type underground fluid or gas filled transmission conduit and cable installations (including any and all fiber optic ground product by any other name manufactured for the dual purpose of ground fault protection and fiber optic capabilities), pipetype cable installation and maintenance jobs or projects, and maintenance bonding of rails; Pipetype cable installation) | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION OVERHEAD AND UNDERGROUND DISTRIBUTION ANDMAINTENANCE WORK AND ALL OVERHEAD AND UNDERGROUND TRANSMISSION LINE WORK INCLUDING ANY AND ALL FIBER OPTIC GROUND WIRE, FIBER OPTIC SHIELD WIRE OR ANY OTHER LIKE PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES : LINEMAN AND TECHNICIAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITE | $61.56 | $36.21 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SUBSTATIONGROUND MAN TRUCK DRIVER FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENTS' DAY, MEMORIAL DAY, GOOD FRIDAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY FOR THE PRESIDENT OF THE UNITED STATES AND ELECTION DAY FOR THE GOVERNOR OF NEW YORK STATE, PROVIDED THE EMPLOYEE WORKS TWO DAYS BEFORE OR TWO DAYS AFTER THE HOLIDAY | $49.25 | $31.15 |
| ELEC1249-004 | ELECTRICIAN LINE CONSTRUCTION SWITCHING STRUCTURES; RAILROAD CATENARYINSTALLATION AND MAINTENANCE, THIRD RAIL TYPE UNDERGROUND FLUID OR GAS FILLED TRANSMISSION CONDUIT AND CABLE INSTALLATIONS (INCLUDING ANY AND ALL FIBER OPTIC GROUND PRODUCT BY ANY OTHER NAME MANUFACTURED FOR THE DUAL PURPOSE OF GROUND FAULT PROTECTION AND FIBER OPTIC CAPABILITIES), PIPETYPE CABLE INSTALLATION AND MAINTENANCE JOBS OR PROJECTS, AND MAINTENANCE BONDING OF RAILS; PIPETYPE CABLE INSTALLATION GROUNDMAN TRUCK DRIVER (TRACTOR-TRAILER UNIT) FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, PRE | $49.25 | $31.15 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTCABLE SPLICER A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.81 | $6.99 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTGROUNDMAN A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $20.53 | $6.39 |
| ELEC1249-008 | ELECTRICIAN LINE CONSTRUCTION TELEPHONE, CATV FIBEROPTICS CABLE AND EQUIPMENTINSTALLER REPAIRMAN-TELEDATA LINEMAN/TECHNICIAN-EQUIPMENT OPERATOR A. NEW YEAR'S DAY, PRESIDENT'S DAY, GOOD FRIDAY, DECORATION DAY, INDEPENDENCE DAY, LABOR DAY, VETERAN'S DAY, THANKSGIVING DAY, DAY AFTER THANKSGIVING, CHRISTMAS DAY | $38.73 | $6.93 |
| PAIN0677-003 | GLAZIER | $30.00 | $31.95 |
| ASBE0040-001 | HAZARDOUS MATERIAL HANDLER(DUTIES LIMITED TO PREPARATION WETTING; STRIPPING; REMOVAL; SCRAPPING; VACUUMING; BAGGING; AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT FROM MECHANICAL SYSTEMS) | $41.74 | $27.58 |
| IRON0012-001 | IRONWORKERS(STRUCTURAL, ORNAMENTAL, RODMAN, MACHINERY MOVER, RIGGER, FENCE ERECTOR, REINFORCING, STONE DERRICKMEN) | $38.50 | $25.48 |
| IRON0012-001 | IRONWORKERS(SHEETER) | $38.75 | $25.48 |
| LABO0017-004 | LABORERSHEAVY & HIGHWAY: GROUP 4: ASBESTOS, TOXIC, LEAD OR HAZARDOUS MATERIAL ABATEMENT FOREMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, HAMDEN, HARPERSFIELD, KORTRIGHT, MIDDLETON, ROXBURY AND STAMFORD) FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, ELECTION DAY, VETERANS DAY, THANKSGIVING DAY, CHRISTMAS DAY, PROVIDED THE EMPLOYEE IS AN EMPLOYEE OF THE COMPANY PRIOR TO THE SCHEDULED HOLIDAY AND REPORTS TO WORK THE FIRST DAY FOLLOWING TH | $54.70 | $32.45 |
| LABO0017-004 | LABORERSHEAVY & HIGHWAY: GROUP 3: INGERSOLL RAND, HEAVY DUTY CRAWLER MASTER TYPE HCMZ, ANY DRILL USING 4"" OR LARGER BIT, ASBESTOS, TOXIC, BIO-REMEDIATION, PHYTO-REMEDIATION, LEAD OR HAZARDOUS MATERIAL ABATEMENT WHEN PROTECTIVE CLOTHING AND EQUIPMENT IS REQUIRED, ALL WORKING FOREMEN, INCLUDING GRADE, PIPE, CONCRETE, CLEARING, BLACKTOP, DRILL, PAVING AND BLASTER ETC., HYDRAULIC DRILL OR SIMILAR, FORKLIFT FOR MASONRY ONLY, BLASTER AND ASPHALT SCREEDMAN. (TWPS OF ANDES, BOVINA, DAVENPORT, DELHI, FRANKLIN, | $49.40 | $32.45 |
| LABO0017-004 | LABORERSHEAVY & HIGHWAY: GROUP 2: GENERAL LABORER, CHUCK TENDER, HANDLING AND SISTRIBUTING OF DRINKING WATER, DISTRIBUTING ALL TOOLS AND SUPPLIES OF LABORERS, AFL-CIO TRADES TENDERS, NIPPER, POWDER CARRIER, MAGAZINE TENDER, WAREHOUSE LABORERS, CONCRETE MAN, VIBRATOR MAN, MASON TENDER, MORTAR MAN, SPRAYING BRUSHING AND COVERING OF CONCRETE FOR CURING AND PRESERVATIVE PURPOSES, SCAFFOLD, BUILDER, CONCRETE CURB AND SIDEWALK FORM SETTER, PERMANENT TRAFFIC STRIPING AND REFLECTIVE DEVICES, PLACING AND MAINTEN | $44.80 | $32.45 |
| LABO0017-004 | LABORERSHEAVY & HIGHWAY: GROUP 1: | $40.80 | $32.45 |
| LABO0785-014 | LABORERSHEAVY AND HIGHWAY GROUP 5 HAZARDOUS WASTE REMOVAL (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY | $38.76 | $25.60 |
| LABO0785-014 | LABORERSHEAVY AND HIGHWAY GROUP 1 | $35.56 | $25.60 |
| LABO0785-014 | LABORERSHEAVY AND HIGHWAY GROUP 4 BLASTERS, FORM SETTERS, STONE OR GRANITE CURB SETTERS (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY | $36.16 | $25.60 |
| LABO0785-014 | LABORERSHEAVY AND HIGHWAY GROUP 3 ALL ROCK OR DRILLING MACHINE OPERATORS (EXCEPT QUARRY MASTER AND SIMILAR TYPE), ACETYLENE TORCH OPERATORS AND ASPHALT PAVER, POWERMAN (TOWNSHIPS OF SIDNEY, MASONVILLE, WALTON, TOMPKINS, DEPOSIT, HANCOCK AND COLCHESTER) FOOTNOTE A. PAID HOLIDAYS: MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY AND NEW YEARS DAY | $35.96 | $25.60 |
| LABO0785-014 | LABORERSHEAVY AND HIGHWAY GROUP 2 BULL FLOAT, CHAIN SAW, CONCRETE AGGREGATE BIN, CONCRETE BOOTMAN, GIN BUGGY, HAND OR MACHINE VIBRATOR, JACKHAMMER, MASON TENDER, MORTOR MIXER, PAVEMENT BREAKER, HANDLERS OF ALL STEEL MESH, SMALL GENERATORS FOR LABORERS' TOOLS, INSTALLATION OF BRIDGE DRAINAGE PIPE, PIPELAYERS, VIBRATOR TYPE ROLLERS, TAMPER, DRILL DOCTOR TAIL OR SCREW OPERATOR ON ASPHALT PAVER, WATER PUMP OPERATOR (1 1/2' AND SINGLE DIAPHRAM), NOZZLE (ASPHALT GUNNITE, SEEDING AND SANDBLASTING), LABORERS ON | $35.76 | $25.60 |
| PAIN0004-006 | PAINTERS(BRIDGES) | $42.06 | $30.59 |
| PLUM0021-004 | PLUMBER(ZONE 2 MIDDLETOWN AND ROXBERRY TOWNSHIPS) | $60.66 | $45.35 |
| PLUM0112-001 | PLUMBER AND STEAMFITTERSOUTHERN ZONE (REMAINDER OF COUNTY) | $42.63 | $32.24 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORS(HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 1 AUTOGRADE-PAVEMENT-PROFILER (CMI ND SIMILAR TYPE); AUTOGRADE-PAVEMENT-PROFILER (CMI AND SIMILAR TYPES);AUTOGRADE SLIPFORM PAVER (CMI AND SIMILAR TYPES); BACKHOE; CENTRAL POWER PLANTS (ALL TYPES); CONCRETE PAVING MACHINE (S-240 AND SIMILAR TYPES); CRANES (ALL TYPES, INCLUDING OVERHEAD AN STRADDLE TRAVELING TYPE); CRANES, GANTRY; DERRICKS (LAND, FLOATING OR CHICAGO BOOM TYPE); DRILLMASTER/QUARTMASTER (DOWN THE HOLE DRILL) ROTARY DRILL; SEL | $61.72 | $37.50 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORS(HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 5 OILER, TIRE REPAIR NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $52.88 | $37.50 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORS(HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 4 BROOMS AND SWEEPERS; CHIPPERS; COMPRESSORS (SINGLE); CONCRETE SPREADERS (SMALL TYPE); CONVEYOR LOADERS (NOT INCLUDING ELEVATOR GRADERS); ENGINES, LARGE DIESEL (1620 H.P.) AND STAGING PUMP; FARM TRACTORS; FERTILIZING EQUIPMENT (OPERATOR AND MAINTENANCE OF); FINE GRADE MACHINE (SMALL TYPE); FORM LINE GRADERS (SMALL TYPE); FRONT END LOADER (UNDER 1 YD); GENERATOR (SINGLE); GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; HEATERS (NELSON OR OTHER TY | $56.59 | $37.50 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORSGROUP 6 HELICOPTERS PILOT NOTES: HAZMAT PREMIUM 20 PERCENT HYDROGRAPHIC PREMIUM .50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY, AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $63.54 | $37.50 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORS(HEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION): GROUP 3 ASPHALT CRUBING MACHINE, ASPHALT PLANT ENGINEER, ASPHALT SPREADER;AUTOGRADE TUBE FINISHER & TEXTURING MACHINE (CMI AND SIMILAR TYPES) AUTOGRADE CURECRETE MACHINE (CMI AND SIMILAR TYPES); BAR BENDING MACHINE (POWER), BATCHERS, BATCHING PLANT AND CRUSHER ON SITE; BELT CONVEYOR SYSTEM; BOOM TYPE SKIMMER MACHINES; BRIDGE DECK FINISHER; BULLDOZERS (ALL); CAR DUMPERS (AIROAD); CHIEF OF PARTY; COMPRESSOR AND BLOWER TYPE UNITS (USED) INDEPENDENT | $58.22 | $37.50 |
| ENGI0825-014 | POWER EQUIPMENT OPERATORSHEAVY AND HIGHWAY, ROAD AND STREET CONSTRUCTION - GROUP 2 ""A"" FRAME; BACKHOE (COMBINATION); BOOM ATTACHMENT ON LOADERS (RATE BASED ON SIZE OF BUCKET) NOT APPLICABLE TO PIPEHOOK) BORING AND DRILLING MACHINES, BRUSH CHOPPER, SHREDDER AND TREE SHREDDER TREE SHEARER, CABLEWAYS, CARRYALLS, CONCRETE PUMP, CONCRETE PUMPING SYSTEM, PUMPCRETE AND SIMILAR TYPES, CONVEYORS, 125 FT AND OVER; DRILL DOCTOR (DUTIES INCLUDE DUST COLLECTOR, MAINTENANCE), FRONT END LOADER (22 YDS. BUT LESS THAN 5 YDS.), GRADERS | $60.13 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 3: HELICOPTER PILOT NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $64.85 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 4: AIR COMPRESSORS, WELDING MACHINES AND GENERATORS ARE COVERED AND ARE DEFINED AS COVER: GAS, DIESEL, OR ELECTRIC DRIVEN EQUIPMENT AND SOURCES OF POWER FROM A PERMANENT PLANT: IE: STAEM, COMGRESSED AIR, HYDRAULIC OR OTHER POWER, FOR THE OPERATING OF ANY MACHINE OR AUTOMATIC TOOLS, USED IN THE ERECTION, ALTERATION, REPAIR AND DISMANTLING OF TANKS AND ANY AND ALL ""DUAL PURPOSE"" TRUCKS USED ON THE CONSTRUCTION JOB SITE, OR IN THE LOADING AND UNLOADING OF MATERIALS, AT THE | $61.28 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 5: OILER NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $54.07 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 1 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB 140 FT AND OVER, ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB 140 FT AND OVER ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROV | $70.24 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 1: BACKHOE; CRANES (ALL TYPES); DRAGLINES, FRONT END LOADERS (5YDS. AND OVER), GRADALLS, HELICOPTERS (CO-PILOT), HELICOPTERS (COMMUNICATION ENGINEER); SCOOPER (LOADER AND SHOVEL) KOEHRING; TRENCH MACHINES NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY | $62.35 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 5: OILER, GREASE, GAS, FUEL AND OIL SUPPLY TRUCKS; TIRE REPAIR NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS. | $53.34 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 4: COMPRESSOR (SINGLE); DOPE POTS (MECHANICAL WITH OR WITHOUT PUMP); DUST COLLECTORS; PUMPS (4 INCH SUCTION AND OVER); PUMPS (2 OF LESS THAN 4 INCHE SUCTION); PUMPS, DIESEL ENGINE AND HYDRAULIC (IMMATERIAL OF POWER); WELDING MACHINES, GAS OR ELECTRIC CONVERTERS OF ANY TYPE- 2 OR 3 IN BATTERY MULTPLE WELDERS; WELL POINT SYSTEMS (INCLUDING INSTALLATION AND MAINTENANCE); FRAM TRACTORS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUN | $57.10 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 2: ""A"" FRAME; BACKHOE (COMBINATION HOE LOADER); BORING AND DRILLING MACHINES; DITCHING MACHINES, SMALL, DITCHWITCH, VERMEER OR SIMILAR TYPE; FORKLIFTS; FRONT END LOADERS 92 YDS. AND OVER BUT LESS THAN 5 YDS.); GRADERS, FINISH (FINE); HYDRAULIC CRANES 10 TONS AND UNDER (OVER 10 TONS) CRANES RATE APPLIES); SIDE BOOMS: WINCH TRUCKS (HOISTING). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID HOLIDAYS: A. NEW YEA | $60.70 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 6: HELICOTER PILOT NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% TUNNEL PREMIUM .75 PAID HOLIDAYS: A. NEW YEARS, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY NOVEMBER ELECTION DAY AND VETERANS DAY, DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN CALENDAR WEEK DURING WHICH THE HOLIDAYS OCCURS | $64.28 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(OILOSTATIC MAINLINES AND TRANSPORTATION PIPE LINES): GROUP 3: BACKFILLER; BROOMS AND SWEEPERS; BULLDOZERS; COMPRESSOR (2 OR 3 IN BATTERY); CHIEF OF PARTY; FRONT END LOADERS (UNDER 2 YDS); GENERATORS; GIRAFFE GRINDERS; GRADERS AND MOTOR PATROLS; MACHNIC; PIPE BENDING MACHINE (POWER);TRACTORS; WATER AND SPRINKLER TRUCKS USED ON JOB SITE OR IN CONDUCTION WITH JOB SITE); WELDER AND REPAIR MECHANIC; CAPTAIN (POWER BOATS); TUG MASTER (POWER BOATS). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20% T | $58.56 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 2 CRANES (ALL CRANES, LAND OR FLOATING WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND); DERRICKS, LAND, FLOATING OR CHICAGO BOOM TYPE WITH BOOMS INCLUDING JIB LESS THAN 140 FT ABOVE GROUND). NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PRO | $68.58 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION) : GROUP 3 ""A"" FRAME, CHERRY PICKERS 10 TONS AND UNDER, HOISTS SHALL ALSO INCLUDE STEAM, GAS, DESEL, ELECTRIC, AIR HYDRAULIC, SINGLE AND DOUBLE DRUM CONCRETE, BRICK SHAFT CAISSON, OR ANY OTHER SIMILAR TYPE HOISTING MACHINES, PORTABLE OR STATIONARY, EXCEPT CHICAGO BOOM TYPE; JACKS: SCREW AIR HYDRAULIC POWER OPERATED UNIT OR CONSOLE TYPE (NOT HAND JACK OR PILE LOAD TEST TYPE); SIDE BOOMS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PA | $61.29 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 4 AERIAL PLATFORM USED AS HOIST; COMPRESSOR: 2 OR 3 IN BATTERY; ELEVATORS OR HOUSE CARS; CONVEYORS AND TUGGER HOSITS; CHIEF OF PARTY; FIREMANP; FORKLIFT; GENERATORS (2 OR 3); MAINTENANCE (UTILITY MAN); ROD BENDING MACHINE (POWER); WELDING MACHINES (GAS OR ELECTRIC, 2 OR 3 IN BATTERY, INCLUDING DIESELS); CAPTAIN: POWER BOATS: TUG MASTER: POWER BOATS. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDE | $58.63 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 5 COMPRESSOR, SINGLE; WELDING MACHINE, SINGLE, GAS, DIESEL, AND ELECTRIC CONVERTERS OF ANY TYPE: WELDING SYSTEM MULTPLE (RECTIFIER TRANSFORMER TYPE); GENERATOR, SINGLE. NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE D | $57.10 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 6 OILER, STADDLE CARRIER NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $53.34 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(STEEL ERECTION): GROUP 7 HELICOPTER PILOT . NOTES: HYDROGRAPHIC PREMIUM .50 HAZMAT PREMIUM 20 PERCENT TUNNEL PREMIUM .75 FOOTNOTE: A. PAID HOLIDAYS: NEW YEARS DAY, INDEPENDENCE DAY, MEMORIAL DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, NOVEMBER ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY IN THE CALENDAR WEEK DURING WHICH THE HOLIDAY OCCURS | $65.74 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 1: OPERATING ENGINEERS ON ALL CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB 140 FT OR MORE ABOVE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY OCCURS | $69.96 | $37.50 |
| ENGI0825-015 | POWER EQUIPMENT OPERATORS(TANK ERECTION): GROUP 2: OPERATING ENGINEER ON ALL EQUIPMENT, INCLUDING CRANES, DERRICKS, ETS WITH BOOMS INCLUDING JIB, LESS THAN 140 FT ABOVE THE GROUND. NOTES: TUNNEL PREMIUM $.75 HAZMAT PREMIUM 20% HYDROGRAPHIC PREMIUM $.50 FOOTNOTES: A. PAID HOLIDAYS: NEW YEARS DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, WASHINGTON'S BIRTHDAY, ELECTION DAY, VETERANS DAY AND DECORATION DAY PROVIDED THE EMPLOYEE WORKS ONE DAY DURING THE CALENDAR WEEK IN WHICH THE HOLIDAY O | $68.37 | $37.50 |
| ROOF0203-001 | ROOFER | $30.50 | $19.84 |
| SHEE0112-004 | SHEET METAL WORKER | $35.94 | $20.89 |
| TEAM0317-010 | TRUCK DRIVERS(HEAVY & HIGHWAY): GROUP 1 PICK-UPS; PANEL TRUCKS; FLATBOY MATERIALS TRUCKS (STRAIGHT JOBS); SINGLE AXLE DUMP TRUCKS; DUMPSTERS; RECEIVERS; GREASERS; TRUCK TIREMAN FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $37.27 | $29.29 |
| TEAM0317-010 | TRUCK DRIVERS(HEAVY & HIGHWAY): GROUP 2 TANDEMS; BATCH TRUCKS; MECHANIC FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $37.27 | $29.29 |
| TEAM0317-010 | TRUCK DRIVERS(HEAVY & HIGHWAY): GROUP 3 SEMI-TRAILERS; LOW-BOY TRUCKS; ASPHALT DISTRIBUTOR TRUCKS; AGITATOR; MIXER TRUCKS AND DUMPCRETE TYPE VEHICLES; TRUCK MECHANIC; FUEL TRUCK FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $37.27 | $29.29 |
| TEAM0317-010 | TRUCK DRIVERS(HEAVY & HIGHWAY): GROUP 4 SPECIALIZED EARTH MOVING EQUIPMENT - EUCLID TYPE OR SIMILAR OFF-HIGHWAY EQUIPMENT, WHERE NOT SELF-LOADED; STRADDLE (ROSS) CARRIER; SELF-CONTAINED CONCRETE UNIT FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $37.47 | $29.29 |
| TEAM0317-010 | TRUCK DRIVERS(HEAVY & HIGHWAY): GROUP 5 OFF-HIGHWAY TANDEM BACK DUMP; TWIN ENGINE EQUIPMENT; DOUBLE-HITCHED EQUIPMENT WHERE NOT SELF-LOADED FOOTNOTE: A. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY PROVIDED THE EMPLOYEE WORKS THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $37.47 | $29.29 |