Revision 1 · modified July 30, 2026 · published July 30, 2026 · Building
Covers 1 county in Nevada: Washoe. View the source document on SAM.gov.
DOL marked this determination modified July 30, 2026 (revision 1). The classifications that moved are listed below, old→new.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SANV2025-001 | Air Balance TechnicanJourneyman | $59.85 | $33.51 |
| SANV2025-001 | Alarm InstallerJourneyman | $42.08 | $0.00 |
| SANV2025-001 | BoilermakerJourneyman | $76.62 | $0.00 |
| SANV2025-001 | BricklayerJourneyman | $45.94 | $18.44 |
| SANV2025-001 | CarpenterJourneyman | $43.13 | $25.29 |
| SANV2025-001 | Cement MasonJourneyman | $43.06 |
Parsed from the SAM.gov document, synced August 1, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $13.86 |
| SANV2025-001 | Electrician-Communication TechnicianCommunication Technician | $50.93 | $0.00 |
| SANV2025-001 | Electrician-Lineman/Groundman/Heavy Equipment OperatorEquipment Specialist | $54.50 | $22.88 |
| SANV2025-001 | Electrician-Lineman/Groundman/Heavy Equipment OperatorGroundman | $41.68 | $22.23 |
| SANV2025-001 | Electrician-Lineman/Groundman/Heavy Equipment OperatorLineman | $72.26 | $26.05 |
| SANV2025-001 | Electrician-Neon SignJourneyman | $64.86 | $0.00 |
| SANV2025-001 | Electrician-WiremanCable Splicer | $55.78 | $30.66 |
| SANV2025-001 | Electrician-WiremanWireman | $48.50 | $29.99 |
| SANV2025-001 | Elevator ConstructorJourneyman Mech | $87.48 | $47.89 |
| SANV2025-001 | Fence ErectorJourneyman | $35.70 | $17.58 |
| SANV2025-001 | FlagpersonJourneyman | $33.58 | $17.58 |
| SANV2025-001 | FloorcovererJourneyman | $42.63 | $19.41 |
| SANV2025-001 | GlazierJourneyman | $29.70 | $0.00 |
| SANV2025-001 | Highway StripersJourneyman | $38.20 | $17.58 |
| SANV2025-001 | Hod Carrier-Brick Mason TenderJourneyman | $35.95 | $17.58 |
| SANV2025-001 | Hod Carrier-Plasterer TenderGun Tender | $37.29 | $17.58 |
| SANV2025-001 | Hod Carrier-Plasterer TenderJourneyman | $36.29 | $17.58 |
| SANV2025-001 | IronworkerJourneyman | $51.85 | $39.12 |
| SANV2025-001 | LaborersFurniture Mover | $31.79 | $17.58 |
| SANV2025-001 | LaborersGroup 1-A (Flagger) | $33.58 | $17.58 |
| SANV2025-001 | LaborersGroup 1 (All cleanup work of debris, grounds, and building including windows and tile; Dumpmen or Spotter (other than asphalt); Handling and Servicing of Flares; General Laborer; Guideposts and Highway Signs; Guardrail Erection and Dismantling; Limber, Brushloader and Piler; Pavement Marking and Highway Striping; Traffic Barrier Erector; Tending to portable space heaters; Profilograph work all types manual, self propelled or carts; Gabion basket, building, handling, installation and rigging; Dry | $35.45 | $17.58 |
| SANV2025-001 | LaborersGroup 2 (Choker setter or Rigger (clearing work only) Pittsburgh; Chipper and similar type brush shredders; Concrete worker (wet or dry) all concrete work not listed in Group 3 included but not limited to: concrete forms stripping, handling, cleaning, oiling and moving to the next point of installation.; Crusher or Grizzly Tender; Greasing Dowels; Guinea Chaser (Stakemen); Panel Forms (wood or metal) handling, cleaning and stripping of Loading and unloading, (Carrying and handling of all rods an | $35.55 | $17.58 |
| SANV2025-001 | LaborersGroup 3A (Concrete Specialist; Setting screeds; Screed pins; Curb forms and curb and gutter forms; Using Darby and push floats; Hand trowels or hand floating; Marking edging; Using base cove or step tools; Spreading and finishing gypsum; Concrete grinding machines (the terms do not include Rotomill machines for highway overlay grinding); Troweling machines; Floating machines; Finishing of epoxy or resin materials; Operation of skill saw; Laser Screed; Laser Level; Curb and Slipform machines; Sta | $39.13 | $17.58 |
| SANV2025-001 | LaborersGroup 3 (Asphalt Workers (Ironers, Shovelers, Cutting Machine); Buggymobile; Chainsaw, Faller, Logloader and Bucker; Compactor (all types); Concrete Mixer under 1/2 yard; Concrete Pan Work (Breadpan type), handling, cleaning\stripping; Concrete Saw, Chipping, Grinding, Sanding, Vibrator; Cribbing, Shoring, Lagging, Trench Jacking, Hand-Guided Lagging Hammer; Curbing or Divider machine; Curb Setter (precast or cut); Ditching Machine (hand-guided); Drillers Helper, Chuck Tender; Fence erector incl | $35.70 | $17.58 |
| SANV2025-001 | LaborersGroup 4 (Burning and Welding in connection with Laborers' work; Joy Drill Model T\/\/M-2A, Gardner Denver Model DN143 and similar type drills (in accordance with Memorandum of Understanding between Laborers and Operating Engineers dated at Miami, Florida, Feb. 3, 1954) and Track Drillers, Diamond Core Drillers, Wagon Drillers, Mechanical Drillers on Multiple Units; High scalers including but not limited to laying, anchoring, pinning, cabling and stretching of any rock fall netting, mesh or wire | $35.95 | $17.58 |
| SANV2025-001 | LaborersGroup 5A (Pavement Marking and Highway Striping; Pavement Marking and Highway Striping work includes but is not limited to: All work by any method preformed in connection with the permanent or temporary application and installation of pavement marking of any kind, brand, type or style on parking lots, airfields, highways, streets and other such surfaces and all work performed in connection with removal of pavement.) | $38.20 | $17.58 |
| SANV2025-001 | LaborersGroup 5 (Construction Specialists; Blasters and Powdermen, all work of loading, placing, and blasting of all powder and explosives of any type, regardless of method used for such loading and placing; Asbestos removal; Lead abatement; Hazardous waste; Material removal) | $36.25 | $17.58 |
| SANV2025-001 | Laborers(Group 6) Gunmen, Materialmen | $35.25 | $17.58 |
| SANV2025-001 | Laborers(Group 6) Nozzleman, Rodmen | $35.25 | $17.58 |
| SANV2025-001 | Laborers(Group 6) Reboundmen | $35.60 | $17.58 |
| SANV2025-001 | LaborersLandscape | $30.29 | $17.58 |
| SANV2025-001 | Lubrication and Service EngineerLubrication and Service Engineer (mobile and grease rack) | $43.33 | $34.85 |
| SANV2025-001 | Mechanical InsulatorJourneyman | $56.36 | $26.91 |
| SANV2025-001 | MillwrightJourneyman | $50.83 | $33.14 |
| SANV2025-001 | MillwrightWelder (add $3 to Journey base) | $53.83 | $33.14 |
| SANV2025-001 | Operating EngineersGroup 7 (Auger type drilling equipment over 30 ft. depth digging capacity M.R.C.; Compressor (over 2); Concrete Conveyor or Concrete Pump, truck or equipment mounted (any assistance required shall be performed by an Assistant to Engineer) Boom length to apply; Concrete Conveyor, Building Site; Drilling and Boring Machine, vertical and horizontal (not to apply to waterliners, wagon drills or jack hammers); Crusher Plant Engineer; Generators; Kolman Loader; Material Hoist (two (2) or more drums); | $43.33 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 10A (Backhoe-Hydraulic (up to and including one (1) cu. yd.); Backhoe (up to and including one (1) cu. yd.) (Cable); CMI Dual Lane Auto-Grader SP30 or similar type; Cranes (not over twenty-five (25) tons) (hammerhead and gantry); Finish Blade; Gradalls (up to and including one (1) cu. yd.); Motor Patrol Operator; Power Shovels, Clamshells, Draglines, Cranes (up to and including one (1) cu. yd.); Rubber-Tired Scraper, Self-Loading (twin engine); Self-Propelled Boom-Type Lifting Device, cent | $44.78 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 10 (Boom-Type Backfilling Machine; Bridge Crane; Cary-Lift or similar; Chemical Grouting Machine; Derricks (two (2) Group 10 Operators required when swing engine remote from hoist); Derrick Barges (except excavation work); Euclid Loader and similar types; Heavy Duty Repairman; Heavy Duty Rotary Drill Rigs; Lift-Slab (Vagtborg and similar types); Loader (over two and one-half (2 1/2 cu. yds. up to and including four (4) cu. yds.); Locomotive (over one hundred (100) tons, single or multiple | $44.59 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 11A (Band Wagons (in conjunction with Wheel Excavators); Operator of Helicopter (when used in construction work); Loader (over twelve (12) cu. yds.); Multi-Engine Earthmoving Equipment (over seventy-five (75) cu. yds. ""struck"" m.r.c.); Power Shovels. Clamshells, Draglines, Backhoes, and Gradalls (over seven 7 cu. yds. m.r.c.); Remote-Controlled Earth Moving Equipment; Wheel Excavator (over seven hundred fifty (750) cu. yds. per hour)) | $46.66 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 11 (Automatic Asphalt or Concrete Slip-Form Paver; Automatic Railroad Car Dumper; Canal Trimmer; Cary Lift, Campbell or similar type; Cranes (over twenty-five (25) tons); Euclid Loader when controlled from the Pullcat; Finish Blade; Gradesetter, Grade Checker; Highline Cableway Operator; Loader (over four (4) cu. yds. up to and including twelve (12) cu. yds.); Multi-Engine Earthmoving Equipment (up to and including seventy-five (75) cu. yds. struck m.r.c.); Multi-Engine Scrapers (when used | $45.02 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 11B (Holland Loader or similar or Loader (over 18 cu. yds.)) | $47.47 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 1A (Oiler (Construction); Partsman) | $41.07 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 2 (Compressor Operator; Material Loader and/or Conveyor Operator (handling building materials); Pump Operator) | $41.60 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 3 (Bobcat or similar loader, 1/4 cu. yd. or less; Concrete Curing Machines (streets, highways, airports, canals); Conveyor Belt Operator (tunnel); Forklift (under 20); Engineer Generating Plant (500 K.W.); Mixer Box Operator (concrete plant); Motorman; Rodman/Chainman; Rotomist Operator; Oiler (truck crane)) | $41.87 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 4 (Concrete Mixer Operator, Skip type; Dinky Operator; Forklift (20' or over) or Lumber Stacker; Ross Carrier; Skip Loader Operator (under one (1) cu. yd.); Tie Spacer) | $42.61 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 5 (Concrete Mixers (over one (1) cu. yd.); Concrete Pumps or Pumpcrete Guns; Elevator and Material Hoist (one (1) drum); Groundman for Asphalt Milling and similar) | $42.92 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 6 (Auger type drilling equipment up to and including 30 ft. depth digging capacity M.R.C.; Boom Truck or Dual-Purpose a-Frame Truck; B.L.H. Lima Road Pactor or similar; Chip Box Spreader (Flaherty type or similar); Concrete Batch Plant (wet or dry); Concrete Saws (highways, streets, airports, canals); Locomotives (over thirty (30) tons); Maginnis International Full Slab Vibrator (airports, highways, canals and warehouses); Mechanical Finishers (concrete) (Clary, Johnson, Bidwell Bridge Dec | $43.08 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 8 (Articulated on-Site Dump Trucks; Asphalt Plant Engineer; Asphalt Milling Machine; Cast-In-Place Pipe-Laying Machine; Combination Slusher and Motor Operator; Concrete Batch Plant (multiple units); Dozer Operator; Drill Doctor; Elevating Grader Operator; Stiff Frame Off Road Haul Trucks; Grooving and Grinding Machine (highways); Ken Seal Operator; Marination Plant; Loader (up to and including two and one-half (2 1/2) cu. yds); Mechanical Finishers or Spreader Machine (asphalt, Barber-Gree | $43.87 | $34.85 |
| SANV2025-001 | Operating EngineersGroup 9 (Chicago Boom; Combination Backhoe and Loader (up to and including 3/8 cu. yd.); Combination Mixer and Compressor (gunite); Heavy Duty Repairman and/or Welder; Lull Hi-Lift (twenty (20) feet or over); Mucking Machine; Sub-Grader (Gurries or other types); Tractor (with Boom) (06 or larger); Track-Laying-Type Earthmoving Machine (single engine with tandem scrapers)) | $44.24 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 8 (Deckhand; Fireman) | $44.44 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 6 (Deck Engineer) | $44.19 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 4 (Assistant Operator in lieu of Assistant to Engineer; Forklift, 10 tons and over; Heavy Duty Repairman/Welder) | $48.58 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 3 Truck Crane Oiler | $47.19 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 3 Oiler | $45.27 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 3 (Derrick Barge Pedestal mounted under 45 tons; Self-Propelled Boom Type Lifting Device 45 tons and under; Skid/Scow Piledriver, any tonnage; Truck Crane or Crawler, land or barge mounted 45 tons and under) | $50.09 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 1 Oiler | $45.68 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 2 Truck Crane Oiler | $47.41 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 2 Oiler | $45.50 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 1 (Derrick Barge Pedestal mounted over 100 tons; Clamshells over 7 cu. yds.; Self-Propelled Boom Type Lifting Device, over 100 tons; Truck Crane or Crawler, land or barge mounted over 100 tons) | $53.08 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 2 (Derrick Barge Pedestal mounted 45 tons up to and including 100 tons; Clamshells up to and including 7 cu. yds.; Self-Propelled Boom Type Lifting Device over 45 tons; Truck Crane or Crawler, land or barge mounted, over 45 tons up to and including 100 tons) | $51.54 | $34.85 |
| SANV2025-001 | Operating Engineers-Cranes & PiledriverGroup 1 Truck Crane Oiler | $47.57 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 1 (Cranes over 100 tons; Derrick over 100 tons; Self-Propelled Boom Type Lifting Devices over 100 tons) | $53.61 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 1 Oiler | $45.48 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 1 Truck Crane Oiler | $47.44 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 2 (Cranes over 45 tons up to and including 100 tons; Derrick, 100 tons and under; Self-Propelled Boom Type Lifting Device, over 45 tons; Tower Crane) | $52.10 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 2 Oiler | $45.27 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 2 Truck Crane Oiler | $47.19 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 3 (Cranes, 45 tons and under; Self-Propelled Boom Type Lifting Device, 45 tons and under) | $50.86 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 3 Hydraulic | $46.64 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 3 Oiler | $45.05 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 3 Truck Crane Oiler | $46.97 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 4 (Chicago Boom; Forklift, 10 tons and over; 59; Heavy Duty Repairman/Welder) | $49.13 | $34.85 |
| SANV2025-001 | Operating Engineers Steel Fabricator & ErectorGroup 5 (Boom Cat) | $48.03 | $34.85 |
| SANV2025-001 | PainterSwing Stage | $41.93 | $16.71 |
| SANV2025-001 | PainterBrush/Roller Painter | $39.43 | $16.71 |
| SANV2025-001 | PainterPaperhanger | $42.19 | $16.71 |
| SANV2025-001 | PainterProtective Coating-Application Brush | $41.93 | $16.71 |
| SANV2025-001 | PainterProtective Coating-Application Industrial Spray | $43.93 | $16.71 |
| SANV2025-001 | PainterSpecialty Pay(Faux Finish,Graining,Marbelizing) | $41.40 | $16.71 |
| SANV2025-001 | PainterSpray Painter | $41.93 | $16.71 |
| SANV2025-001 | PiledriverTender | $47.99 | $25.29 |
| SANV2025-001 | PiledriverDiver-Diving (Wet Pay) | $97.98 | $25.29 |
| SANV2025-001 | PiledriverJourneyman Driverman | $43.63 | $25.29 |
| SANV2025-001 | PiledriverStand By Diver | $48.99 | $25.29 |
| SANV2025-001 | PiledriverCertified Welder | $44.63 | $25.29 |
| SANV2025-001 | PlastererJourneyman | $44.23 | $17.14 |
| SANV2025-001 | Plumber/PipefitterJourneyman | $53.38 | $27.72 |
| SANV2025-001 | Refrigeration MechanicJourneyman | $43.10 | $26.54 |
| SANV2025-001 | RooferJourneyman | $40.76 | $12.42 |
| SANV2025-001 | Sheet Metal WorkerJourneyman | $47.51 | $33.14 |
| SANV2025-001 | Sprinkler FitterJourneyman | $53.77 | $31.15 |
| SANV2025-001 | TaperJourneyman | $46.00 | $17.36 |
| SANV2025-001 | Tile Setter/Terrazzo Worker/Marble MasonTerrazzo/Marble Mason - Journeyman | $55.32 | $0.00 |
| SANV2025-001 | Tile Setter/Terrazzo Worker/Marble MasonTile Setter - Journeyman | $53.78 | $0.00 |
| SANV2025-001 | Tile Setter/Terrazzo Works/Mable Mason - Finisher | $43.46 | $0.00 |
| SANV2025-001 | Traffic Barrier Erector | $35.45 | $17.58 |
| SANV2025-001 | Truck Driver | $34.68 | $0.00 |