Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in New Mexico: Dona Ana. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| CARP1319-011 | CARPENTER(FORM WORK ONLY) | $27.31 | $13.18 |
| SUNM2016-008 | CARPENTER, EXCLUDES FORM WORK | $16.43 | $0.00 |
| SUNM2016-008 | CEMENT MASON/CONCRETE FINISHER | $19.44 | $8.08 |
| ELEC0611-001 | ELECTRICIAN | $34.50 | $10.81 |
| SUNM2016-008 | IRONWORKER, REINFORCING | $27.80 | $0.00 |
| SUNM2016-008 | LABORERCOMMON OR GENERAL | $15.68 | $0.35 |
| SUNM2016-008 | LABORER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $16.67 |
| $3.04 |
| SUNM2016-008 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.85 | $4.19 |
| SUNM2016-008 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.06 | $0.00 |
| SUNM2016-008 | OPERATORBULLDOZER | $21.00 | $0.00 |
| SUNM2016-008 | OPERATORGRADER/BLADE | $19.02 | $0.00 |
| SUNM2016-008 | OPERATORLOADER | $18.30 | $0.00 |
| SUNM2016-008 | OPERATOROILER | $18.23 | $0.00 |
| SUNM2016-008 | OPERATORROLLER | $18.83 | $0.00 |
| SUNM2016-008 | TRUCK DRIVERDUMP TRUCK | $15.53 | $0.00 |