Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 4 counties in New Mexico: Bernalillo, Sandoval, Torrance, Valencia. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNM2011-001 | CARPENTER, INCLUDING FORM WORK(SANDOVAL, TORRANCE, AND VALENCIA) | $13.70 | $0.44 |
| SUNM2011-001 | CARPENTER, INCLUDING FORM WORK(BERNALLLILO) | $13.73 | $0.44 |
| SUNM2011-001 | CEMENT MASON/CONCRETE FINISHER(BERNALLILO) | $15.35 | $0.26 |
| SUNM2011-001 | CEMENT MASON/CONCRETE FINISHER(SANDOVAL, TORRANCE, AND VALENCIA) | $15.58 | $0.26 |
| SUNM2011-001 | ELECTRICIAN(INCLUDING TRAFFIC SIGNALIZATION & INSTALLATION) | $25.91 | $9.45 |
| SUNM2011-001 | IRONWORKER, REINFORCING |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $22.61 |
| $6.03 |
| SUNM2011-001 | LABORER(TRAFFIC CONTROL (INCLUDES FLAGGER AND CONE SETTER)) | $14.27 | $0.35 |
| SUNM2011-001 | LABORER, COMMON OR GENERAL(BERNALLILO, TORRANCE, AND VALENCIA) | $11.82 | $0.35 |
| SUNM2011-001 | LABORER, COMMON OR GENERAL(SANDOVAL) | $11.85 | $0.35 |
| SUNM2011-001 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (BERNALLILO) | $14.73 | $0.26 |
| SUNM2011-001 | POWER EQUIPMENT OPERATOR(BACKHOE) | $20.92 | $3.62 |
| SUNM2011-001 | POWER EQUIPMENT OPERATORBOBCAT/SKID LOADER (SANDOVAL, TORRANCE, VALENCIA) | $14.91 | $0.26 |
| SUNM2011-001 | POWER EQUIPMENT OPERATOR(BROOM SWEEPER) | $16.67 | $1.57 |
| SUNM2011-001 | POWER EQUIPMENT OPERATOR(EXCAVATOR/TRACKHOE) | $20.10 | $0.26 |
| SUNM2011-001 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (BERNALLILO) | $16.78 | $0.26 |
| SUNM2011-001 | POWER EQUIPMENT OPERATORLOADER (FRONT END) (SANDOVAL, TORRANCE, VALENCIA) | $16.59 | $0.26 |
| SUNM2011-001 | POWER EQUIPMENT OPERATOROILER (BERNALILO, SANDOVAL, TORRANCE, & VALENCIA) | $22.08 | $8.72 |
| SUNM2011-001 | POWER EQUIPMENT OPERATOR(TRENCHER) | $15.22 | $0.26 |
| SUNM2011-001 | TRUCK DRIVERDUMP TRUCK (BERNALLILO) | $14.46 | $0.26 |
| SUNM2011-001 | TRUCK DRIVERDUMP TRUCK (SANDOVAL, TORRANCE, VALENCIA) | $14.51 | $0.26 |
| SUNM2011-001 | TRUCK DRIVERWATER TRUCK | $13.51 | $1.51 |