Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Mexico: Otero. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNM2010-013 | BOILERMAKER | $21.77 | $3.98 |
| SUNM2010-013 | BRICKLAYER | $20.36 | $5.74 |
| CARP1245-004 | CARPENTER(METAL STUD INSTALLATION ONLY) | $24.08 | $10.79 |
| SUNM2010-013 | CARPENTER(DRYWALL FINISHING/TAPING ONLY) | $20.18 | $4.54 |
| SUNM2010-013 | CARPENTER(FORM WORK ONLY) | $20.46 | $5.61 |
| SUNM2010-013 | CARPENTER(DRYWALL HANGING ONLY) | $21.39 | $2.85 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUNM2010-013 |
| CARPENTER(ACOUSTICAL CEILING INSTALLATION ONLY) |
| $20.79 |
| $0.00 |
| SUNM2010-013 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, BATT INSULATION, DRYWALLFINISHING/TAPING, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $20.86 | $6.25 |
| SUNM2010-013 | CEMENT MASON/CONCRETE FINISHER | $17.72 | $5.43 |
| ELEC0583-009 | ELECTRICIAN(EXCLUDING LOW VOLTAGE WIRING FOR ALARMS) | $38.00 | $9.82 |
| SUNM2010-013 | ELECTRICIAN(Low Voltage Wiring for Alarms) | $28.25 | $6.62 |
| SUNM2010-013 | FLOOR LAYERCARPET | $22.31 | $0.30 |
| SUNM2010-013 | GLAZIER | $20.15 | $3.95 |
| SUNM2010-013 | INSULATOR - BATT | $24.44 | $8.43 |
| IRON0495-009 | IRONWORKERORNAMENTAL | $28.05 | $18.11 |
| SUNM2010-013 | IRONWORKER, REINFORCING | $19.75 | $8.45 |
| IRON0495-009 | IRONWORKER, STRUCTURAL(METAL BUILDING ERECTION ONLY) | $28.05 | $18.11 |
| SUNM2010-013 | IRONWORKER, STRUCTURAL, EXCLUDES METAL BUILDING ERECTION | $22.00 | $9.03 |
| SUNM2010-013 | LABORERCOMMON OR GENERAL | $13.61 | $3.89 |
| SUNM2010-013 | LABORERLANDSCAPE & IRRIGATION | $10.60 | $0.24 |
| SUNM2010-013 | LABORERMASON TENDER - CEMENT/CONCRETE | $11.51 | $0.85 |
| SUNM2010-013 | LABORERPIPELAYER | $13.78 | $2.20 |
| SUNM2010-013 | LABORERMASON TENDER - BRICK | $13.77 | $4.35 |
| SUNM2010-013 | OPERATORFORKLIFT | $21.13 | $4.83 |
| SUNM2010-013 | OPERATORLOADER (FRONT END) | $21.55 | $4.97 |
| SUNM2010-013 | OPERATORGRADER/BLADE | $21.40 | $4.95 |
| SUNM2010-013 | OPERATORBACKHOE | $20.95 | $4.73 |
| SUNM2010-013 | PAINTERBRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $16.10 | $1.79 |
| PLUM0412-007 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION | $43.07 | $16.60 |
| SUNM2010-013 | PLASTERER | $12.00 | $0.00 |
| PLUM0412-007 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $43.07 | $16.60 |
| ENGI0953-012 | POWER EQUIPMENT OPERATOR((2) ROLLER(DIRT AND GRADE COMPACTION)) | $26.75 | $4.65 |
| ENGI0953-012 | POWER EQUIPMENT OPERATOR((4) BOBCAT/SKID LOADER) | $27.70 | $4.65 |
| ENGI0953-012 | POWER EQUIPMENT OPERATOR((8) CRANE) | $31.43 | $4.65 |
| SUNM2010-013 | ROOFER | $13.24 | $0.50 |
| SHEE0049-012 | SHEET METAL WORKER(HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $37.50 | $18.51 |
| SUNM2010-013 | SHEET METAL WORKER, EXCLUDES HVAC DUCT AND UNIT INSTALLATION | $22.01 | $9.65 |
| SUNM2010-013 | TILE FINISHER | $14.02 | $0.00 |
| SUNM2010-013 | TILE SETTER | $19.00 | $0.00 |
| SUNM2010-013 | TRUCK DRIVERDUMP TRUCK | $15.25 | $3.89 |
| SUNM2010-013 | TRUCK DRIVERPICKUP TRUCK | $15.91 | $3.13 |
| SUNM2010-013 | TRUCK DRIVERWATER TRUCK | $16.26 | $4.93 |