Revision 2 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in New Jersey: Burlington. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0014-003 | ASBESTOS WORKER/HEAT & FROST INSULATORINCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (BURLINGTON COUNTY (CITY OF BEVERLY; TOWNSHIPS OF CINNAMINSON, DELANCO, DELRON, EDGEWATER PARK, EVESHAM, HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE SHADE; TOWNSHIP OF MEDFORD; BOROUGH OF MEDFORD LAKES; TOWNSHIPS OF MO | $60.84 | $48.38 |
| ASBE0089-003 | ASBESTOS WORKER/HEAT & FROST INSULATORINCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT (BURLINGTON COUNTY (TOWNSHIPS OF BORDENTOWN, BURLINGTON, CHESTERFIELD, EASTHAMPTON, FLORENCE, MANSFIELD, MT. HOLLY, NEW HANOVER, NORTH HANOVER, PEMBERTON, SPRINGFIELD AND WOODLAND) PAID THE LAST DAY PRIOR TO THE CHRIS | $55.80 | $40.80 |
| CARP0006-009 | CARPENTERSCAFFOLD BUILDER THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $57.42 |
| $34.17 |
| CARP0006-013 | CARPENTERINCLUDING FORM WORK THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $57.42 | $34.17 |
| PLAS0592-036 | CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 |
| ELEC0269-020 | ELECTRICIANCABLE SPLICER BURLINGTON COUNTY (north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line) | $68.02 | $44.04 |
| ELEC0351-012 | ELECTRICIANCABLE SPLICER ON LEAD CABLE (BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $46.51 | $34.39 |
| ELEC0351-012 | ELECTRICIAN AND CABLE SPLICER(BURLINGTON COUNTY (SOUTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, DOES NOT INCLUDE MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, DOES NOT INCLUDE NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE) | $55.05 | $48.76 |
| ELEC0269-020 | ELECTRICIAN BURLINGTON COUNTY(north of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, includes Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, includes New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line) | $61.84 | $40.32 |
| IRON0399-005 | IRONWORKERREINFORCING | $53.24 | $38.40 |
| IRON0399-005 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 |
| LABO0077-008 | LABORERMASON TENDER: CEMENT/CONCRETE | $29.35 | $23.07 |
| LABO0172-009 | LABORERPIPELAYER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S D | $51.65 | $38.53 |
| LABO0172-009 | LABORERCOMMON OR GENERAL LABORER; LANDSCAPE LABORER, POWER TOOL OPERATOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS REQUIRED TO WEAR LEVEL A, B OR C PERSONAL PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS NOT REQUIRED TO WEAR LEVEL A, B, OR C PERSONAL PROTECTION: $1.00 PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, PRESIDENT'S DAY, MEMORIAL DAY, INDEPENDENC | $50.95 | $38.53 |
| CARP0715-007 | MILLWRIGHT WORK OF ERECTION AND DISMANTLING OF ELEVATORS AND TOWERS, SUCH ASCONCRETE CONVEYORS AND TEMPORARY MATERIAL ELEVATORS, SCAFFOLDING OR OTHER STRUCTURES TO BE USED AS SCAFFOLDING INSIDE OR OUTSIDE OF BUILDINGS: THE FIRST SIXTY FEET AT THE REGULAR RATE, 10% PER HOUR ADDITIONAL FOR EACH ADDITIONAL FIFTY FEET THEREAFTER | $58.84 | $35.06 |
| PAIN0711-023 | PAINTERWORK ON BRIDGES (MAJOR BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION) | $58.28 | $33.85 |
| PAIN0711-024 | PAINTERBRUSH AND ROLLER (REPAINT WORK, ON PROJECTS ON WHICH NO MAJOR ALTERATIONS OCCUR.) | $29.05 | $18.91 |
| PAIN0711-024 | PAINTERBRUSH AND ROLLER (NEW CONSTRUCTION) | $40.19 | $22.72 |
| CARP0454-009 | PILEDRIVERMAN PAID NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY,INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY. | $46.73 | $41.69 |
| PLUM0009-022 | PIPEFITTERSERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO MAGNOLIA ROAD, INCLUDES | $46.23 | $29.23 |
| PLUM0009-022 | PIPEFITTER(BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO MAGNOLIA ROAD, INCLUDES PEMBERTON BOROUGH; | $59.57 | $46.45 |
| PLUM0322-011 | PIPEFITTER(BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE PEMBERTON BOROUGH; THEN, SOUTH ON MAGNOLIA ROAD | $56.30 | $50.76 |
| ENGI0825-021 | POWER EQUIPMENT OPERATORGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE | $61.72 | $37.50 |
| ENGI0825-021 | POWER EQUIPMENT OPERATORGROUP 3 ASPHALT SPREADER; BULLDOZER; COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); CRUSHER; FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. | $58.22 | $37.50 |
| ENGI0825-021 | POWER EQUIPMENT OPERATORGROUP 4 BROOM; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); ROLLER, GRADE; PUMP HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL EL | $56.59 | $37.50 |
| ENGI0825-021 | POWER EQUIPMENT OPERATORGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-021 | POWER EQUIPMENT OPERATORGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| TEAM0469-007 | TRUCK DRIVERDUMP TRUCK; FLATBED TRUCK, PICK UP TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A | $48.63 | $42.66 |
| TEAM0469-007 | TRUCK DRIVEROFF THE ROAD TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, IN A ZONE REQUIRING LEVEL A PERSONAL PROTECTION FO | $48.78 | $42.66 |
| TEAM0676-004 | TRUCK DRIVERDUMP TRUCK; PICKUP TRUCK (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C OR D IS N | $44.30 | $34.11 |
| TEAM0676-004 | TRUCK DRIVEROFF THE ROAD TRUCK; FLATBED TRUCK (BURLINGTON COUNTY (WEST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIALS, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: $3.00 PER HOUR ADDITIONAL. WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE PERSONAL PROTECTION A, B, C | $44.65 | $34.11 |