| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0008-001 | ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontaminationof personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of mat | $28.37 | $21.62 |
| ASBE0014-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $60.84 | $48.38 |
| CARP0006-009 | CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0006-010 |
| CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) |
| $57.42 |
| $34.17 |
| PLAS0592-035 | CEMENT MASON/CONCRETE FINISHER | $49.57 | $37.06 |
| PAIN0711-018 | DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| ELEC0351-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER ON LEAD CABLE | $46.51 | $34.39 |
| ELEC0351-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) AND CABLE SPLICER | $55.05 | $48.76 |
| ELEV0005-004 | ELEVATOR A. PAID VACATIONEmployer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service. B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day | $71.85 | $38.44 |
| IRON0399-007 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 |
| IRON0399-007 | IRONWORKERREINFORCING | $53.24 | $40.40 |
| LABO0077-002 | LABORERMASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABO0077-005 | LABORERASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| BRNJ0007-012 | MARBLE SETTER | $64.66 | $40.97 |
| CARP0454-009 | PAID New Year's Day, Washington's Birthday, Memorial Day, Independence Day,Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday | $46.73 | $41.69 |
| PAIN0711-019 | PAINTER(SPRAY) | $45.55 | $29.86 |
| PAIN0711-019 | PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 |
| PLUM0322-009 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION | $56.30 | $50.76 |
| SUNJ2004-008 | PLASTERER | $42.33 | $0.00 |
| PLUM0322-009 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $56.30 | $50.76 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLI | $58.22 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 |
| ROOF0030-027 | ROOFERALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $46.03 | $34.27 |
| ROOF0030-027 | ROOFERSLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $38.95 | $21.85 |
| ROOF0030-027 | ROOFERMopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $35.95 | $21.85 |
| SHEE0019-018 | SHEET METAL WORKER(SIGN MAKERS & HANGERS) PAID HOLIDAY: ELECTION DAY | $35.13 | $24.76 |
| SHEE0019-018 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $62.62 | $50.66 |
| CARP0029-006 | SOFT FLOOR LAYER | $57.42 | $34.17 |
| SFNJ0692-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $60.83 | $30.34 |
| BRNJ0007-014 | TERRAZZO WORKER/SETTER | $61.77 | $42.82 |
| BRNJ0007-017 | TILE FINISHER Work grouting all epoxy$10.00 additional per day | $43.63 | $32.12 |
| BRNJ0007-017 | TILE SETTER | $52.31 | $38.01 |
| TEAM0676-003 | TRUCK DRIVEROFF THE ROAD Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than betw | $44.65 | $34.11 |
| TEAM0676-003 | TRUCK DRIVERDRUMP Hazardous waste removal work: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:0 | $44.30 | $34.11 |
| PAIN0021-035 | Work at 30 ft. above the working surface, or on the swing stage$1.00 per hour additional | $49.96 | $35.11 |
| CARP0715-007 | Work of erection and dismantling of elevators and towers, such as concreteconveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter. | $58.84 | $35.06 |
| BRNJ0002-013 | Work on high stacks22% per hour additional | $45.20 | $33.26 |