Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Jersey: Essex. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0008-001 | ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontaminationof personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of mat | $28.37 | $21.62 |
| ASBE0032-008 | ASBESTOS WORKER/HEAT & FROST INSULATOR(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $51.74 | $46.20 |
| BRNJ0002-014 | BRICKLAYER(INCLUDING CAULKING, CLEANING AND Work on high stacks: 22% per hour additional. | $49.60 | $37.96 |
| CARP0006-009 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter |
| $57.42 |
| $34.17 |
| CARP0006-010 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 |
| BRNJ0004-001 | CEMENT MASON | $49.60 | $37.96 |
| PAIN0711-018 | DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| ELEC0164-006 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) | $62.90 | $39.31 |
| ELEC0164-006 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER | $73.59 | $45.99 |
| ELEV0001-003 | ELEVATOR MECHANIC(Work on the addition, replacement, refurbishing or relocation of control, drive, generating equipment, hoistway or pit equipment, including work involving a structural rise in the elevator shafts in an existing building and other elevator work in the machine room, hoistway or pit; Also, changes in design and appearance of basic escalator PAID HOLIDAYS: New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday | $45.14 | $27.46 |
| ELEV0001-003 | ELEVATOR MECHANIC(ALL OTHER PAID HOLIDAYS: New Year's Day, President's Day, Good Friday, Memorial Day, Fourth of July, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving Day, and Christmas PAID VACATION: A worker who has worked less than 5 years: 4% of his or her hourly rate for all hours worked. A worker who has worked 5 to 10 years: 6% of his or her hourly rate for all hours worked. A worker who has worked 15 or more years: 8% of his or her hourly rate for all hours worked | $57.01 | $27.61 |
| PAIN0711-021 | GLAZIER Work welding or using a cutting torch$1.00 per hour Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour additional | $52.68 | $31.29 |
| IRON0011-012 | IRONWORKERREINFORCING | $49.94 | $50.32 |
| IRON0011-012 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $52.24 | $50.32 |
| LABO0077-002 | LABORERMASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABO0077-005 | LABORERASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| BRNJ0002-016 | MASON - Work on high stacks22% per hour additional | $49.60 | $37.96 |
| CARP0715-007 | MILLWRIGHT Work of erection and dismantling of elevators and towers, such asconcrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $58.84 | $35.06 |
| PAIN0711-019 | PAINTER(SPRAY) | $45.55 | $29.86 |
| PAIN0711-019 | PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 |
| PLUM0475-014 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION) | $56.34 | $50.80 |
| PLAS0029-003 | PLASTERER | $54.64 | $30.95 |
| PLUM0024-014 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $62.09 | $45.05 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLI | $58.22 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 |
| ROOF0004-011 | ROOFER(SHINGLES, SHAKE AND TILE) | $44.52 | $32.25 |
| SUNJ2004-007 | ROOFER, EXCLUDES SHAKE & SHINGLE, AND TILE ROOFS | $30.21 | $15.25 |
| SHEE0025-005 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $51.30 | $51.55 |
| CARP0029-008 | SOFT FLOOR LAYER | $57.42 | $34.17 |
| SFNJ0696-006 | SPRINKLER FITTER(FIRE SPRINKLERS) | $67.97 | $39.35 |
| BRNJ0007-022 | TILE FINISHER Work grouting all epoxy$10.00 additional per day | $50.05 | $33.90 |
| BRNJ0007-022 | TILE SETTER | $64.90 | $37.28 |
| TEAM0408-002 | TRUCK DRIVERDUMP TRUCK a. Employer contributes $2026.49 per month per worker for health and Hazardous waste removal work, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Hazardous waste removal work, where the worker is working in a hazardous waste site, in a zone requiring Level A personal protection for any of the workers: $3.00 per hour Hazardous waste removal work, where the worker | $46.41 | $31.82 |
| TEAM0408-002 | TRUCK DRIVEROFF THE ROAD TRUCK a. Employer contributes $2026.49 per month per worker for health and Hazardous waste removal work, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Hazardous waste removal work, where the worker is working in a hazardous waste site, in a zone requiring Level A personal protection for any of the workers: $3.00 per hour Hazardous waste removal work, where the | $46.51 | $31.82 |