Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Jersey: Camden. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0008-001 | ASBESTOS REMOVAL LABORER The removal, abatement, enclosure and decontaminationof personal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of mat | $28.37 | $21.62 |
| ASBE0014-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR(Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement) | $60.84 | $48.38 |
| BRNJ0002-013 | BRICKLAYER Work on high stacks22% per hour additional | $45.20 | $33.26 |
| CARP0006-009 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter |
| $57.42 |
| $34.17 |
| CARP0006-010 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION) | $57.42 | $34.17 |
| PLAS0592-035 | CEMENT MASON/CONCRETE FINISHER | $49.57 | $37.06 |
| PAIN0711-018 | DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| ELEC0351-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING): ELECTRICIAN AND CABLE SPLICER | $55.05 | $48.76 |
| ELEC0351-007 | ELECTRICIAN(INCLUDING LOW VOLTAGE WIRING) CABLE SPLICER AND LEAD CABLE | $46.51 | $34.39 |
| ELEC0351-009 | ELECTRICIANTELEDATA TECHNICIANS: 16 VOICE DATA LINES OR MORE AND FIBER OPTICS | $41.00 | $32.75 |
| ELEC0351-009 | ELECTRICIANTELEDATA TECHNICIANS: 15 VOICE DATA LINES OR LESS | $41.00 | $32.75 |
| ELEV0005-004 | ELEVATOR MECHANIC A. PAID VACATIONEmployer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day | $71.85 | $38.44 |
| SUNJ2004-004 | GLAZIER | $30.82 | $15.60 |
| IRON0399-007 | IRONWORKERREINFORCING | $53.24 | $40.40 |
| IRON0399-007 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $54.24 | $40.40 |
| LABO0077-002 | LABORERMASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABO0077-005 | LABORERASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPE LABORER, PIPELAYER, POWER TOOL OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| BRNJ0007-012 | MARBLE SETTER | $64.66 | $40.97 |
| CARP0715-007 | MILLWRIGHT Work of erection and dismantling of elevators and towers, such asconcrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $58.84 | $35.06 |
| PAIN0711-019 | PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 |
| PAIN0711-019 | PAINTER(SPRAY) | $45.55 | $29.86 |
| CARP0454-009 | PILEDRIVERMAN PAID HOLIDAYSNEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY. | $46.73 | $41.69 |
| PLUM0322-009 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION) | $56.30 | $50.76 |
| SUNJ2004-004 | PLASTERER | $42.33 | $0.00 |
| PLUM0322-009 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $56.30 | $50.76 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLI | $58.22 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 |
| ROOF0030-027 | ROOFERMopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $35.95 | $21.85 |
| ROOF0030-027 | ROOFERSLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $38.95 | $21.85 |
| ROOF0030-027 | ROOFERALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $46.03 | $34.27 |
| SHEE0019-018 | SHEET METAL WORKER(SIGN MAKERS & HANGERS) PAID HOLIDAY: ELECTION DAY | $35.13 | $24.76 |
| SHEE0019-018 | SHEET METAL WORKER(INCLUDING HVAC DUCT PAID HOLIDAY: ELECTION DAY | $62.62 | $50.66 |
| CARP0029-006 | SOFT FLOOR LAYER | $57.42 | $34.17 |
| SFNJ0692-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $60.83 | $30.34 |
| BRNJ0007-014 | TERRAZZO WORKER/SETTER | $61.77 | $42.82 |
| BRNJ0007-017 | TILE SETTER | $52.31 | $38.01 |
| BRNJ0007-017 | TILE Work grouting all epoxy$10.00 additional per day | $43.63 | $32.12 |
| TEAM0676-003 | TRUCK DRIVERDUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am an | $44.30 | $34.11 |
| TEAM0676-003 | TRUCK DRIVEROFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required: $1.00 per hour SHIFT WORK: An owner mandated irregular shift staring any time other than between 6:00 am | $44.65 | $34.11 |