Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Jersey: Burlington. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0008-001 | ASBESTOS REMOVAL The removal, abatement, enclosure and decontamination ofpersonal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materi | $28.37 | $21.62 |
| ASBE0014-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (CITY OF BEVERLY; TOWNSHIPS OF CINNAMINSON, DELANCO, DELRON, EDGEWATER PARK, EVESHAM, HAINESPORT AND LUMBERTON; BOROUGH OF MAPLE SHADE; TOWNSHIP OF MEDFOD; BOROUGH OF MEDFORD LAKES; TOWNSHIP OF RI | $60.84 | $48.38 |
| ASBE0089-003 | ASBESTOS WORKER/HEAT & FROST INSULATOR(INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS; ALSO, THE APPLICATION OF FIRESTOPPING MATERIAL TO OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS; ALSO, ALL LEAD ABATEMENT) (BURLINGTON COUNTY (TOWNSHIPS OF BORDENTOWN, BURLINGTON, CHESTERFIELD, EASTHAMPTON, FLORENCE, MANSFIELD, MT. HOLLY, NEW HANOVER, NORTH HANOVER, PEMBERTON, SPRINGFIELD AND WOODLAND) PAID HOLIDAYS: The last day prior |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $55.80 |
| $40.80 |
| BRNJ0002-013 | BRICKLAYER Work on high stacks22% per hour additional | $45.20 | $33.26 |
| CARP0006-009 | CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 |
| CARP0006-010 | CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 |
| PLAS0592-036 | CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 |
| PAIN0711-018 | DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| ELEC0351-001 | ELECTRICIANCABLE SPLICER ON LEAD CABLE (ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the O | $45.51 | $34.39 |
| ELEC0269-017 | ELECTRICIAN AND CABLE SPLICERINCLUDES LOW VOLTAGE WIRING (BURLINGTON COUNTY (NORTH OF A LINE FOLLOWING THE WEST AND SOUTH LIMITS OF BURLINGTON BOROUGH FROM THE DELAWARE RIVER, IN A SOUTHEASTERLY DIRECTION, TO THE BURLINGTON - MT. HOLLY ROAD; THEN, SOUTH-SOUTHEAST ALONG THE BURLINGTON - MT. HOLLY ROAD TO THE TOWN OF MT. HOLLY, INCLUDES MT. HOLLY; THEN, EAST ALONG THE PENNSYLVANIA RAILROAD TO THE TOWN OF NEW LISBON, INCLUDES NEW LISBON; THEN, CONTINUING ALONG THE PENNSYLVANIA RAILROAD TO THE OCEAN COUNTY LINE)) | $63.82 | $41.99 |
| ELEC0351-001 | ELECTRICIAN AND CABLE SPLICER(ATLANTIC COUNTY; BURLINGTON COUNTY (south of a line following the west and south limits of Burlington Borough from the Delaware River, in a southeasterly direction, to the Burlington - Mt. Holly road; then, south-southeast along the Burlington - Mt. Holly road to the town of Mt. Holly, does not include Mt. Holly; then, east along the Pennsylvania Railroad to the town of New Lisbon, does not include New Lisbon; then, continuing along the Pennsylvania Railroad to the Ocean County line); CAMDEN, C | $55.05 | $48.76 |
| ELEV0005-004 | ELEVATOR A. PAID VACATIONEmployer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day | $71.85 | $38.44 |
| PAIN0021-032 | GLAZIER(BURLINGTON COUNTY (south of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work at 30 ft. above the working surface, or on a swing stage: $1.00 per hour additional | $49.96 | $35.11 |
| PAIN0711-011 | GLAZIER(BURLINGTON COUNTY (north of a line drawn between these cities: Florence to Bustleton to Columbus to Jobstown to Pemberton to Ongs Hat to Chatsworth to Whiting to Pinewald to Ocean Gate to Seaside Work welding or using a cutting torch: $1.00 per hour Work on a swing stage scaffold; on a pipe scaffold providing the working height of the platform is 30 ft. or above; and on motorized lifts provided that the height of the lift platform is above the second floor or above thirty feet: $1.00 per hour a | $52.68 | $31.29 |
| IRON0399-005 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 |
| IRON0399-005 | IRONWORKERREINFORCING | $53.24 | $38.40 |
| LABO0077-002 | LABORERMASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABO0077-004 | LABORERASPHALT SHOVELER, ASPHALT SPREADER, LANDSCAPE LABORER, PIPELAYER, POWER TOOLE OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| SUNJ2004-003 | LABORERCOMMON OR GENERAL | $19.27 | $12.42 |
| BRNJ0007-012 | MARBLE SETTER | $64.66 | $40.97 |
| CARP0715-007 | MILLWRIGHT(Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.) | $58.84 | $35.06 |
| PAIN0711-019 | PAINTER(SPRAY) | $45.55 | $29.86 |
| PAIN0711-019 | PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 |
| CARP0454-009 | PILEDRIVERMAN PAID HOLIDAYSNEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED THAT THE WORKER WORKS ANY OF THE THREE DAYS IN THE FIVE-DAY WORK WEEK PRECEDING THE HOLIDAY AND THE FIRST WORK DAY AFTER THE HOLIDAY. | $46.73 | $41.69 |
| PLUM0009-015 | PIPEFITTERSERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia Road, includes | $46.23 | $29.23 |
| PLUM0009-015 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 to Magnolia R | $59.57 | $46.45 |
| PLUM0322-008 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Boro | $56.30 | $50.76 |
| SUNJ2004-003 | PLASTERER | $42.33 | $0.00 |
| PLUM0009-015 | PLUMBEREXCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia R | $59.57 | $46.45 |
| PLUM0009-015 | PLUMBERSERVICE AND REPAIR (BURLINGTON COUNTY (NORTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, INCLUDES BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, INCLUDES THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530; THEN, ALONG COUNTY ROAD ROUTE 530 TO Magnolia Road, includes | $46.23 | $29.23 |
| PLUM0322-008 | PLUMBEREXCLUDING HVAC PIPE INSTALLATION (BURLINGTON COUNTY (SOUTH OF A LINE DRAWN FROM THE TOWN OF BURLINGTON CITY, DOES NOT INCLUDE BURLINGTON CITY; THEN, ALONG COUNTY ROAD ROUTE 541 EAST, ALSO KNOWN AS HIGH ST., UNTIL IT REACHES THE CITY OF MT. HOLLY, DOES NOT INCLUDE THE CITY OF MT. HOLLY; THEN, ALONG MADISON AVE. IN MT. HOLLY TO STATE ROAD ROUTE 38 EAST; THEN, ALONG STATE ROAD ROUTE 38 EAST UNTIL IT CROSSES OVER STATE ROAD ROUTE 206 AND BECOMES COUNTY ROAD ROUTE 530, DOES NOT INCLUDE Pemberton Boro | $56.30 | $50.76 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLI | $58.22 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| ENGI0825-020 | POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 |
| ROOF0030-027 | ROOFERMopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $35.95 | $21.85 |
| ROOF0030-027 | ROOFERALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $46.03 | $34.27 |
| ROOF0030-027 | ROOFERSLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $38.95 | $21.85 |
| SHEE0027-009 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $59.08 | $47.06 |
| CARP0029-006 | SOFT FLOOR LAYER | $57.42 | $34.17 |
| SFNJ0669-006 | SPRINKLER FITTER(FIRE SPRINKLERS) | $59.19 | $36.51 |
| SFNJ0692-002 | SPRINKLER FITTER(FIRE SPRINKLERS) (WITHIN 15 MILES BEYOND THE CITY LIMITS OF PHILADELPHIA) | $60.83 | $30.34 |
| BRNJ0007-014 | TERRAZZO WORKER/SETTER | $61.77 | $42.82 |
| BRNJ0007-017 | TILE SETTER | $52.31 | $38.01 |
| BRNJ0007-017 | TILE Work grouting all epoxy$10.00 additional per day | $43.63 | $32.12 |
| TEAM0469-003 | TRUCK DRIVERDUMP TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other than the | $48.63 | $42.66 |
| TEAM0469-003 | TRUCK DRIVEROFF THE ROAD TRUCK (BURLINGTON COUNTY (EAST OF A LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site, in a zone requiring Level A personal protection for any workers other | $48.78 | $42.66 |
| TEAM0676-002 | TRUCK DRIVERDUMP TRUCK DRIVERS (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT r | $44.30 | $34.11 |
| TEAM0676-002 | TRUCK DRIVEROFF THE ROAD TRUCK (BURLINGTON COUNTY (WEST OF THE LINE DRAWN FROM THE NEW JERSEY TURNPIKE TO THE DELAWARE RIVER)) HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional. Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT r | $44.65 | $34.11 |