Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Jersey: Atlantic. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| LABO0008-001 | ASBESTOS REMOVAL The removal, abatement, enclosure and decontamination ofpersonal protective equipment, chemical protective clothing and machinery relating to asbestos and/or toxic and hazardous waste or materials which shall include but not necessarily be limited to: the erection, moving, servicing and dismantling of all enclosures, scaffolding and barricades; the operation of all tools and equipment normally used in the removal or abatement of asbestos and toxic or hazardous waste or materials; the labeling, bagging, cartoning, crating, or other packaging of materi | $28.37 | $21.62 |
| ASBE0089-004 | ASBESTOS WORKER/HEAT & FROST INSULATOR(includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead PAID HOLIDAYS: The last day prior to the Christmas and New Year's Day observed holiday: 4 hrs. pay | $55.80 | $40.80 |
| CARP0006-009 | CARPENTER(SCAFFOLD The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter | $57.42 | $34.17 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| CARP0006-010 | CARPENTER, INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORMWORK, BATT AND BLOWN INSULATION | $57.42 | $34.17 |
| PLAS0592-036 | CEMENT MASON/CONCRETE FINISHER | $53.21 | $33.42 |
| PAIN0711-018 | DRYWALL FINISHER/TAPER | $44.87 | $30.15 |
| ELEC0351-009 | ELECTRICIANTELEDATA TECHNICIANS: 16 VOICE DATA LINES OR MORE AND FIBER OPTICS | $41.00 | $32.75 |
| ELEC0351-009 | ELECTRICIANTELEDATA TECHNICIANS: 15 VOICE DATA LINES OR LESS | $41.00 | $32.75 |
| ELEC0351-011 | ELECTRICIANCABLE SPLICER ON LEAD CABLE | $46.51 | $34.39 |
| ELEC0351-011 | ELECTRICIAN AND CABLE SPLICER | $55.05 | $48.76 |
| ELEV0005-004 | ELEVATOR A. PAID VACATIONEmployer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day; Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day. | $71.85 | $38.44 |
| PAIN0021-035 | GLAZIER Work at 30 ft. above the working surface, or on a swing stage$1.00 per hour additional | $49.96 | $35.11 |
| IRON0399-011 | IRONWORKERREINFORCING | $53.24 | $38.40 |
| IRON0399-011 | IRONWORKERSTRUCTURAL AND ORNAMENTAL | $54.24 | $38.40 |
| LABO0077-002 | LABORERMASON TENDER: BRICK/CEMENT/CONCRETE | $36.50 | $30.22 |
| LABO0077-003 | LABORERASPHALT RAKER, ASPHALT SHOVELER, ASPHALT SPREADER, COMMON OR GENERAL LABORER, LANDSCAPTE LABORER, PIPELAYER, POWER TOOLE OPERATOR AND SCREEDMAN | $35.75 | $30.22 |
| BRNJ0007-012 | MARBLE SETTER | $64.66 | $40.97 |
| CARP0715-007 | MILLWRIGHT | $58.84 | $35.06 |
| PAIN0711-019 | PAINTER(SPRAY) | $45.55 | $29.86 |
| PAIN0711-019 | PAINTER(BRUSH & ROLLER) | $45.55 | $29.86 |
| PLUM0322-009 | PIPEFITTER(INCLUDING HVAC PIPE INSTALLATION) | $56.30 | $50.76 |
| PLAS0008-007 | PLASTERER | $38.37 | $31.64 |
| PLUM0322-009 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $56.30 | $50.76 |
| ENGI0825-017 | POWER EQUIPMENT OPERATORSGROUP 2 BACKHOE LOADER COMBO; CONCRETE PUMPER; GRADER/BLADE (FINISH); HOIST; HYDRAULIC CRANE, 10 TONS AND UNDER; FRONT END LOADER (2 CU. YD. BUT LESS THAN 5 CU. YD.); SCRAPER; SIDE BOOM HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON | $60.13 | $37.50 |
| ENGI0825-017 | POWER EQUIPMENT OPERATORSGROUP 1 BACKHOE, INCLUDING BACKHOE TRACK; BOOM; CONCRETE PAVING MACHINE; CRANE (ALL TYPES, INCLUDING OVERHEAD AND STRADDLE TRAVELING TYPE); DRILL (DOWN-THE-HOLE DRILL, ROTARY DRILL, SELF-PROPELLED HYDRAULIC DRILL, SELF-POWERED DRILL); ELEVATING GRADER; EXCAVATOR; FRONT END LOADER (5 CU. YD. AND OVER); PILEDRIVER (LENGTH OF BOOM, INCLUDING LENGTH OF LEADS, SHALL DETERMINE PREMIUM RATE APPLICABLE); TRENCHER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, | $61.72 | $37.50 |
| ENGI0825-017 | POWER EQUIPMENT OPERATORSGROUP 3 ASPHALT SPREADER; BULLDOZER;COMPRESSOR(2 OR 3) (IN BATTERY) (WITHIN 100 FT.); FORKLIFT; FRONT END LOADER (1 CU. YD. AND OVER BUT LESS THAN 2 CU. YD.); LULL; MAN LIFT/OUTSIDE ELEVATOR; MECHANIC; PAVER, ASPHALT; ROLLER, BLACKTOP; TRACTOR; HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER | $58.22 | $37.50 |
| ENGI0825-017 | POWER EQUIPMENT OPERATORSGROUP 4 BOBCAT/SKID LOADER; COMPRESSOR (SINGLE); FARM TRACTOR; FRONT END LOADER (UNDER 1 CU. YD.); HYDROSEEDER; ROLLER, GRADE; PUMP, HYDRAULIC HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPEN | $56.59 | $37.50 |
| ENGI0825-017 | POWER EQUIPMENT OPERATORSGROUP 5 OILER HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DAY, THANKSGIVING DAY AND CHRISTMAS DAY; PROVIDED 1) THAT THE WORKER W | $52.88 | $37.50 |
| ENGI0825-018 | POWER EQUIPMENT OPERATORS, STEEL ERECTION: (GROUP 2) ALL CRANES WITH BOOM INCLUDING JIB, LESS THAN 140 FT. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DA | $68.58 | $37.50 |
| ENGI0825-018 | POWER EQUIPMENT OPERATORS, STEEL ERECTION: (GROUP 1) ALL CRANES WITH BOOM INCLUDING JIB, 140 FT. AND OVER. HAZARDOUS WASTE REMOVAL WORK: WORK ON A STATE OR FEDERALLY DESIGNATED HAZARDOUS WASTE SITE, WHERE THE WORKER IS IN DIRECT CONTACT WITH HAZARDOUS MATERIAL, AND WHEN PERSONAL PROTECTIVE EQUIPMENT IS REQUIRED FOR RESPIRATORY, SKIN AND EYE PROTECTION: 20% PER HOUR ADDITIONAL. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY OBSERVED, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, PRESIDENTIAL ELECTION DAY, VETERAN'S DA | $70.24 | $37.50 |
| ROOF0030-027 | ROOFERALL OTHER Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $46.03 | $34.27 |
| ROOF0030-027 | ROOFERMopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $35.95 | $21.85 |
| ROOF0030-027 | ROOFERSLATE AND Mopper, and operator of felt-laying machine: $.50 per hour Work applying roofing material, on any new construction job, on those days on which a felt-laying machine or slag dispensing machine is used: $.50 per hour PAID HOLIDAY: The last working day before Christmas, to be paid at the rate of four hours pay | $38.95 | $21.85 |
| SHEE0027-009 | SHEET METAL WORKER(INCLUDING HVAC DUCT INSTALLATION) | $59.08 | $47.06 |
| CARP0029-006 | SOFT FLOOR LAYER | $57.42 | $34.17 |
| SFNJ0669-006 | SPRINKLER FITTER(FIRE SPRINKLERS) | $59.19 | $36.51 |
| BRNJ0007-013 | TERRAZZO FINISHER | $43.63 | $32.12 |
| BRNJ0007-017 | TILE FINISHER Work grouting all epoxy$10.00 additional per day | $43.63 | $32.12 |
| BRNJ0007-017 | TILE SETTER | $52.31 | $38.01 |
| TEAM0331-002 | TRUCK DRIVEROFF THE ROAD HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memor | $48.58 | $25.98 |
| TEAM0331-002 | TRUCK DRIVERDUMP TRUCK HAZARDOUS WASTE REMOVAL WORK: Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour Work on a state or federally designated hazardous waste site where the worker is not working in a zone requiring Level A, B or C personal protection: $1.00 per hour PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memoria | $48.23 | $25.98 |
| BRNJ0002-013 | Work on high stacks22% per hour additional | $45.20 | $33.26 |