Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Highway
Covers 1 county in New Hampshire: Rockingham. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNH2019-009 | CARPENTER(FORM WORK ONLY) | $24.02 | $2.82 |
| SUNH2019-009 | CARPENTER, EXCLUDES FORM WORK | $26.09 | $2.51 |
| SUNH2019-009 | CEMENT MASON/CONCRETE FINISHER | $22.44 | $0.00 |
| SUNH2019-009 | ELECTRICIAN | $28.08 | $2.78 |
| SUNH2019-009 | FENCE ERECTOR(CHAIN LINK FENCE) | $19.59 | $0.00 |
| SUNH2019-009 | HIGHWAY/PARKING LOT STRIPINGPAINTER | $21.63 | $0.00 |
| SUNH2019-009 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| INSTALLER - GUARDRAIL |
| $31.12 |
| $9.72 |
| SUNH2019-009 | IRONWORKER, REINFORCING | $22.71 | $8.19 |
| SUNH2019-009 | IRONWORKER, STRUCTURAL | $34.45 | $17.20 |
| SUNH2019-009 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $18.30 | $2.75 |
| SUNH2019-009 | LABORERCOMMON OR GENERAL | $19.15 | $2.60 |
| SUNH2019-009 | LABORERLANDSCAPE | $18.06 | $0.00 |
| SUNH2019-009 | LABORERPIPELAYER | $19.66 | $5.28 |
| SUNH2019-009 | OPERATORROLLER | $23.35 | $5.98 |
| SUNH2019-009 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.54 | $7.11 |
| SUNH2019-009 | OPERATORAUGER | $26.07 | $3.42 |
| SUNH2019-009 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $26.98 | $6.50 |
| SUNH2019-009 | OPERATORBROOM/SWEEPER | $25.73 | $0.00 |
| SUNH2019-009 | OPERATORBUCKET | $30.00 | $0.00 |
| SUNH2019-009 | OPERATORBULLDOZER | $25.99 | $6.75 |
| SUNH2019-009 | OPERATORCRANE | $29.56 | $3.29 |
| SUNH2019-009 | OPERATORGRADER/BLADE | $27.77 | $6.79 |
| SUNH2019-009 | OPERATORLOADER | $25.69 | $6.28 |
| SUNH2019-009 | OPERATORMECHANIC | $24.53 | $8.36 |
| SUNH2019-009 | OPERATORMILLING MACHINE | $28.55 | $6.88 |
| SUNH2019-009 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $25.32 | $6.23 |
| SUNH2019-009 | OPERATORPOUNDER | $36.82 | $10.41 |
| SUNH2019-009 | PAINTERSPRAY | $27.29 | $6.95 |
| SUNH2019-009 | TRAFFIC CONTROLFLAGGER | $13.17 | $1.37 |
| SUNH2019-009 | TRUCK DRIVERDUMP TRUCK | $19.47 | $3.22 |
| SUNH2019-009 | TRUCK DRIVERLOWBOY TRUCK | $22.76 | $5.07 |