Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Heavy
Covers 1 county in New Hampshire: Rockingham. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNH2015-011 | CARPENTER, INCLUDES FORM WORK | $28.17 | $8.09 |
| SUNH2015-011 | CEMENT MASON/CONCRETE FINISHER | $25.49 | $18.11 |
| ELEC0490-008 | ELECTRICIAN | $36.12 | $22.92 |
| IRON0007-039 | IRONWORKER(REINFORCING AND STRUCTURAL) | $33.65 | $26.12 |
| SUNH2015-011 | LABORERPIPELAYER | $30.35 | $17.03 |
| SUNH2015-011 | LABORERASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $23.70 | $1.54 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUNH2015-011 |
| LABORERCOMMON OR GENERAL |
| $18.61 |
| $4.49 |
| SUNH2015-011 | OPERATORBULLDOZER | $21.70 | $4.09 |
| SUNH2015-011 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $28.51 | $10.16 |
| SUNH2015-011 | OPERATORDRILL | $28.78 | $15.26 |
| SUNH2015-011 | OPERATORLOADER | $30.49 | $19.06 |
| SUNH2015-011 | OPERATORPAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $27.10 | $5.69 |
| SUNH2015-011 | OPERATORROLLER | $23.02 | $4.52 |
| SUNH2015-011 | OPERATORCRANE | $29.91 | $6.60 |
| SUNH2015-011 | PAINTER(BRUSH AND ROLLER) | $33.55 | $19.15 |
| PLUM0131-005 | PIPEFITTER | $45.76 | $26.19 |
| SUNH2015-011 | TRAFFIC CONTROLFLAGGER | $17.24 | $1.54 |
| SUNH2015-011 | TRUCK DRIVERDUMP TRUCK | $19.02 | $5.73 |