Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in New Hampshire: Hillsborough. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0006-014 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 |
| BOIL0029-003 | BOILERMAKER | $42.83 | $25.29 |
| BRNH0003-001 | BRICKLAYER | $43.91 | $28.47 |
| SUNH2015-007 | CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION | $24.43 | $6.49 |
| SUNH2015-007 | CEMENT MASON/CONCRETE FINISHER | $27.70 | $2.61 |
| SUNH2015-007 | DRYWALL FINISHER/TAPER | $28.67 | $11.69 |
| ELEC0490-006 | ELECTRICIAN |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $36.12 |
| $22.92 |
| ELEV0004-007 | ELEVATOR MECHANIC A. PAID HOLIDAYSNEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, CHRISTMAS DAY AND THE FRIDAY AFTER THANKSGIVING. B. VACATION: EMPLOYER CONTRIBUTES 8% OF BASIC HOURLY RATE FOR 5 YEARS OR MORE OF SERVICE; 6% OF BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT | $74.17 | $38.44 |
| SUNH2015-007 | GLAZIER | $27.74 | $3.74 |
| SUNH2015-007 | IRONWORKER, REINFORCING | $22.60 | $19.89 |
| SUNH2015-007 | IRONWORKER, STRUCTURAL | $24.05 | $12.75 |
| SUNH2015-007 | LABORERMASON TENDER - BRICK | $17.01 | $4.43 |
| SUNH2015-007 | LABORERCOMMON OR GENERAL | $17.46 | $9.86 |
| SUNH2015-007 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $24.08 | $4.75 |
| SUNH2015-007 | OPERATORCRANE | $27.42 | $3.83 |
| SUNH2015-007 | OPERATORLOADER | $22.54 | $2.29 |
| SUNH2015-007 | OPERATORROLLER | $23.56 | $3.28 |
| SUNH2015-007 | PAINTER(BRUSH AND ROLLER) | $20.00 | $3.28 |
| SUNH2015-007 | PAINTERSPRAY | $22.99 | $3.28 |
| SUNH2015-007 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION | $25.17 | $11.87 |
| SUNH2015-007 | PLUMBER | $23.97 | $9.68 |
| SUNH2015-007 | ROOFER | $17.55 | $3.25 |
| SUNH2015-007 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $33.83 | $10.09 |
| SUNH2015-007 | SPRINKLER FITTER(FIRE SPRINKLERS) | $31.29 | $9.78 |
| SUNH2015-007 | WATERPROOFER | $31.22 | $3.70 |