Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in New Hampshire: Cheshire, Sullivan. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0006-014 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $44.36 | $36.63 |
| SUNH2015-006 | CARPENTER, INCLUDES DRYWALL HANGING | $21.46 | $4.22 |
| SUNH2015-006 | CEMENT MASON/CONCRETE FINISHER | $23.55 | $7.14 |
| ELEC0490-005 | ELECTRICIAN | $36.12 | $22.92 |
| SUNH2015-006 | IRONWORKER, REINFORCING | $29.89 | $10.70 |
| IRON0007-040 | IRONWORKER, STRUCTURAL | $33.65 | $26.12 |
| LABO0668-001 | LABORERCOMMON OR GENERAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $25.40 |
| $21.43 |
| SUNH2015-006 | LABORERMASON TENDER - BRICK | $19.60 | $2.73 |
| SUNH2015-006 | LABORERMASON TENDER - CEMENT/CONCRETE | $20.85 | $2.61 |
| SUNH2015-006 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.52 | $3.17 |
| SUNH2015-006 | PAINTER(BRUSH AND ROLLER) | $20.62 | $0.00 |
| PLUM0131-003 | PIPEFITTER | $45.76 | $26.19 |
| SUNH2015-006 | PLUMBER | $25.77 | $9.23 |
| SUNH2015-006 | ROOFER | $18.87 | $0.00 |
| SUNH2015-006 | SHEET METAL WORKER, INCLUDES HVAC DUCT INSTALLATION | $26.56 | $24.03 |
| SUNH2015-006 | TRUCK DRIVERDUMP TRUCK | $17.43 | $3.60 |