Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 2 counties in Nebraska: Otoe, Pawnee. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRNE0001-001 | BRICKLAYER | $34.80 | $19.94 |
| SUNE2012-020 | CARPENTER, INCLUDES FORM WORK | $16.10 | $1.46 |
| SUNE2012-020 | CEMENT MASON/CONCRETE FINISHER | $17.54 | $1.41 |
| ELEC0265-003 | ELECTRICIAN ZONE 10 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.00 | $18.88 |
| ELEC0265-003 | ELECTRICIAN ZONE 236 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 |
| ELEC0265-003 | ELECTRICIAN ZONE 351 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0265-003 | ELECTRICIAN ZONE 476 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 |
| ELEV0028-001 | ELEVATOR MECHANIC FOOTNOTEA. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $55.88 | $38.44 |
| SUNE2012-020 | IRONWORKER, STRUCTURAL | $22.96 | $4.50 |
| LABO1140-010 | LABORER(MASON TENDER, BRICK & HOD) | $24.00 | $13.48 |
| SUNE2012-020 | LABORERCOMMON OR GENERAL | $14.54 | $3.63 |
| SUNE2012-020 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.82 | $2.22 |
| SUNE2012-020 | OPERATORLOADER | $16.58 | $0.94 |
| PLUM0464-003 | PIPEFITTER(DOES NOT INCLUDE HVAC PIPING) | $46.25 | $21.10 |
| SUNE2012-020 | PLUMBER | $26.55 | $8.87 |
| SUNE2012-020 | PLUMBER(HVAC PIPE INSTALLATION) | $25.55 | $7.54 |
| SUNE2012-020 | ROOFER | $14.52 | $0.65 |
| SHEE0003-006 | SHEET METAL WORKER(INCLUDES HVAC DUCT INSTALLATION) | $39.65 | $19.87 |
| SUNE2012-020 | TRUCK DRIVERDUMP, LOWBOY AND TANDEM | $14.56 | $1.68 |