Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Nebraska: Lancaster. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNE2011-032 | BRICKLAYER | $24.44 | $0.00 |
| CARP0427-002 | CARPENTER(INCLUDING ACOUSTICAL CEIING INSTALLATION) | $33.42 | $18.66 |
| SUNE2011-032 | CARPENTER | $18.50 | $1.80 |
| SUNE2011-032 | CEMENT MASON/CONCRETE FINISHER | $15.73 | $2.06 |
| SUNE2011-032 | ELECTRICIAN(LOW VOLTAGE WIRING) | $20.15 | $4.84 |
| SUNE2011-032 | ELECTRICIANALARM INSTALLATION | $19.68 | $4.12 |
| ELEC0265-003 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN ZONE 10 TO 35 MILES FROM THE MAIN POST OFFICE IN LINCOLN |
| $35.00 |
| $18.88 |
| ELEC0265-003 | ELECTRICIAN ZONE 236 TO 50 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.30 | $18.91 |
| ELEC0265-003 | ELECTRICIAN ZONE 351 TO 75 MILES FROM THE MAIN POST OFFICE IN LINCOLN | $35.60 | $18.94 |
| ELEC0265-003 | ELECTRICIAN ZONE 476 MILES AND OVER FROM THE MAIN POST OFFICE IN LINCOLN | $36.00 | $18.99 |
| ELEV0028-001 | ELEVATOR MECHANIC FOOTNOTEA. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $55.88 | $38.44 |
| SUNE2011-032 | FORM WORKER | $14.97 | $2.06 |
| IRON0021-002 | IRONWORKER, STRUCTURAL | $39.00 | $22.30 |
| LABO1140-003 | LABORER(MASON TENDER, BRICK & HOD) | $24.00 | $13.48 |
| SUNE2011-032 | LABORERCOMMON OR GENERAL | $12.03 | $0.00 |
| ENGI0571-004 | OPERATORCRANE | $36.44 | $18.69 |
| ENGI0571-004 | OPERATORFORKLIFT | $31.06 | $18.69 |
| SUNE2011-032 | OPERATORLOADER | $19.27 | $4.00 |
| SUNE2011-032 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $20.68 | $4.93 |
| SUNE2011-032 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $21.72 | $2.10 |
| SUNE2011-032 | PAINTERBRUSH, ROLLER AND SPRAY | $14.26 | $0.00 |
| PLUM0464-007 | PIPEFITTERINCLUDING HVAC PIPE INSTALLATION | $46.25 | $21.10 |
| SUNE2011-032 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $22.89 | $6.04 |
| SUNE2011-032 | ROOFER | $13.57 | $0.77 |
| SHEE0003-002 | SHEET METAL WORKER(EXCLUDES INSTALLATION OF HVAC DUCT) | $39.65 | $19.87 |
| SUNE2011-032 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $21.89 | $6.30 |
| SUNE2011-032 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $14.09 | $2.49 |