Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Nebraska: Douglas. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRNE0001-001 | BRICKLAYER | $34.80 | $19.94 |
| CARP0427-001 | CARPENTER(INCLUDING ACOUSTICAL CEILING INSTALLATION) | $33.42 | $18.66 |
| CARP0427-004 | CARPENTER(DRYWALL HANGING, FINISHING/TAPING ONLY) | $33.42 | $18.66 |
| SUNE2011-031 | CAULKER | $17.13 | $0.00 |
| SUNE2011-031 | CEMENT MASON/CONCRETE FINISHER | $18.44 | $4.08 |
| ELEC0022-001 | ELECTRICIAN | $46.40 | $20.89 |
| SUNE2011-031 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELECTRICIAN(LOW VOLTAGE WIRING) |
| $21.54 |
| $5.99 |
| ELEV0028-001 | ELEVATOR MECHANIC FOOTNOTEA. VACATION PAY: 8% FOR PERSONS WITH 5 OR MORE YEARS OF SERVICE, 6% FOR PERSONS WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $55.88 | $38.44 |
| SUNE2011-031 | FORM WORKER | $19.07 | $3.84 |
| SUNE2011-031 | GLAZIER | $17.67 | $1.71 |
| IRON0021-002 | IRONWORKER, STRUCTURAL | $39.00 | $22.30 |
| LABO1140-003 | LABORER(MASON TENDER, BRICK & HOD) | $24.00 | $13.48 |
| SUNE2011-031 | LABORERCOMMON OR GENERAL | $15.47 | $5.34 |
| ENGI0571-004 | OPERATORFORKLIFT | $31.06 | $18.69 |
| ENGI0571-004 | OPERATORCRANE | $36.44 | $18.69 |
| SUNE2011-031 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $22.55 | $5.72 |
| SUNE2011-031 | OPERATORBOBCAT/SKID STEER/SKID LOADER | $23.11 | $0.91 |
| SUNE2011-031 | OPERATORLOADER | $20.76 | $4.64 |
| SUNE2011-031 | PAINTERBRUSH, ROLLER AND SPRAY | $14.26 | $0.00 |
| PLUM0464-006 | PIPEFITTER(INCLUDES HVAC PIPE INSTALLATION AND EXCLUDES HVAC SYSTEM INSTALLATION) | $46.25 | $21.10 |
| PLUM0016-003 | PLUMBER(EXCLUDING HVAC PIPE INSTALLATION) | $44.26 | $16.90 |
| SUNE2011-031 | ROOFER | $13.57 | $0.77 |
| SHEE0003-001 | SHEET METAL WORKER(INCLUDING HVAC DUCT & SYSTEM INSTALLATION) | $39.65 | $19.87 |
| SFNE0669-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $43.79 | $28.35 |
| SUNE2011-031 | TRUCK DRIVER, INCLUDES DUMP AND TANDEM TRUCK | $14.77 | $1.41 |