Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in North Carolina: Craven, Jones, Pamlico. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUNC2018-018 | BRICKLAYER | $19.13 | $0.00 |
| SUNC2018-018 | CARPENTER | $19.80 | $4.89 |
| SUNC2018-018 | CEMENT MASON/CONCRETE FINISHER | $16.72 | $0.00 |
| SUNC2018-018 | ELECTRICIAN | $22.15 | $5.93 |
| IRON0848-003 | IRONWORKER | $29.75 | $18.00 |
| SUNC2018-018 | LABORERMASON TENDER - CEMENT/CONCRETE | $15.26 | $0.00 |
| SUNC2018-018 | LABORERCOMMON OR GENERAL |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $12.94 |
| $2.33 |
| SUNC2018-018 | LABORERMASON TENDER - BRICK | $13.17 | $0.00 |
| SUNC2018-018 | LABORERPIPELAYER | $16.07 | $3.22 |
| SUNC2018-018 | OPERATORBACKHOE/EXCAVATOR/TRACKHOE | $21.00 | $2.89 |
| SUNC2018-018 | OPERATORBULLDOZER | $17.54 | $2.63 |
| SUNC2018-018 | OPERATORFORKLIFT | $16.75 | $0.00 |
| SUNC2018-018 | OPERATORGRADER/BLADE | $22.68 | $3.27 |
| SUNC2018-018 | OPERATORROLLER | $15.31 | $1.46 |
| SUNC2018-018 | PAINTER | $15.55 | $1.05 |
| PLUM0421-006 | PIPEFITTER | $33.96 | $13.48 |
| SUNC2018-018 | PLUMBER | $23.11 | $0.00 |
| SUNC2018-018 | ROOFER | $18.26 | $4.38 |
| SUNC2018-018 | SHEET METAL WORKER | $19.67 | $13.27 |
| SUNC2018-018 | TRUCK DRIVERDUMP TRUCK | $15.98 | $2.93 |