Pulling the wage determination…
Revision 2 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Montana: Missoula. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 2). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0011-002 | BOILERMAKER | $38.75 | $32.31 |
| BRMT0007-002 | BRICKLAYER | $33.11 | $16.69 |
| CARP0028-008 | CARPENTERINCLUDING DRYWALL HANGING, METAL STUD INSTALLATION, AND FORMWORK. ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 | $32.05 | $15.02 |
| ELEC0768-008 | ELECTRICIAN | $40.71 | $17.94 |
| ELEV0019-005 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $67.61 |
| $38.44 |
| ASBE0082-002 | HEAT AND FROST INSULATOR | $43.81 | $21.87 |
| IRON0014-014 | IRONWORKER, STRUCTURAL, REINFORCING AND ORNAMENTAL | $32.08 | $29.06 |
| LABO1686-007 | LABORER, ZONE 1COMMON OR GENERAL ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 |
| LABO1686-007 | LABORER, ZONE 1MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 |
| CARP0028-008 | MILLWRIGHT. ZONE DEFINITIONTHE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 | $33.00 | $13.57 |
| SUMT2011-039 | OPERATORBACKHOE | $20.56 | $6.35 |
| PAIN0260-003 | PAINTERBRUSH AND SPRAY | $18.35 | $6.84 |
| SUMT2011-039 | PAINTERROLLER | $17.00 | $0.00 |
| PLUM0459-006 | PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $42.80 | $17.28 |
| PLUM0459-006 | PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $42.80 | $17.28 |
| ENGI0400-004 | POWER EQUIPMENT OPERATORZONE 1: (2) EXCAVATOR ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PAY + $5.50 | $32.88 | $16.20 |
| ENGI0400-004 | POWER EQUIPMENT OPERATORZONE 1: (1) CRANE, FORKLIFT, FRONT END LOADER ZONE DEFINITIONS FOR POWER EQUPMENT OPERATORS: THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE NEAREST COUNTY COURT HOUSE OF THE FOLLOWING LISTED TOWNS TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, MISSOULA ZONE 1: 0 TO 30 MILES - BASE PAY ZONE 2: 30 TO 60 MILES - BASE PAY + $3.50 ZONE 3: OVER 60 MILES - BASE PA | $31.51 | $16.20 |
| ROOF0189-003 | ROOFER | $30.97 | $13.46 |
| SHEE0103-008 | SHEET METAL WORKER(HVAC DUCT AND SYSTEM INSTALLATION ONLY) | $40.07 | $22.07 |
| SFMT0669-002 | SPRINKLER FITTER(FIRE SPRINKLERS) | $39.97 | $24.40 |