Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Montana: Deer Lodge. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BOIL0011-002 | BOILERMAKER | $38.75 | $32.31 |
| BRMT0001-003 | BRICKLAYER | $33.11 | $17.18 |
| SUMT2011-006 | CARPENTER, EXCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING, AND FORMWORK | $20.51 | $7.13 |
| CARP0082-001 | CARPENTERSACOUSTICAL CEILING INSTALLATION, DRYWALL FINISHING/TAPING, DRYWALL HANGING AND FORMWORK ONLY ZONE DEFINITION: THE HOURLY RATE APPLICABLE TO EACH PROJECT IS DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING TOWNS TO THE CETER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, GREAT FALLS, HELENA, KALISPELL, LEWISTON, MILES CITY, AND MISSOULA ZONE 1: 0 TO 30 MILES - BASE RATE ZONE 2: 31 TO 60 MILES - $4.00 ZONE 3: OVER 60 MILES - $6.00 | $30.24 | $14.33 |
| SUMT2011-006 | CEMENT MASON/CONCRETE FINISHER | $18.27 | $1.50 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0233-014 | ELECTRICIAN | $40.00 | $19.88 |
| ELEV0019-005 | ELEVATOR MECHANIC FOOTNOTEA. EMPLOYER CONTRIBUTES 8% OF THE BASIC HOURLY RATE FOR OVER 5 YEAR'S SERVICE AND 6% OF THE BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING AND CHRISTMAS DAY | $67.61 | $38.44 |
| SUMT2011-006 | GLAZIER | $17.93 | $2.62 |
| ASBE0082-002 | HEAT AND FROST INSULATOR | $43.81 | $21.87 |
| IRON0732-013 | IRONWORKERREINFORCING AND STRUCTURAL | $36.83 | $25.30 |
| SUMT2011-006 | LABORERCOMMON OR GENERAL | $17.77 | $5.23 |
| LABO1686-006 | LABORER, ZONE 1MASON TENDER-BRICK ZONE DEFINITIONS FOR LABORERS THE ZONE HOURLY RATES APPLICABLE TO EACH PROJECT SHALL BE DETERMINED BY MEASURING THE ROAD MILES OVER THE SHORTEST PRACTICAL MAINTAINED ROUTE FROM THE COUNTY COURTHOUSE OF THE FOLLOWING LISTED TOWN TO THE CENTER OF THE JOB: BILLINGS, BOZEMAN, BUTTE, HELENA, GREAT FALLS, MISSOULA, KALISPELL TRAVEL ZONES: ZONE 1: 0 TO 30 MILES, BASE PAY ZONE 2: 30-60, ADD $3.05 TO BASE PAY ZONE 3: OVER 60 MILES, ADD $4.85 TO BASE PAY | $23.05 | $12.72 |
| SUMT2011-006 | OPERATORCRANE | $24.04 | $7.41 |
| SUMT2011-006 | OPERATOREXCAVATOR | $22.20 | $6.75 |
| SUMT2011-006 | OPERATORFORKLIFT | $21.44 | $8.05 |
| SUMT2011-006 | PAINTERBRUSH, ROLLER AND SPRAY, EXCLUDES DRYWALL FINISHING/TAPING | $19.18 | $0.00 |
| PLUM0041-008 | PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 |
| PLUM0041-008 | PLUMBER, INCLUDES HVAC PIPE INSTALLATION | $46.45 | $19.92 |
| SUMT2011-006 | ROOFER | $15.48 | $5.28 |
| SHEE0103-009 | SHEET METAL WORKER(HVAC DUCT INSTALLATION ONLY) | $40.00 | $22.07 |
| SFMT0669-002 | SPRINKLER FITTER(FIRE SPRINKLERS) | $39.97 | $24.40 |
| SUMT2011-006 | TRUCK DRIVERDUMP TRUCK | $19.36 | $5.37 |