Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 6 counties in Montana: Chouteau, Judith Basin, Liberty, Pondera, Teton, Toole. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| SUMT1992-018 | BRICKLAYER | $10.50 | $1.15 |
| SUMT1992-018 | CARPENTER | $8.64 | $1.22 |
| SUMT1992-018 | CEMENT MASON/CONCRETE FINISHER | $8.35 | $0.44 |
| SUMT1992-018 | ELECTRICIAN | $10.35 | $0.86 |
| SUMT1992-018 | LABORER | $7.53 | $0.00 |
| SUMT1992-018 | PAINTERBRUSH ONLY | $7.25 | $0.00 |
| SUMT1992-018 | PLUMBER | $11.60 | $1.71 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| SUMT1992-018 | POWER EQUIPMENT OPERATORTRACK TYPE FRONT END LOADERS UP TO & INCLUDING 5 CU YD | $10.46 | $1.50 |
| SUMT1992-018 | ROOFER | $9.20 | $0.00 |
| SUMT1992-018 | TRUCK DRIVERSCOMBINATION TRUCK, CONCRETE MIXER AND TRANSIT MIXER OVER 4 CU YD TO & INCLUDING 6 CU YD | $9.09 | $1.15 |
| SUMT1992-018 | TRUCK DRIVERSDUMPSTER | $8.89 | $1.15 |
| SUMT1992-018 | TRUCK DRIVERSLUMBER CARRIER, LIFT TRUCK, AND FORK LIFT | $9.01 | $1.15 |
| SUMT1992-018 | TRUCK DRIVERSPICKUP HAULING MATERIALS | $8.86 | $1.15 |