Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 3 counties in Missouri: Callaway, Cole, Osage. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRMO0015-015 | BRICKLAYER | $32.79 | $20.52 |
| CARP1011-003 | CARPENTER | $31.51 | $22.25 |
| PLAS0518-012 | CEMENT MASON/CONCRETE FINISHER | $33.52 | $15.88 |
| ELEC0257-004 | ELECTRICIAN | $40.50 | $23.26 |
| ASBE0001-006 | HEAT & FROST INSULATOR(INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $37.48 | $27.36 |
| IRON0010-003 | IRONWORKER | $39.00 | $34.25 |
| LABO0110-007 | LABORERPIPELAYER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $40.82 |
| $17.56 |
| LABO0662-002 | LABORERCOMMON OR GENERAL | $28.78 | $16.05 |
| LABO1104-007 | LABORERMASON TENDER - CEMENT/CONCRETE | $31.80 | $14.91 |
| SUMO2020-014 | PAINTER | $24.14 | $9.67 |
| PLUM0562-020 | PIPEFITTER | $52.60 | $29.93 |
| PLUM0562-019 | PLUMBER | $52.60 | $29.93 |
| ENGI0513-024 | POWER EQUIPMENT OPERATORFORKLIFT | $39.06 | $30.38 |
| ENGI0513-024 | POWER EQUIPMENT OPERATORCRANE | $39.06 | $30.38 |
| ENGI0513-024 | POWER EQUIPMENT OPERATORBOBCAT/SKID STEER/SKID LOADER | $39.06 | $30.38 |
| ENGI0513-024 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | $30.38 |
| ENGI0513-024 | POWER EQUIPMENT OPERATOROILER | $39.06 | $30.38 |
| ENGI0513-024 | POWER EQUIPMENT OPERATOR(LOADER) | $39.06 | $30.38 |
| ENGI0513-027 | POWER EQUIPMENT OPERATORBULLDOZER | $45.96 | $30.57 |
| ROOF0020-026 | ROOFER | $33.60 | $19.93 |
| SHEE0036-038 | SHEET METAL WORKER | $36.51 | $22.39 |
| BRMO0018-003 | TILE SETTER | $34.09 | $20.36 |