Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 2 counties in Missouri: Boone, Howard. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRMO0015-019 | BRICKLAYER | $32.79 | $21.31 |
| SUMO2011-011 | CARPENTER | $18.33 | $1.32 |
| SUMO2011-011 | CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 |
| ELEC0257-013 | ELECTRICIAN | $18.23 | $9.91 |
| LABO0955-010 | LABORERCOMMON OR GENERAL | $23.94 | $15.80 |
| LABO0955-010 | LABORER(BRICK MASON TENDER) | $23.94 | $15.80 |
| PAIN1185-007 | PAINTER |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| $28.56 |
| $17.21 |
| PLUM0562-003 | PLUMBER(MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK $7.0 MILLION & UNDER) | $50.60 | $29.38 |
| PLUM0562-003 | PLUMBER(MECHANICAL CONTRACTS INCLUDING ALL PIPING AND TEMPERATURE CONTROL WORK OVER $7.0 MILLION) | $50.60 | $29.38 |
| ENGI0101-036 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR (HOWARD COUNTY) | $45.48 | $22.42 |
| ENGI0101-036 | POWER EQUIPMENT OPERATORROLLER (HOWARD COUNTY) | $45.48 | $22.42 |
| ENGI0513-021 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR (BOONE COUNTY) | $34.61 | $29.50 |
| ENGI0513-021 | POWER EQUIPMENT OPERATORROLLER (BOONE COUNTY) | $34.61 | $29.50 |
| ROOF0020-012 | ROOFER | $33.60 | $19.99 |
| SHEE0002-032 | SHEET METAL WORKERINCLUDING HVAC DUCT AND HVAC SYSTEM (HOWARD COUNTY) | $27.37 | $8.14 |
| SHEE0036-031 | SHEET METAL WORKERINCLUDING HVAC DUCT AND HVAC SYSTEM (BOONE COUNTY) | $36.51 | $22.39 |