Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Residential
Covers 1 county in Missouri: Franklin. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| BRMO0001-002 | BRICKLAYER | $41.15 | $23.90 |
| CARP0002-013 | CARPENTER(DRYWALL HANGING ONLY) | $36.90 | $21.55 |
| SUMO2011-006 | CARPENTER, EXCLUDES DRYWALL HANGING | $18.85 | $0.00 |
| SUMO2011-006 | CEMENT MASON/CONCRETE FINISHER | $16.00 | $0.00 |
| ELEC0001-008 | ELECTRICIAN | $44.36 | $11.53 |
| LABO0840-010 | LABORERBRICK MASON TENDER (PROJECTS $500,000 AND OVER:) | $33.68 | $14.86 |
| LABO0840-010 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| LABORERBRICK MASON TENDER (PROJECTS UNDER $500,000:) |
| $32.18 |
| $14.86 |
| LABO0840-010 | LABORERCOMMON OR GENERAL (PROJECTS $500,000 AND OVER:) | $33.48 | $14.86 |
| LABO0840-010 | LABORERCOMMON OR GENERAL (PROJECTS UNDER $500,000:) | $31.98 | $14.86 |
| PAIN0002-003 | PAINTER(DRYWALL FINISHING/TAPING) | $38.60 | $17.66 |
| PAIN0002-003 | PAINTERBRUSH & ROLLER | $38.60 | $17.66 |
| PLUM0562-009 | PLUMBER | $52.60 | $29.93 |
| ENGI0513-018 | POWER EQUIPMENT OPERATORBACKHOE/EXCAVATOR | $41.01 | $29.63 |
| ENGI0513-018 | POWER EQUIPMENT OPERATORROLLER | $41.01 | $29.63 |
| ROOF0002-007 | ROOFER | $40.00 | $22.05 |
| SHEE0036-007 | SHEET METAL WORKER(INCLUDING INSTALLATION OF HVAC DUCT AND HVAC SYSTEM) | $52.00 | $27.12 |
| SFMO0268-001 | SPRINKLER FITTER(FIRE SPRINKLERS) | $52.32 | $28.96 |