Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Missouri: Shannon. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0063-002 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $31.97 | $14.00 |
| BRMO0015-004 | BRICKLAYER | $33.67 | $19.48 |
| CARP1310-005 | CARPENTER(FLOOR LAYER) (VINYL INSTALLATION ONLY) | $40.08 | $21.85 |
| CARP0013-002 | CARPENTER, INCLUDING FORMWORK(PROJECTS UNDER $1.5 MILLION) | $33.05 | $21.85 |
| CARP0013-002 | CARPENTER, INCLUDING FORMWORK(PROJECTS $1.5 MILLION AND OVER) | $36.57 | $21.85 |
| PLAS0527-006 | CEMENT MASON/CONCRETE FINISHER | $36.63 | $9.85 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| ELEC0453-006 | ELECTRICIAN | $32.40 | $19.11 |
| ELEV0003-001 | ELEVATOR MECHANIC. FOOTNOTESA) EMPLOYER CONTRIBUTES 8% OF REGULAR BASIC HOURLY RATE AS AS VACATION PAY CREDIT FOR EMPLOYEES WITH MORE THAN 5 YEARS OF SERVICE, AND 6% FOR LESS THAN 5 YEARS OF SERVICE B) EIGHT PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY FRIDAY AFTER THANKSGIVING DAY, VETERANS' DAY AND CHRISTM | $62.73 | $38.44 |
| IRON0396-012 | IRONWORKERREINFORCING AND STRUCTURAL | $41.67 | $31.25 |
| LABO0840-004 | LABORER(BRICK MASON TENDER) | $32.23 | $15.91 |
| SUMO2010-022 | LABORERCOMMON OR GENERAL | $25.00 | $0.00 |
| SUMO2010-022 | OPERATORGRADER/BLADE | $22.80 | $10.78 |
| SUMO2010-022 | PAINTERBRUSH ONLY | $16.44 | $6.01 |
| SUMO2010-022 | PAINTERROLLER | $16.44 | $6.01 |
| SUMO2010-022 | PAINTERSPRAY | $18.79 | $8.12 |
| PLUM0562-011 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| PLUM0562-011 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 |
| PLUM0562-011 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 |
| PLUM0562-011 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| ENGI0513-010 | POWER EQUIPMENT OPERATOR(LOADER) | $39.06 | $30.38 |
| ENGI0513-010 | POWER EQUIPMENT OPERATOR(PAVER) | $39.06 | $30.38 |
| ENGI0513-010 | POWER EQUIPMENT OPERATORROLLER | $39.06 | $30.38 |
| ENGI0513-010 | POWER EQUIPMENT OPERATORBULLDOZER | $39.06 | $30.38 |
| ENGI0513-010 | POWER EQUIPMENT OPERATOR(BACKHOE/EXCAVATOR/ TRACKHOE) | $39.06 | $30.38 |
| ROOF0002-011 | ROOFER | $32.25 | $17.46 |
| SHEE0036-025 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $34.43 | $17.86 |
| SFMO0669-003 | SPRINKLER FITTER(FIRE SPRINKLERS) | $45.94 | $27.53 |
| BRMO0015-018 | TILE SETTER | $26.47 | $14.89 |
| SUMO2010-022 | TRUCK DRIVERDUMP TRUCK | $25.57 | $0.00 |