Pulling the wage determination…
Revision 1 · modified May 18, 2026 · published May 18, 2026 · Building
Covers 1 county in Missouri: Ralls. View the source document on SAM.gov.
DOL marked this determination modified May 18, 2026 (revision 1). Line-level rate diffs begin from the next revision we observe — this determination was modified before we began tracking it, so we can’t show which lines changed. Verify the current rates on SAM.gov.
| Identifier | Classification | Base | Fringe |
|---|---|---|---|
| ASBE0001-005 | ASBESTOS WORKER/HEAT & FROST INSULATOR | $43.48 | $27.24 |
| BRMO0001-001 | BRICKLAYER | $41.15 | $23.90 |
| CARP0008-002 | CARPENTER, EXCLUDES FORM WORK | $35.49 | $21.85 |
| SUMO2010-019 | CEMENT MASON/CONCRETE FINISHER | $18.86 | $7.50 |
| ELEC0350-006 | ELECTRICIAN | $37.60 | $22.14 |
| SUMO2010-019 | FORM WORKER | $26.44 | $0.00 |
| SUMO2010-019 | GLAZIER | $14.19 | $5.19 |
Parsed from the SAM.gov document, synced July 18, 2026. Unparsed blocks are logged, never guessed. Verify against the source document before filing.
| IRON0396-012 | IRONWORKERREINFORCING AND STRUCTURAL | $41.67 | $31.25 |
| LABO0955-002 | LABORER(BRICK MASON TENDER) | $29.71 | $15.50 |
| LABO0955-002 | LABORER(LANDSCAPE) | $27.71 | $15.50 |
| SUMO2010-019 | LABORERCOMMON OR GENERAL | $22.23 | $0.00 |
| SUMO2010-019 | OPERATORBACKHOE/TRACKHOE | $31.12 | $0.00 |
| PAIN0002-008 | PAINTER(BRUSH & ROLLER ONLY) | $28.75 | $12.58 |
| SUMO2010-019 | PAINTERSPRAY | $18.79 | $8.12 |
| PLUM0562-011 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 |
| PLUM0562-011 | PIPEFITTER, INCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| PLUM0562-011 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK OVER $7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS ST. LOUIS AREA WAGES AND FRINGES.) | $52.60 | $29.93 |
| PLUM0562-011 | PLUMBER, EXCLUDES HVAC PIPE INSTALLATION(ON ANY WORK UNDER 7.0 MILLION TOTAL OF ALL PROJECT MECHANICAL CONTRACTS OUTSTATE AREA WAGES AND FRINGES) | $50.66 | $23.34 |
| ENGI0513-009 | POWER EQUIPMENT OPERATORROLLER | $39.06 | $30.38 |
| ENGI0513-009 | POWER EQUIPMENT OPERATOR(PAVER) | $39.06 | $30.38 |
| ENGI0513-009 | POWER EQUIPMENT OPERATOR(LOADER) | $39.06 | $30.38 |
| ENGI0513-009 | POWER EQUIPMENT OPERATORGRADER/BLADE | $39.06 | $30.38 |
| ENGI0513-009 | POWER EQUIPMENT OPERATORBULLDOZER | $39.06 | $30.38 |
| ROOF0020-012 | ROOFER | $33.60 | $19.99 |
| SHEE0036-017 | SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $52.00 | $27.12 |
| BRMO0018-001 | TILE SETTER | $34.09 | $19.91 |
| SUMO2010-019 | TRUCK DRIVERDUMP TRUCK | $28.92 | $0.00 |